Barco SLite 10 Installation guide

Type
Installation guide

This manual is also suitable for

SLite HD rental display
Installation manual
R5976939/07
05/11/2008
Barco nv Events
Noordlaan 5, B-8520 Kuurne
Phone: +32 56.36.89.70
Fax: +32 56.36.88.24
Visit us at the web: www.barco.com
Printed in Belgium
Changes
Barco provides this manual ’as is’ without warranty of any kind, either expressed or implied, including but not limited to the implied war-
ranties or merchantability and tness for a particular purpose. Barco may make improvements and/or changes to the product(s) and/or the
program(s) described in this publication at any time without notice.
This publication could contain technical inaccuracies or typographical errors. Changes are periodically made to the information in this
publication; these changes are incorporated in new editions of this publication.
Copyright ©
All rights reserved. No part of this document may be copied, reproduced or translated. It shall not other
wise be recorded, transmitted or
stored in a retrieval system without the prior written consent of Barco.
Federal Communications Commission (FCC Statement)
This equipment has been tested and found to comply with the limits for a class A digital device, pursuant to Part 15 of the FCC rules.
These limits are designed to provide reasonable protection against harmful interference when the equipment is operated in a commercial
environment. This equipment generates, uses, and can radiate radio frequency energy and, if not installed and used in accordance with
the instruction manual, may cause harmful interference to radio communications. Operation of this equipment in a residential area may
cause harmful interference, in which case the user will be responsible for correcting any interference at his own expense
Guarantee and Compensation
Barco provides a guarantee relating to perfect manufacturing as part of the legally stipulated terms of guarantee. On receipt, the purchaser
must immediately inspect all delivered goods for damage incurred during transport, as well as for material and manufacturing faults Barco
must be informed immediately in writing of any complaints.
The period of guarantee begins on the date of transfer of risks, in the case of special systems and software on the date of commissioning,
at latest 30 days after the transfer of risks. In the event of justied notice of complaint, Barco can repair the fault or provide a replacement
at its own discretion within an appropriate period. If this measure proves to be impossible or unsuccessful, the purchaser can demand a
reduction in the purchase price or cancellation of the contract. All other claims, in particular those relating to compensation for direct or
indirect damage, and also damage attributed to the operation of software as well as to other services provided by Barco, being a component
of the system or independent service, will be deemed invalid provided the damage is not proven to be attributed to the absence of properties
guaranteed in writing or due to the intent or gross negligence or part of Barco.
If the purchaser or a third party carries out modications
or repairs on goods delivered by Barco, or if the goods are handled incorrectly,
in particular if the systems are commissioned operated incorrectly or if, after the transfer of risks, the goods are subject to inuences not
agreed upon in the contract, all guarantee claims of the purchaser will be rendered invalid. Not included in the guarantee coverage are
system failures which are attributed to programs or s
pecial electronic circuitry provided by the purchaser, e.g. interfaces. Normal wear as
well as normal maintenance are not subject to the guarantee provided by Barco either.
The environmental conditions as well as the servicing and maintenance regulations specied in the this manual must be complied with by
the customer.
Trademarks
Brand and product names mentioned in this manual may be trademarks, registered trademarks or copyrights of their respective holders.
All brand and product names mentioned in this manual serve as comments or examples and are not to be understood as advertising for
the products or their manufactures.
Table of contents
TABLE OF CONTENTS
1. Safety................................................................................................................ 3
1.1 Safety guidelines .................................................................................................................... 4
1.2 Important safety instructions ........................................................................................................ 5
1.3 Important warnings .................................................................................................................. 6
1.4 Important warnings concerning ight cases ........................................................................................ 7
2. Installation requirements ........................................................................................ 9
2.1 Mechanical requirements for the SLite HD rental display ..........................................................................10
2.2 Electrical requirements for the SLite HD rental display . ...........................................................................11
2.3 System requirements for the Control software . . ...................................................................................12
3. System overview ..................................................................................................13
3.1 Introduction ..........................................................................................................................14
4. Components of an SLite HD rental tile ........................................................................15
4.1 SLite HD rental frame ...............................................................................................................16
4.2 SLite tile..............................................................................................................................17
5. SLite HD rental peripherals and accessories ................................................................19
5.1 SLite HD rental ight case...........................................................................................................20
5.2 SLite HD rental base stand setup accessories .....................................................................................21
5.3 SLite HD rental truss setup accessories............................................................................................22
5.4 Powerboxes.........................................................................................................................23
5.5 Digitizer ..............................................................................................................................24
5.6 Fiberlink system .....................................................................................................................25
5.7 Control software .....................................................................................................................26
6. Set up process of an SLite HD rental display ................................................................27
6.1 Set up of a oor mount SLite HD rental display . ...................................................................................28
6.2 Set up of a hanging SLite HD rental display ........................................................................................29
7. Basic set up procedures .........................................................................................31
7.1 Remove SLite HD rental tiles out of the ight case ................................................................................32
7.2 Place SLite HD rental tiles into the ight case......................................................................................33
7.3 Install the SLite HD rental feet ......................................................................................................34
7.4 Installing an adjustable foot.........................................................................................................36
7.5 Attach an SLite HD truss beam upon an SLite HD rental tile . . ....................................................................37
7.6 Attach an SLite HD rental tile upon an SLite HD rental foot .......................................................................38
7.7 Attach SLite HD rental tiles on top of each other...................................................................................39
7.8 Attach SLite HD rental tiles next to each other.....................................................................................40
7.9 Install an SLite HD stacker system .................................................................................................41
7.10 Secure a hanging SLite HD rental display..........................................................................................43
7.11 Build up a oor mounted SLite HD rental display ..................................................................................44
7.12 Build up a hanging SLite HD rental display with truss beams .....................................................................46
8. Cabling of an SLite HD rental display .........................................................................49
8.1 Powercabling of an SLite HD rental display........................................................................................50
8.2 Data cabling of an SLite HD rental display .........................................................................................52
9. Maintenance........................................................................................................53
9.1 Cleaning SLite HD rental tiles.......................................................................................................54
9.2 Software update .....................................................................................................................55
9.3 Color calibration .....................................................................................................................56
10. Servicing............................................................................................................57
10.1 Safety instructions...................................................................................................................58
10.2 Remove the re-sync/controller unit .................................................................................................59
10.3 Install the re-sync/controller unit ....................................................................................................60
10.4 Install an SLite tile into an SLite HD rental frame ..................................................................................61
10.5 Remove an SLite tile ................................................................................................................64
10.6 Install an SLite tile ...................................................................................................................66
10.7 Replacement of an SLite 10 XP shader . . . . ........................................................................................68
A. Dimensions..........................................................................................................69
A.1 Dimensions of an SLite HD rental tile...............................................................................................70
A.2 Dimensions of an SLite tile..........................................................................................................71
A.3 Dimensions of an SLite HD ight case..............................................................................................72
A.4 Dimensions of an SLite HD truss beam . . . . ........................................................................................73
A.5 Dimensions of an SLite HD foot.....................................................................................................74
A.6 Dimensions of an SLite HD stacker system ........................................................................................75
B. Specications .......................................................................................................77
B.1 SLite 10 specications...............................................................................................................78
B.2 SLite 10 XP specications...........................................................................................................79
R5976939 SLITE HD RENTAL DISPLAY 05/11/2008 1
Table of contents
B.3 SLite 14 specications...............................................................................................................80
B.4 SLite 22 specications...............................................................................................................81
B.5 Weight of individual parts of an SLite HD rental display ...........................................................................82
B.6 Ballast values for a base stand SLite HD rental display............................................................................83
B.7 Ground pressure of a base stand SLite HD display ................................................................................85
C. Order info ............................................................................................................87
C.1 Order info ............................................................................................................................88
Index......................................................................................................................89
2 R5976939 SLITE HD RENTAL DISPLAY 05/11/2008
1. Safety
1. SAFETY
About this chapter
Read this chapter attentively. It contains important information to prevent personal injury while installing the SLite HD rental display.
Furthermore, it includes several cautions to prevent damage to the SLite HD rental tile. Ensure that you understand and follow all
safety guidelines, safety instructions and warnings mentioned in this chapter before installing the SLite HD rental display. After this
chapter, additional “warnings” and “cautions” are given depending on the installation procedure. Read and follow these “warnings”
and “cautions” as well.
Overview
Safety guidelines
Important safety instructions
Important warnings
Important warnings concerning ight cases
R5976939 SLITE HD RENTAL DISPLAY 05/11/2008
3
1. Safety
1.1 Safety guidelines
Personal protection
WARNING: Ensure you understand and follow all the safety guidelines, safety instructions, warnings and
cautions mentioned in this manual.
WARNING: Be aware of suspended loads.
WARNING: Wear a hard hat to reduce the risk of personal injury.
WARNING: Be careful while working with heavy loads.
WARNING: Mind your ngers while working with heavy loads.
Installation personnel
This installation must be performed by authorized and qualied technical personnel only.
Accredited safety ofcers must ensure the safety of the site, construction, assembly, connection, use, dismantling, transport etc. of
such safety critical systems.
Caution
Installation should be performed only after you are thoroughly familiar with all of the proper safety checks and installation instructions.
To do otherwise increases the risk of hazards and injury to the user.
Assembly parts are designed for intended use only in conjunction with T-20 LED displays.
Do not modify and/or replicate any component. Barco uses specic materials and manufacturing processes in order to achieve part
strength. Consult Barco for assistance with custom applications.
Always follow Barco installation instructions. Cont
act Barco if you should have any question regarding the safety of an application.
The manufacturer assumes no liability for incorrect, inadequate, irresponsible or unsafe assembly of systems.
Product care
Structural & mounting components should be kept dry, clean, lubricated (only if recommended), coated properly, and otherwise
maintained in a manner consistent with part design. Barco products must be used in a manner consistent with their design and
inspected on a routine basis for security, wear, deformation, corrosion and any other circumstances that may affect the load handling
capability of the part.
Barco recommends inspections at regular intervals for all installations and increasing in frequency for more critical installations. If
a part is found to have damage, which may cause a decrease in load capability, the part must be removed for service or replaced
immediately.
Under no circumstances are Barco parts repairable by anyone other than Barco.
4
R5976939 SLITE HD RENTAL DISPLAY 05/11/2008
1. Safety
1.2 Important safety instructions
Instructions:
Read these instructions.
Keep these instructions.
Heed all warnings.
Follow all instructions.
Clean only with materials or chemicals that are inert, nonabrasive, noncorrosive and non-marking. Consult the manufacturer
for further advice should any doubts exist regarding any cleaning procedure.
Do not block ventilation openings. Install in accordance with the manufacturers instructions.
Do not install near any heat sources such as radiators, heat registers, stoves, or other apparatus (including ampliers) that
produce heat.
Do not defeat the safety purpose of the polarized or grounding type plugs/sockets. If the provided sockets/plugs are damaged
then replacement of the defective parts must be undertaken immediately.
Protect the power/data cords from being walked on or pinched particularly at plugs, convenience receptacles, and the point
where they exit from the apparatus. Replace damaged power/data cords immediately.
Only use attachments/accessories specied by the manufacturer.
Disconnect the power to this apparatus during lightning storms or provide suitable additional lightning protection. Unplug this
apparatus when unused for long period of time.
Refer all servicing to qualied service technicians/personnel. Servicing is required when the apparatus has been damaged in
any way, such as power-supply cord or plug is damaged, the apparatus does not operate normally, or has been dropped.
Use only with systems or peripherals specied by the manufacturer, or sold with the apparatus. Use caution during lifting/moving
or transporting to avoid damage by possible tipping.
R5976939 SLITE HD RENTAL DISPLAY 05/11/2008
5
1. Safety
1.3 Important warnings
Important warnings:
Risk of electric shock:
Do not open. To reduce the risk of electric shock, do not remove cover (or back). No user-serviceable parts inside. Refer servicing
to qualied service personnel.
Maximum and minimum ambient temperature:
The maximum ambient temperature for the LED wall is 40°C, the minimum temperature is -20°C.
High leakage current:
The combination of multiple tiles in an installation results in increased levels of leakage current. In order to avoid risk of electric
shock due to high leakage current, proper grounding of the installation is required.
Flammable materials:
Keep ammable materials away from the installation (such as curtains). A lot of energy is transferred into heat. The installation
should be such that the amount of air ow required for safe operation of the equipment is not compromised. Proper ventilation must
be provided.
Risk of electric shock / Risk of re:
To protect against risk of re caused by overloading of power cables, MAXIMUM 3 tiles may be connected in parallel. Each power
source cable supplying maximum 3 tiles should be protected by a circuit breaker or fuses rated 16 A / 250 VAC (15 A / 250 VAC in
the USA and Canada). Note that one T-20 tile requires 200-240 VAC, 50-60 Hz, 1.56 amps at 230 VAC.
Mechanical stress:
Use the SLite HD rental tiles in a hanging conguration only. Maximum allowed SLite HD display height is 16 SLite tiles or 15 SLite
XP tiles tiles high. Never truss more than 16 SLite tiles or 15 SLite XP tiles tiles high.
Disconnect device:
When the appliance inlets of the individual tiles are not accessible, the socket outlets supplying the rack shall be installed near the
equipment and be easily accessible, or a readily accessible general disconnect device shall be incorporated in the xed wiring.
This equipment MUST be earthed:
In order to protect against risk of electric shock, the installation should be properly grounded. Defeating the purpose of the grounding
type plug will expose you to the risk of electric shock.
Power system:
It is recommended to use a TN-S power distribution system (a power distribution system with a separate neutral and grounding
conductor) in order to avoid large ground current loops due to voltage differences in the neutral conductor. The total electrical
installation should be protected by an appropriately rated disconnect switch, circuit breakers, over voltage protector and Ground Fault
Current Interrupters. The installation shall be done according to the local electrical installation codes. In Europe special attention
should be given to EN 60364, the standard for electrical installation of buildings. In Germany VDE 0100 should be adhered to. In
America, special attention should be given to the National Electrical Code, ANSI/NFPA 70.
Mains cords:
The power cords delivered with this system have special properties for safety. They are not user serviceable. If the power cords are
damaged, replace them only with new ones. Never try to repair a power cord.
Data cables:
The data cables provided with this system have special properties for safety. They are not user serviceable. If the data cables are
damaged, replace them only with new ones. Never try to repair a data cable. Per requirements of the National Electrical Code®
in the USA , the length of a data cable must not exceed 42 m (140 feet). Avoid exposure of data cables to accidental contact with
lightning or power conductors.
6
R5976939 SLITE HD RENTAL DISPLAY 05/11/2008
1. Safety
1.4 Important warnings concerning ight cases
Important warnings concerning stacking/transporting SLite HD rental ight cases
Stack maximum two (2) SLite HD rental ight cases high. Never higher.
Surface on which ight case is standing must be level to ensure that the total load is evenly spread out among the four wheels.
The surface must also be able to support the load safely.
Before stacking or transporting ight cases, check the wheels and their xation screws for wear or defects.
Before stacking or transporting ight cases, check that the SLite HD rentals are securely locked into the base of the ight case.
Before stacking or transporting ight cases, check that the four lock handles on each ight case are in good working order and
locked securely.
When stacked, make sure the wheels of the upper ight case are precisely positioned in the stacking dishes of the ight case
below.
•Stackedight cases may not be moved. Before stacking, the lower ight case must already be in its nal resting position before
placing the second one upon it.
Never stack loaded ight cases in a truck or other transport medium, unless each ight case is rigidly strapped.
In the event of a wheel breaking, ight cases must be rigidly strapped to prevent a stack collapsing.
Use an appropriate forklift to raise ight cases and take the necessary precautions to avoid personal injury.
R5976939 SLITE HD RENTAL DISPLAY 05/11/2008
7
1. Safety
8 R5976939 SLITE HD RENTAL DISPLAY 05/11/2008
2. Installation requirements
2. INSTALLATION REQUIREMENTS
About this chapter
This chapter enumerates the mechanical requirements for the SLite HD display, the electrical requirements to power up the SLite HD
display and the system requirements to run the control software efcient.
Overview
Mechanical requirements for the SLite HD rental display
Electrical requirements for the SLite HD rental display
System requirements for the Control software
R5976939 SLITE HD RENTAL DISPLAY 05/11/2008
9
2. Installation requirements
2.1 Mechanical requirements for the SLite HD rental display
Weight
Do not underestimate the weight of a complete SLite HD rental display. Be sure that the oor or truss installation on which the
SLite HD rental display has to be installed is capable of handling ve (5) times the complete load of the display. Note that one
SLite HD rental tile weighs approximately 60 kg (or 100 kg per square meter display). Do not forget to take into account the weight
of the ballast required in case of a base stand SLite HD rental display.
Levelled surface
The surface on which an SLite HD rental display has to be installed must be levelled. Never install an SLite HD rental display on an
inclined surface.
WARNING: Ensure that, when installing a base stand SLite HD rental display upon a platform, the top of the
LED-wall does not reach more then 20 meters above ground level.
Ballast
Depending on the expected wind load, the height of the display and the position of the LED-wall upon the foot beams (somewhere
between front and middle) additional weight (ballast) will be required. Consult chapter “Ballast values” or use the “Ballast calculator”
tool available on Barco’s secured web site to calculate the minimum ballast you require for safe installation of your SLite HD rental
display.
10
R5976939 SLITE HD RENTAL DISPLAY 05/11/2008
2. Installation requirements
2.2 Electrical requirements for the SLite HD rental display
Power requirements
One SLite tile requires 200-240 VAC, 50–60 Hz, 4.22 amps @ 230 VAC. Note that one SLite tile correspond with a display surface
of 0.6 m². Each SLite tile has a power loop through connector. However, MAXIMUM 3 tiles may be connected in parallel. So, one
power source cable has to be provided per 3 tiles. Every power source cable should be protected by a circuit breaker or fuses rated
16 A / 250 VAC (15 A / 250 VAC in the USA and Canada).
Barco provides a range of power boxes, which meet the requirements of your SLite HD display. Contact
Barco
for more information about power boxes and power requirements for your SLite HD display.
Power system:
It is recommended to use a TN-S power distribution system (a power distribution system with a separate neutral and grounding
conductor) in order to avoid large ground current loops due to voltage differences in the neutral conductor. The total electrical
installation should be protected by an appropriately rated disconnect switch, circuit breakers, over voltage protector and Ground Fault
Current Interrupters. The installation shall be done according to the local electrical installation codes. In Europe special attention
should be given to EN 60364, the standard for electrical installation of buildings. In Germany VDE 0100 should be adhered to. In
America, special attention should be given to the National Electrical Code, ANSI/NFPA 70.
Disconnect device:
When the appliance inlets of the individual tiles are not accessible, the socket outlets supplying the rack shall be installed near the
equipment and be easily accessible, or a readily accessible general disconnect device shall be incorporated in the xed wiring.
This equipment MUST be earthed:
In order to protect against risk of electric shock, the installation should be properly grounded. Defeating the purpose of the grounding
type plug will expose you to the risk of electric shock.
R5976939 SLITE HD RENTAL DISPLAY 05/11/2008
11
2. Installation requirements
2.3 System requirements for the Control software
Before you begin
It is assumed you are familiar with the Windows operating system at your site.
The CD-ROM in your package contains a Windows-based installation program. You can install the software from the CD-ROM.
System requirements
Minimum specications :
Hardware
- PC Pentium III or equivalent, 2 GHz
- 512 Mb RAM
- Free hard disk space: 300 Mb
- XGA resolution (1024 x 768)
- Serial communication port
- Ethernet connection
Software
- Windows 2000
1
, Windows XP Home or Windows XP Professional
Recommended specications :
Hardware
- PC Pentium IV or equivalent, 2.4 GHz
-1GbRAM
- 300 Mb hard disk free space
- SXGA resolution (1280 x 1024) with 32 Mb video memory
- Serial communication port
- Ethernet connection
Software
- Windows XP Professional or Windows Vista
1. It runs on Windows 2000 but when problems are discovered, Barco does not deliver any support
12 R5976939 SLITE HD RENTAL DISPLAY 05/11/2008
3. System overview
3. SYSTEM OVERVIEW
About this chapter
This chapter enumerates the fundamental elements of an SLite HD rental display.
Overview
Introduction
R5976939 SLITE HD RENTAL DISPLAY 05/11/2008
13
3. System overview
3.1 Introduction
The fundamental elements of an SLite HD rental display system are:
SLite tiles.
SLite HD rental structures.
SLite HD rental foot, foot beams and stacker or SLite HD rental truss beams
Rental power box.
Digitizer.
Control software.
Block diagram SLite HD display system:
Sources Digitizer
Control
PC
Power
box
RS232
Tile 1
LED-wall
Tile 2
Tile 3
Image 3-1
14 R5976939 SLITE HD RENTAL DISPLAY 05/11/2008
4. Components of an SLite HD rental tile
4. COMPONENTS OF AN SLITE HD RENTAL TILE
General introduction
The SLite HD rental tile has a rugged frame where one SLite tile ts in to form one display tile. The back of the SLite tile contains a
re-sync unit with a MDR input and a MDR output port to connect the SLite HD rental tile with the neighboring tiles in the display.
B
A
B
A
Image 4-1
A SLite HD rental frame.
BSLitetile.
The following chapters describe and illustrate the main components of an SLite HD rental tile more in detail.
R5976939 SLITE HD RENTAL DISPLAY 05/11/2008
15
4. Components of an SLite HD rental tile
4.1 SLite HD rental frame
Introduction SLite HD rental frame
The SLite HD rental frame is made of aluminium proles and stainless steel to reduce weight without losing strength. This strong
frame allows you to build SLite HD LED-walls up to 12 tiles high stacked or 16 SLite tiles or 15 SLite XP tiles high trussed. The
SLite HD rental frame contains four mounting holes, one in every corner, to attach an SLite tile.
The top of the SLite HD rental frame is equipped with two big cones for easy and fast positioning of the upper rental frame. The bot-
tom corners of the SLite HD rental frame contain a solid locking mechanism operated with a xed rugged handle, no tools required.
These locking mechanisms and the big cones ensure a fast and secure attachment between the upper and lower tile. The rear right
side of the SLite HD rental frame is equipped with a smaller rugged handle which operates the side locking mechanism to secure
the rental tiles sideways with the neighboring tile.
All sides of the SLite HD rental frame are provided with small positioning cones and planes to ensure a precise positioning between
the tiles. It’s important to keep those cones and planes clean, otherwise seams will be visible after installation of the rental frame
into the LED-wall.
The left and right rear sides of the SLite HD rental frame contain two holes which are used to install the stacker system in case of
a base stand SLite HD display conguration. Furthermore the left and right side of the frame are equipped with a fold out carrying
handle.
Parts location of the SLite HD rental frame
D
AB
C
F
E
C
C
A
C
B
G
G
I
H
Image 4-2
A Small positioning cone.
B Big positioning cone.
C Positioning plane.
D Receiver for small positioning cone.
E Carrying handle.
F Receiver for side locking mechanism.
G Rugged handle for operating top-bottom locking mechanism.
H Mounting hole for SLite tile.
I Small handle for operating side locking mechanism.
16
R5976939 SLITE HD RENTAL DISPLAY 05/11/2008
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16
  • Page 17 17
  • Page 18 18
  • Page 19 19
  • Page 20 20
  • Page 21 21
  • Page 22 22
  • Page 23 23
  • Page 24 24
  • Page 25 25
  • Page 26 26
  • Page 27 27
  • Page 28 28
  • Page 29 29
  • Page 30 30
  • Page 31 31
  • Page 32 32
  • Page 33 33
  • Page 34 34
  • Page 35 35
  • Page 36 36
  • Page 37 37
  • Page 38 38
  • Page 39 39
  • Page 40 40
  • Page 41 41
  • Page 42 42
  • Page 43 43
  • Page 44 44
  • Page 45 45
  • Page 46 46
  • Page 47 47
  • Page 48 48
  • Page 49 49
  • Page 50 50
  • Page 51 51
  • Page 52 52
  • Page 53 53
  • Page 54 54
  • Page 55 55
  • Page 56 56
  • Page 57 57
  • Page 58 58
  • Page 59 59
  • Page 60 60
  • Page 61 61
  • Page 62 62
  • Page 63 63
  • Page 64 64
  • Page 65 65
  • Page 66 66
  • Page 67 67
  • Page 68 68
  • Page 69 69
  • Page 70 70
  • Page 71 71
  • Page 72 72
  • Page 73 73
  • Page 74 74
  • Page 75 75
  • Page 76 76
  • Page 77 77
  • Page 78 78
  • Page 79 79
  • Page 80 80
  • Page 81 81
  • Page 82 82
  • Page 83 83
  • Page 84 84
  • Page 85 85
  • Page 86 86
  • Page 87 87
  • Page 88 88
  • Page 89 89
  • Page 90 90
  • Page 91 91
  • Page 92 92
  • Page 93 93

Barco SLite 10 Installation guide

Type
Installation guide
This manual is also suitable for

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI