Classic Exhibits VK-4040 Setup Instructions

  • Hello! I am an AI chatbot trained to assist you with the Classic Exhibits VK-4040 Setup Instructions. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
© 2021
Order #XXXXX
Locked layer contains
placeholder marks.
Plan View
10’
20’
VK-4040 Single-Sided Lightbox
REV 9/2021
If you would like to tell us about your experience with your setup instructions please email us at [email protected]
SETUP INSTRUCTIONS
© 2021
Order #XXXXX
Locked layer contains
placeholder marks.
= 1 sq foot
Grid View
© 2021
Order #XXXXX
DO NOT USE POWER TOOLS
ALL CONNECTIONS MUST
BE TIGHTLY SECURED
Part Identification - Numbering
Spline Connection Base Plate & Extrusion Connection
General Setup Instructions
- Read entire setup instruction manual prior to
unpacking parts and pieces.
- The setup instructions are created specifically
for this configuration.
- Setup instructions are laid out sequentially in
steps, including exploded views with detailed
explanation for assembly.
WARNING
Cleaning & Packing
- For Cleaning Metal, Plex, & Laminate Parts:
Use a MILD NON-ABRASIVE cleanser and
soft cloth/paper towel to clean all surfaces.
- Keep exhibit components away from heat
and prolonged sun exposure.
Heat and UV exposure will warp and
fade components.
- Retain all provided Packing Materials.
All provided packing materials are for
ease of repacking & component protection.
Disassembly
- For loss prevention, tighten all set screws
and locks during disassembly.
7A
Hex Tool - Essential for Assembly
Extrusion & Lock Connection Engaged Lock
LADDERS OR LIFTS
MAY BE REQUIRED
General Information
© 2021
Order #XXXXX
Straight Connection
All knobs must be tightened securely to ensure a proper connection.
All knobs must be tightened securely to ensure a proper connection.
Adjust connectors if necessary to
prevent gaps in connection.
Upper Horizontal Extrusion
Lower Horizontal Extrusion
Straight Connector
Straight Connector
Corner
Connectors Corner
Connectors
Corner
Connectors Corner
Connectors
COMPLETED ASSEMBLY
3) Tighten all knobs to secure connection.
Slide verticals over
lower connectors.
Then slide upper
connectors into
groove of verticals.
Tighten all knobs.
When assembling frame, first attach all straight
connectors, then attach corner connectors.
1) Place extrusions end-to-end.
2) Loosen all knobs, then slide straight
connectors across the seam of extrusions.
Disassembly
1) Loosen all knobs.
2) Slide connectors off of one extrusion.
3) Tighten knobs to prevent loss during
packing & shipping.
CEI110 Profile
Slide both connectors across seam of extrusions.
Tighten all knobs.
Corner Connection
3) Tighten all knobs to secure connection.
Disassembly
1) Loosen knobs on vertical extrusions.
2) Slide the vertical extrusions off of
corner connectors on lower and upper
horizontal extrusions.
1) Loosen knobs, then slide vertical extrusions onto
corner connectors of lower horizontal extrusion.
2) Slide corner connectors of upper horizontal
extrusion into grooves of vertical extrusions.
Keep straight connectors in groove of
extrusion. Do not remove connectors
during disassembly.
CEI110 Frame Assembly
© 2021
Order #XXXXX
Graphic Removal
To remove the graphic
the frame, locate the fabric
pull tab. Gently pull up on the
tab to remove the fabric.
Step 1
Insert corner A. Turn edge of
graphic so silicon welt is
perpendicular to face of
graphic. Insert narrow side
of welt with fabric to outside
into the channel. Repeat for
other side of this corner.
Step 2
Repeat Step 1 for opposite
corner C, then insert corner
B, followed by corner D, to
complete the installation of
the corners.
Step 3
Once all corners are inserted,
press one silicon edge into
channel from corners and
work toward the center.
Make sure welt is fully inserted
into channel. Continue until
all sides are done. Smooth
out edges of graphic.
It is important to first insert
graphic into each alternate
corner then to the sides of
the frame. If this is not done,
graphic will not fit into the
frame correctly.
Corner A
Corner D
Corner B
Corner C
from
SEG Installation
© 2021
Case 1 of 3
Order #XXXXX
Locked layer contains
placeholder marks.
Top View of Each Level
Graphics
Level 1
(Bottom level)
Level 2
Monitor
Mount
1 2 3 4 5 7 9 12
Case Packing
© 2021
Case 2 of 3
Order #XXXXX
Locked layer contains
placeholder marks.
Top View of Each Level
Graphics
Level 1
(Bottom level)
Level 2
6
20 21
811 13
Case Packing
© 2021
Case 3 of 3
Order #XXXXX
Locked layer contains
placeholder marks.
Top View of Each LevelTop View of Each Level
Setup Hardware
Setup Hardware
Level 1
(Bottom level)
1410 15,16
17,17
18,18
19
Level 1
(Bottom level)
Case Packing
© 2021
Step 1 of 3
Order #XXXXX
Locked layer contains
placeholder marks.
20
21
19
5
67
89
10
2
1
4
3
18
17
16
15
11 12
13
14
*
*
When assembled
Steps:
Note: Refer to the CEI110 Frame Assembly
general information page.
1) Assemble horizontals [5-6-7-8-9], [10-11-12-13-14] &
verticals [1-2], [3-4] using straight connectors.
2) Connect vertical assemblies [1/2], [3/4] between
horizontal assemblies [5/6/7/8/9], [10/11/12/13/14]
using corner connectors.
3) Attach verticals [15-16], [17-18] between horizontal
assemblies as shown.
3) Connect Base Plate [19] to horizontal [7] using bolts.
4) Install Corner Base Plates [20,21].
See Corner Base Plate Attachment detail.
Item
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
Qty.
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2
2
1
1
1
Description
47.5”h CEI110 Vertical Extrusion
47.5”h CEI110 Vertical Extrusion
47.5”h CEI110 Vertical Extrusion
47.5”h CEI110 Vertical Extrusion
46”w CEI110 Horizontal Extrusion
46”w CEI110 Horizontal Extrusion
46”w CEI110 Horizontal Extrusion
46”w CEI110 Horizontal Extrusion
46”w CEI110 Horizontal Extrusion
46”w CEI110 Horizontal Extrusion
46”w CEI110 Horizontal Extrusion
46”w CEI110 Horizontal Extrusion
46”w CEI110 Horizontal Extrusion
46”w CEI110 Horizontal Extrusion
45.677”h Z45 Vertical Extrusion
45.677”h Z45 Vertical Extrusion
45.677”h Z45 Vertical Extrusion
45.677”h Z45 Vertical Extrusion
23” x 10” Rectangular Base Plate
23” x 10” Corner Base Plate
23” x 10” Corner Base Plate
bolt
wing
nut
bolt
bolt
key hole
Corner Base Plate Attachment
*Place key hole over bolt
on vertical extrusion and
slide down; secure with
bolts & wing nuts.
18
17
Assemble frame flat on ground.
Backwall Assembly
© 2021
Step 2 of 3
Order #XXXXX
Locked layer contains
placeholder marks.
Transformers Transformers Transformers
Steps:
1) Connect power cords to Supernova lights, as shown.
+
-
Power
Female
Transformer
96W / 4 Amp / 24V
++
--
Lights Male
Light to Light Attachment
Maximum of 7 lights per chain / 7 lights per Transformer
Light to Transformer Attachment
Power
Break
Power
Break
Power
Break
Power
Break
Lightbox Wiring
© 2021
Step 3 of 3
Order #XXXXX
Locked layer contains
placeholder marks.
Monitor
Mount
Steps:
Refer to the SEG Installation general information page.
1) Apply SEG Graphic to front of lightbox assembly.
2) Attach Monitor Mount to verticals [17/18]. See Monitor Mount Attachment detail.
3) Apply SEG Blocker to back of lightbox assembly.
Attach Stand-off barrels to Z45 extrusions
using bolts.
Connect Monitor Mount to Standoff Barrels
Z45
Stand-Off
Barrels
Monitor Mount Attachment
*
S
E
G
G
r
a
p
h
i
c
Note: Monitor mounts install through SEG graphic.
Monitor
Mount
Bolts
using Bolts.
Stand-Off
Barrels
18
18
17
17
*
Completed Assembly
SEG
Grap
h
ic
SEG Blocker
Attachments
/