Montigo Indoor/Outdoor Sealing Kit For R-ST Operating instructions

  • Hello! I am an AI chatbot trained to assist you with the Montigo Indoor/Outdoor Sealing Kit For R-ST Operating instructions. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
IOSK - 180404
Installation
IOSK*
R SERIES ST INDOOR OUTDOOR SEAL KIT
Follow the instructions for the unit installation in the up to Step 1 on
Page 7 of the installation guide.
The unit is in place with the screws removed as illustrated there.
49.25
28.12 16.56
37.69
40.94
19.80
2.90
IOSK3-A03
IOSK3-A02
IOSK3-A01
320-368
STEP 1: Back frame the unit with the metal header supplied by Montigo
above the unit and either combustible or non-combustible framing to the
sides and bottom maintaining clearances as shown and ensuring the
gallvanized apron (Fig 1, Part No. 320-368) can be attached to the framing.
Figure 1: Indoor/ Outdoor Sealing Kit Ccmponents
Figure 2: Backframe unit
CLEARANCE TO COMBUSTIBLES:
6" Top, 3" each side, 3" bottom from the protruding window box.
Figure 3: Attach galvanized apron to unit
STEP 4: Attach the stainless steel frame (Fig. 1, Part No. IOSK3-A01)
to the galvanized frame lining up the holes around perimeter. Secure in
place through holes across the top and down the sides. Do not secure
the bottom ange.
STEP 5: Apply approved waterproong membrane over the ange of
the frame on the top and sides and under the ange of the frame at
the bottom. The membrane should overlap the frame approximately 2"
around the perimeter.
STEP 6: All facing materials may now be installed over the frame.
BE CERTAIN TO MAINTAIN 6" ABOVE AND 3" ON SIDES AND BOTTOM
TO ANY COMBUSTIBLE MATERIAL
STEP 2: Place the galvanized apron and attach to the unit using the 6
screws removed from the unit face, Figure 3.
STEP 7: Mount the framed glass (Fig 1, IOSK3-A02) onto the unit and
secure in place rst with only the two side screws.
STEP 8: Place the Galvanized strips (4 supplied) at each corner lining up
screw holes and secure both the strips and the framed glass to the unit.
STEP 9: Attach the stainless steel trim (Fig1, IOSK3-A03), by placing it
on and ensuring the magnets catch the previously placed galvanized strip.
Figure 4: Install silicone gasket
STEP 3: Install the silicon gasket material (supplied by Montigo) in one
continuous strip with the joint at the bottom, Figure 4.
Indoor / Outdoor Sealing Kit For R320 ST
Use this instruction in conjuction with unit
instruction manual (Doc. XG0772)
Installation Instruction
Kit Part No. IOSK3
IOSK 420 Instructions Cont'd
61.25
28.12
52.938
49.693
16.558 19.803
2.901
IOSK4-A03
IOSK4-A02
IOSK4-A01
420-551
ISOMETRIC VIEW
(NTS)
ITEM NO.
PART NUMBER
DESCRIPTION
QTY. REV.
1
IOSK4-A03
DOOR TRIM ASSEMBLY, IOSK4
1
A
2
420-551
BACK PLATE, IOSK4
1
A
3
IOSK4-A01
OUTER FRAME, IOSK4
1
A
4
IOSK4-A02
DOOR ASSEMBLY, IOSK4
1
A
NTS
SIZE
DWG. NO.
A
REV.
SHEET 1 OF 1
WEIGHT:
IOSK4
FINISH
MATERIAL
DIMENSIONS ARE IN INCHES
TOLERANCES:
FRACTIONAL
1/32"
TWO PLACE DECIMAL
.015"
THREE PLACE DECIMAL
.005"
ALL BENDS ARE ASSUMED
TO BE 90
UNLESS NOTED
OTHERWISE.
CHECKED BY
DRAWN BY
LF
DATE
NAME
A
6/9/2011
INDOOR OUTDOOR SEALING KIT FOR R420
THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF CANADIAN HEATING PRODUCTS. ANY REPRODUCTION IN PART OR AS A WHOLE WITHOUT THE WRITTEN PERMISSION OF CANADIAN HEATING PRODUCTS IS PROHIBITED.
PROPRIETARY AND CONFIDENTIAL
Z:\CADD\2007 CADD\Standard\Residential C-Vew\RVIEW IOK\R420IOK\IOSK4
Thursday, June 09, 2011 2:52:22 PM
SCALE
Assembly
Finishing
1
2
4
5
6
7
8
9
3
Back frame the unit with the metal header supplied
by Montigo above the unit and either combustible
or non-combustible framing to the sides and bottom
maintaining clearances as shown and ensuring the
galvanized apron can be attached to the framing.
CLEARANCE TO COMBUSTIBLES: 6" Top, 3" each side, 3" bottom
from the protruding window box.
Follow the instructions for the unit installation in the up to Step 1 on
the installation guide. The unit is in place with the screws removed
as illustrated there
Attach the stainless steel frame (Part No. IOSK*-A01)
to the galvanized frame lining up the holes around
perimeter. Secure in place through holes across the top
and down the sides. Do not secure the bottom flange.
Apply approved waterproofing membrane over the
flange of the frame on the top and sides and under
the flange of the frame at the bottom. The membrane
should overlap the frame approximately 2" around the
perimeter.
All facing materials may now be installed over the
frame. BE CERTAIN TO MAINTAIN 6" ABOVE AND 3" ON
SIDES AND BOTTOM TO ANY COMBUSTIBLE MATERIAL
Mount the framed glass (IOSK*-A02) onto the unit and
secure in place first with only the two side screws.
Place the Galvanized strips (4 supplied) at each corner
lining up screw holes and secure both the strips and the
framed glass to the unit.
Attach the stainless steel trim (Fig1, IOSK*-A03), by
placing it on and ensuring the magnets catch the
previously placed galvanized strip.
Install the silicon gasket material (supplied by Montigo)
in one continuous strip with the joint at the bottom
Place the galvanized apron and attach to the unit using
the 6 screws removed from the unit face.
When installing finishing materials around the fireplace, leave a 1/2”
gap between the stainless trim and any finishing materials so that
the trim can be removed for cleaning and servicing. BE CERTAIN
TO MAINTAIN 6" ABOVE AND 3" ON SIDES AND BOTTOM TO ANY
COMBUSTIBLE MATERIAL
IOSK*-AO1
IOSK*-AO2
IOSK*-AO3
APRON
IOSK3, IOSK4, IOSK5, IOSK6 DIMENSIONS
A B C D E F G
IOSK 3 49.25" 28.12" 16.56" 19.80" 37.69 " 40.94" 2.90"
IOSK4 61.25" 28.12" 16.56" 19.80" 49.69" 52.94" 2.90"
IOSK5 73.25" 30.12" 18.56" 21.80" 61.69" 64.94" 2.90"
IOSK6 85.25" 30.12" 18.79" 21.80" 73.92" 76.94" 2.90"
IOSK7 97.25" 30.12" 18.79" 21.80" 85.92" 88.94" 2.90"
A
B
C D
E
F
G
Some materials used in the manufacturing process of this product can
expose you to Benzene which is known in the State of California to
cause cancer and birth defects or other reproductive harm. For more
information go to www.P65warnings.ca.gov
WARNING
Follow the instructions for the unit installation in the up to Step 1 on
Page 7 of the installation guide.
The unit is in place with the screws removed as illustrated there.
STEP 1: Back frame the unit with the metal header supplied by Montigo
above the unit and either combustible or non-combustible framing to the
sides and bottom maintaining clearances as shown and ensuring the
gallvanized apron (Fig 1, Part No. 520-551) can be attached to the framing.
Figure 1: Indoor/ Outdoor Sealing Kit Ccmponents
Figure 2: Backframe unit
CLEARANCE TO COMBUSTIBLES:
6" Top, 3" each side, 3" bottom from the protruding window box.
Figure 3: Attach galvanized apron to unit
STEP 4: Attach the stainless steel frame (Fig. 1, Part No. IOSK5-A01)
to the galvanized frame lining up the holes around perimeter. Secure in
place through holes across the top and down the sides. Do not secure
the bottom ange.
STEP 5: Apply approved waterproong membrane over the ange of
the frame on the top and sides and under the ange of the frame at
the bottom. The membrane should overlap the frame approximately 2"
around the perimeter.
STEP 6: All facing materials may now be installed over the frame.
BE CERTAIN TO MAINTAIN 6" ABOVE AND 3" ON SIDES AND BOTTOM
TO ANY COMBUSTIBLE MATERIAL
STEP 2: Place the galvanized apron and attach to the unit using the 6
screws removed from the unit face, Figure 3.
STEP 7: Mount the framed glass (Fig 1, IOSK5-A02) onto the unit and
secure in place rst with only the two side screws.
STEP 8: Place the Galvanized strips (4 supplied) at each corner lining up
screw holes and secure both the strips and the framed glass to the unit.
STEP 9: Attach the stainless steel trim (Fig1, IOSK5-A03), by placing it
on and ensuring the magnets catch the previously placed galvanized strip.
Figure 4: Install silicone gasket
STEP 3: Install the silicon gasket material (supplied by Montigo) in one
continuous strip with the joint at the bottom, Figure 4.
Indoor / Outdoor Sealing Kit For R520 ST
Use this instruction in conjuction with unit
instruction manual (Doc. XG0773)
Installation Instruction
Kit Part No. IOSK5
IOSK5-A03
IOSK5-A02
IOSK5-A01
520-551
Window Sealing Kit
02/06/18
Frame the unit with non-combusble materials. Maintain the
clearances specied in your replace manual.
Step 1- Framing
Install the galvanized apron onto the face of the replace. Mount
the apron via the nutserts on the unit’s face, then tack the apron
to the surrounding framing via the elongated holes only.
Step 2- Galvanized Apron
Elongated holes to tack galvanized apron to framing
Aach apron to nutserts
Step 3- Stainless Apron
Line up the stainless apron’s mounng holes with the small round
holes in the galvanized apron and aach to the framing.
Aach apron to framing
Install a waterproong membrane (customer supplied) on the
stainless apron to prevent water from entering the replace.
Step 4- Waterproong Membrane
Window Sealing Kit
02/06/18
Frame the unit with non-combusble materials. Maintain the
clearances specied in your replace manual.
Step 1- Framing
Install the galvanized apron onto the face of the replace. Mount
the apron via the nutserts on the unit’s face, then tack the apron
to the surrounding framing via the elongated holes only.
Step 2- Galvanized Apron
Elongated holes to tack galvanized apron to framing
Aach apron to nutserts
Step 3- Stainless Apron
Line up the stainless apron’s mounng holes with the small round
holes in the galvanized apron and aach to the framing.
Aach apron to framing
Install a waterproong membrane (customer supplied) on the
stainless apron to prevent water from entering the replace.
Step 4- Waterproong Membrane
Window Sealing Kit
02/06/18
When installing nishing materials around the replace, leave a
1/2” gap between the stainless trim and any nishing materials so
that the trim can be removed for cleaning and servicing.
Step 7- Finishing Around Fireplace
Aach the framed glass to the nutserts on the face of the re-
place.
Step 5- Framed Glass
1/2”
1/2”
Stainless
Trim
Finished
Fireplace
Side View
Install the stainless trim over the framed glass. The trim aaches
magnecally to the replace; no other fasteners are required.
Step 6- Stainless Trim
Window Sealing Kit
02/06/18
Frame the unit with non-combusble materials. Maintain the
clearances specied in your replace manual.
Step 1- Framing
Install the galvanized apron onto the face of the replace. Mount
the apron via the nutserts on the unit’s face, then tack the apron
to the surrounding framing via the elongated holes only.
Step 2- Galvanized Apron
Elongated holes to tack galvanized apron to framing
Aach apron to nutserts
Step 3- Stainless Apron
Line up the stainless apron’s mounng holes with the small round
holes in the galvanized apron and aach to the framing.
Aach apron to framing
Install a waterproong membrane (customer supplied) on the
stainless apron to prevent water from entering the replace.
Step 4- Waterproong Membrane
Window Sealing Kit
02/06/18
When installing nishing materials around the replace, leave a
1/2” gap between the stainless trim and any nishing materials so
that the trim can be removed for cleaning and servicing.
Step 7- Finishing Around Fireplace
Aach the framed glass to the nutserts on the face of the re-
place.
Step 5- Framed Glass
1/2”
1/2”
Stainless
Trim
Finished
Fireplace
Side View
Install the stainless trim over the framed glass. The trim aaches
magnecally to the replace; no other fasteners are required.
Step 6- Stainless Trim
/