Midmark 641 Power Procedures Chair, 630 Barrier-Free® Universal Procedures Table (-001 thru -009) Installation guide

  • Hello! I am an AI chatbot trained to assist you with the Midmark 641 Power Procedures Chair Installation guide. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
1
© Midmark Corporation 2007
J9
J12
J9
J12
J9
J12
MA768600i
Wireless Hand / Foot Controls
[9A408]
003-1745-00 Rev. (C)
Step 1: Remove bottom screws
from inner shrouds.
Step 2: Stretch bungee cord across top
of base column
(under seat)
.
Note: It may be necessary to run Tilt UP function
to route bungee cord under seat section.
Step 3: Lift shrouds, then attach bungee cord
hooks under shrouds on both sides.
Step 4: Remove two screw(s) and
partially separate cover.
Note: You must perform Step 5 before
cover can be completely removed.
Step 6: Remove wire harness cover.
(Standard Base)
(Rotational Base)
Step 5: Disconnect wire harnesses from
J9 & J12 on main PC Board.
CAUTION
Always disconnect power to chair before removing
covers or performing any service procedure.
Components:
Antenna .............. 1
PC Board ............ 1
Nut ...................... 1
Wire Harness ...... 1
Special Tools:
bungee cord
Foot Control ........ 1
Hand Control ...... 1
Batteries (AA) ...... 4
Compatible with models:
641 (all)
630 (serial numbers V430154 thru present)
Style A
2
© Midmark Corporation 2007
MA773800i
Compliance
Label
J18
Step 9: Connect harness to base station PC board.
Connect other end of harness to J18 on main PC board.
Step 10: Apply compliance label to
chair shrouds as shown.
To complete installation:
• Install batteries in hand / foot controls
• Check for proper operation
• Install wire harness cover
• Install PC board cover
• Lower / secure shrouds
Midmark Corporation
60 Vista Drive
Versailles, OH 45380-0286
Phone: 937-526-3662
Fax: 937-526-5542
www.midmark.com
Note:
When power is connected, three LED’s
on the base station PC board will illuminate.
Step 8: Install base station PC board onto standoffs as shown.
Connect antenna to base station PC board.
Step 7: Secure antenna to wire harness
cover with nut.
Note: Position flat side of antenna as shown.
Flat Side
Equipment Alert
Antenna connection is very delicate.
Do not kink wire or apply stress to connection.
/