Classic Exhibits VK-2984 Setup Instructions

  • Hello! I am an AI chatbot trained to assist you with the Classic Exhibits VK-2984 Setup Instructions. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
© 2023
Order #XXXXX
Locked layer contains
placeholder marks.
Top View
Perspective View
20’
10’
VK-2984 Inline Exhibit
If you would like to tell us about your experience with your setup instructions please email us at [email protected]
SETUP INSTRUCTIONS
© 2023
Order #XXXXX
DO NOT USE POWER TOOLS
ALL CONNECTIONS MUST
BE TIGHTLY SECURED
Part Identification - Numbering
Spline Connection Base Plate & Extrusion Connection
General Setup Instructions
- Read entire setup instruction manual prior to
unpacking parts and pieces.
- The setup instructions are created specifically
for this configuration.
- Setup instructions are laid out sequentially in
steps, including exploded views with detailed
explanation for assembly.
WARNING
Cleaning & Packing
- For Cleaning Metal, Plex, & Laminate Parts:
Use a MILD NON-ABRASIVE cleanser and
soft cloth/paper towel to clean all surfaces.
- Keep exhibit components away from heat
and prolonged sun exposure.
Heat and UV exposure will warp and
fade components.
- Retain all provided Packing Materials.
All provided packing materials are for
ease of repacking & component protection.
Disassembly
- For loss prevention, tighten all set screws
and locks during disassembly.
7A
Hex Tool - Essential for Assembly
Extrusion & Lock Connection Engaged Lock
LADDERS OR LIFTS
MAY BE REQUIRED
General Information
© 2023
Order #XXXXX
Graphic Removal
To remove the graphic
the frame, locate the fabric
pull tab. Gently pull up on the
tab to remove the fabric.
Step 1
Insert corner A. Turn edge of
graphic so silicon welt is
perpendicular to face of
graphic. Insert narrow side
of welt with fabric to outside
into the channel. Repeat for
other side of this corner.
Step 2
Repeat Step 1 for opposite
corner C, then insert corner
B, followed by corner D, to
complete the installation of
the corners.
Step 3
Once all corners are inserted,
press one silicon edge into
channel from corners and
work toward the center.
Make sure welt is fully inserted
into channel. Continue until
all sides are done. Smooth
out edges of graphic.
It is important to first insert
graphic into each alternate
corner then to the sides of
the frame. If this is not done,
graphic will not fit into the
frame correctly.
Corner A
Corner D
Corner B
Corner C
from
SEG Installation
© 2023
Order #XXXXX
Straight Connection
All knobs must be tightened securely to ensure a proper connection.
All knobs must be tightened securely to ensure a proper connection.
Adjust connectors if necessary to
prevent gaps in connection.
Upper Horizontal Extrusion
Lower Horizontal Extrusion
Straight Connector
Straight Connector
Corner
Connectors Corner
Connectors
Corner
Connectors Corner
Connectors
COMPLETED ASSEMBLY
3) Tighten all knobs to secure connection.
Slide verticals over
lower connectors.
Then slide upper
connectors into
groove of verticals.
Tighten all knobs.
When assembling frame, first attach all straight
connectors, then attach corner connectors.
1) Place extrusions end-to-end.
2) Loosen all knobs, then slide straight
connectors across the seam of extrusions.
Disassembly
1) Loosen all knobs.
2) Slide connectors off of one extrusion.
3) Tighten knobs to prevent loss during
packing & shipping.
CEI110 Profile
Slide both connectors across seam of extrusions.
Tighten all knobs.
Corner Connection
3) Tighten all knobs to secure connection.
Disassembly
1) Loosen knobs on vertical extrusions.
2) Slide the vertical extrusions off of
corner connectors on lower and upper
horizontal extrusions.
1) Loosen knobs, then slide vertical extrusions onto
corner connectors of lower horizontal extrusion.
2) Slide corner connectors of upper horizontal
extrusion into grooves of vertical extrusions.
Keep straight connectors in groove of
extrusion. Do not remove connectors
during disassembly.
CEI110 Frame Assembly
© 2023
Order #XXXXX
Locked layer contains
placeholder marks.
1 sq ft
Light Box
10 amps
Light Box
10 amps
Electrical Layout
© 2023
Crate 1 of 1
Order #XXXXX Crate Packing
© 2023
Step 1 of 4
Order #XXXXX
2
2A
3
1
1A
Item
1,1A
2,2A
3
Qty.
1,1
1,1
1
Description
86” CEI110 Horizontal Extrusion
92” CEI110 Vertical Extrusion
88.353” Z45 Vertical Extrusion
Steps:
1) Assemble CEI110 extrusions, flat on floor, as shown.
See CEI110 Frame Assembly sheet, for instruction.
2) Attach extrusion [3] to center of assembled CEI110 frame.
See Z45 Attachment detail.
3) Connect lighting cords and attach transformers, then connect
to power. See Light Connection details.
Completed Assembly
*
++
+
-
-
-
Lights
Male
Male
Female
Female
to power Transformer
144W / 6A / 24V
Light to Light Connection
Light to Transformer Connection
Maximum of 11 light bars per transformer.
Power
Break
Power
Break Power
Break
CEI110
Z45
Z45 Attachment
Attach Z45 vertical to back
groove of CEI110 horizontal.
*
F
r
o
n
t
of
F
r
a
m
e
*
Lightbox Assembly
© 2023
Step 2 of 4
Order #XXXXX
6
6A
7
4A
4
5A
5
Completed Assembly
*
*
Item
4,4A
5,5A
6,6A
7
Qty.
1,1
1,1
1,1
1
Description
68” CEI110 Horizontal Extrusion
68” CEI110 Horizontal Extrusion
92” CEI110 Vertical Extrusion
88.353” Z45 Vertical Extrusion
Steps:
1) Assemble CEI110 extrusions, flat on floor, as shown.
See CEI110 Frame Assembly sheet, for instruction.
2) Attach extrusion [7] to center of assembled CEI110 frame.
See Z45 Attachment detail.
3) Connect lighting cords and attach transformers, then connect
to power. See Light Connection details.
++
+
-
-
-
Lights
Male
Male
Female
Female
to power Transformer
144W / 6A / 24V
Light to Light Connection
Light to Transformer Connection
Maximum of 11 light bars per transformer.
CEI110
Z45
Z45 Attachment
Attach Z45 vertical to back
groove of CEI110 horizontal.
*
F
r
o
n
t
of
F
r
a
m
e
Power
Break
Power
Break Power
Break
Lightbox Assembly
© 2023
Step 3 of 4
Order #XXXXX
9
Large Lightbox
Small Lightbox
8A
8
Shelf
Unit
Item
8,8A
9
A
B
Qty.
1,1
1
1
1
Description
79.094” Z45 Horizontal Extrusion
88.4174” Z33 Vertical Extrusion
Panel
Panel w/ Door
Steps:
1) Attach extrusions [8] and [8A] between panels [A] and [B],
making sure Velcro is facing to front.
2) Attach extrusion [9] to between extrusions [8] and [8A].
See Z33 Attachment detail.
3) Connect blocker fabric to Velcro on back of small lightbox.
4) Attach small lightbox to panels [A] and [B], using bolts.
5) Attach large lightbox to panel {B], using bolts.
6) Attach shelf unit to large lightbox, as shown, using bolts. Completed Assembly
Front View
*
*
CEI110
Z33
Z33 Attachment
Attach Z33 vertical to back
groove of CEI110 horizontal.
*
F
r
o
n
t
of
F
r
a
m
e
B
A
Connect blocker fabric
to lightbox before
attaching to panels.
Closet to Lightboxes Assembly
© 2023
Step 4 of 4
Order #XXXXX
D
E
C
Item
C
D
E
Qty.
1
1
1
Description
Ceiling Panel
Ceiling Panel
Ceiling Panel
Steps:
1) Attach Ceiling panels [C] [D] and [E] to top of assembly,
using blots.
2) Attach panels [C] and [D] together, using blots and wing nuts.
3) Attach literature holders Velcro on to panel [B].
4) Connect blocker fabric to Velcro on extrusions [8] and [8A].
5) Install SEG graphic to assembled lightboxes, and blocker
fabric to back. See SEG Installation sheet, for instruction.
Completed Assembly
Literature
Holders
bolt
bolt
bolt
bolt
bolt bolt
bolt
bolt bolt
bolt
bolt
bolt
bolt
t-nut
t-nut
t-nut
t-nut
t-nut
t-nut
V4
V4
V4 V4
V4
V4
bolt
wing
nut
8A
8
Attachments
/