CombiSteel 7075.0120 Horizontal Outlet Floor Drain Installation guide

  • Hello! I have reviewed the user manual for the CombiSteel Floor Drain model 7075.0120. This document provides detailed instructions on how to properly install the floor drain, including adjusting its height, connecting it to PVC pipe, and securing it in concrete. I am ready to answer your questions regarding the device or it's installation process.
  • What parts are included with the floor drain?
    What should I do with the grate and filter element during installation?
    What is the recommended height adjustment for the floor drain?
    When can the rubber plug be taken off?
 
MODEL: 7075.0120 P: 1/4 )
PLEASE CHECK AND MAKE SURE THAT THE BELOW LISTED PARTS ARE SUPPLIED
NO PART NAME QUANTITV
 
 
 
 






200x200

 
 SECTION A-A
0
0
A


 
MODEL: 7075.0120 P: 2/4 )









 
MODEL: 7075.0120 P: 3/4 )



SLOPED !
   �

 

  



"

 
MODEL: 7075.0120 P: 4/4 )
*THE WHOLE GAP AROUND AND UNDER THE FLOOR DRAIN SHOULD BE FILLED WITH
CONCRETE GRADUALLY AND HAVE A SMOOTH TOP SURFACE.
*AS THE LAST STEP, TILING IS APPLIED
*THE WHOLE SURFACE OF THE FLOOR DRAIN MUST BE CLEANED PROPERLY BEFORE
PLACING THE FILTER ELEMENT AND THE GRATE.
*PLEASE MAKE SURE THAT THE RUBBER PLUG IS ALWAYS ON. THE RUBBER PLUG
MAY BE TAKEN OFF FOR MAINTENANCE ONLY.
/