Classic Exhibits VK-2948 Setup Instructions

  • Hello! I am an AI chatbot trained to assist you with the Classic Exhibits VK-2948 Setup Instructions. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
© 2020
Order #XXXXX
Top View
Perspective View
10’
20’
Locked layer contains
placeholder marks.
VK-2948 - 10’ x 20’ Kit
If you would like to tell us about your experience with your setup instructions please email us at [email protected]
SETUP INSTRUCTIONS
© 2020
Order #XXXXX
DO NOT USE POWER TOOLS
ALL CONNECTIONS MUST
BE TIGHTLY SECURED
Part Identification - Numbering
Spline Connection Base Plate & Extrusion Connection
General Setup Instructions
- Read entire setup instruction manual prior to
unpacking parts and pieces.
- The setup instructions are created specifically
for this configuration.
- Setup instructions are laid out sequentially in
steps, including exploded views with detailed
explanation for assembly.
WARNING
Cleaning & Packing
- For Cleaning Metal, Plex, & Laminate Parts:
Use a MILD NON-ABRASIVE cleanser and
soft cloth/paper towel to clean all surfaces.
- Keep exhibit components away from heat
and prolonged sun exposure.
Heat and UV exposure will warp and
fade components.
- Retain all provided Packing Materials.
All provided packing materials are for
ease of repacking & component protection.
Disassembly
- For loss prevention, tighten all set screws
and locks during disassembly.
7A
Hex Tool - Essential for Assembly
Extrusion & Lock Connection Engaged Lock
LADDERS OR LIFTS
MAY BE REQUIRED
General Information
© 2020
Order #XXXXX
1) Locate channels along the edges of extrusions
2) Insert graphic corners first into channels then center
point of graphic into channels. Allows for proportional
fit around the perimeter of the extrusion.
3) Working from center to corner, slide silicon edge
on graphic into channel.
4) After all edges of graphic have been inserted into
channels, step back and assess graphic fit, make
adjustments where needed.
4
13
2
Fold edges over.
Insert into
groove
of frame
SEG Installation
© 2020
Order #XXXXX
Straight Connection
All knobs must be tightened securely to ensure a proper connection.
All knobs must be tightened securely to ensure a proper connection.
Adjust connectors if necessary to
prevent gaps in connection.
Upper Horizontal Extrusion
Lower Horizontal Extrusion
Straight Connector
Straight Connector
Corner
Connectors Corner
Connectors
Corner
Connectors Corner
Connectors
COMPLETED ASSEMBLY
3) Tighten all knobs to secure connection.
Slide verticals over
lower connectors.
Then slide upper
connectors into
groove of verticals.
Tighten all knobs.
When assembling frame, first attach all straight
connectors, then attach corner connectors.
1) Place extrusions end-to-end.
2) Loosen all knobs, then slide straight
connectors across the seam of extrusions.
Disassembly
1) Loosen all knobs.
2) Slide connectors off of one extrusion.
3) Tighten knobs to prevent loss during
packing & shipping.
CEI110 Profile
Slide both connectors across seam of extrusions.
Tighten all knobs.
Corner Connection
3) Tighten all knobs to secure connection.
Disassembly
1) Loosen knobs on vertical extrusions.
2) Slide the vertical extrusions off of
corner connectors on lower and upper
horizontal extrusions.
1) Loosen knobs, then slide vertical extrusions onto
corner connectors of lower horizontal extrusion.
2) Slide corner connectors of upper horizontal
extrusion into grooves of vertical extrusions.
Keep straight connectors in groove of
extrusion. Do not remove connectors
during disassembly.
CEI110 Frame Assembly
© 2020
Case 1 of 2
Order #XXXXX
Top View of Each Level
Level 2
10
4
5 5 5A 5A
44A 4A
7A 7A 8A
10
1
(Qty. 2)
Level 3 Level 4 Level 5Level 1 (Bottom Level)
Setup Hardware
2 3 2A 3A
Setup Hardware
Case Packing
© 2020
Case 2 of 2
Order #XXXXX
Top View of Each Level
Level 2
11
9999
5 6 5A 6A
7 7 8
11
1
(Qty. 2)
Level 3 Level 4 Level 5Level 1 (Bottom Level)
Graphics
10 10
1
(Qty. 2)
2 3 2A 3A
Graphics
Level 6
Case Packing
© 2020
Step 1 of 2
Order #XXXXX
Locked layer contains
placeholder marks.
5678765
5A
2A
2
3A
3
4A
4
2A
2
111111
9
9
9
9
4A
4
3A
3
6A 7A 8A 7A 6A 5A
10 10 11 11 10 10
Item
1
2,2A
3,3A
4,4A
5,5A
6,6A
7,7A
8,8A
9
10
11
Qty.
6
2,2
2,2
2,2
2,2
2,2
2,2
1,1
4
4
2
Description
Base Plate
47.5” CEI110 Vertical Extrusion
47.5” CEI110 Vertical Extrusion
47.5” CEI110 Vertical Extrusion
28” CEI110 Horizontal Extrusion
28” CEI110 Horizontal Extrusion
38.667” CEI110 Horizontal Extrusion
38.667” CEI110 Horizontal Extrusion
45.677” Z45 Vertical Extrusion
25.28“ Z45 Horizontal Extrusion
35.94” Z45 Horizontal Extrusion
Completed Assembly
******
**
**
**
PR53 Connector
Slide extrusion over PR53
connector then tighten
set screws to secure.
*
PR53
Connector
Set
Screw
Extrusion
Note: To prevent product loss, keep
all screws attached to
connector after disassembling.
CEI-110
Z45
Z45 Attachment
Attach Z45 horizontal to back
groove of CEI-110 vertical.
*
Steps:
1) Assemble CEI110 extrusions together, as shown, flat on
floor. See CEI110 Frame Assembly sheet for details.
2) Attach verticals [9] into assembled frame as shown.
See PR53 Connector and Z45 Attachment details.
3) Attach horizontals [10] and [11] to assembled frames
as shown. See Z45 Attachment detail.
4) Attach base plates [1] to horizontals [5] [6] and [7], in
direction of arrows, using bolts, washers, and wing nuts.
5) Install SEG graphic to front and back of assembled frames.
See SEG Graphic Installation sheet for details.
Backwall Assembly
© 2020
Step 2 of 2
Order #XXXXX
Locked layer contains
placeholder marks.
Steps:
1) Connect lights and transformers. See Light to Light Connection
and Light to Transformer Connection details.
2) Install SEG graphic to front and back of assembled frames.
See SEG Installation sheet for details.
Power
Break
Power
Break
Power
Break
Power
Break
Power
Break
Power
Break
Power
Break
Power
Break
Hole for Cord
Management
Hole for Cord
Management
Transformer Transformer
Hole for Cord
Management
Hole for Cord
Management
Transformer TransformerTransformer TransformerTransformerTransformer
++
+
-
-
-
to power
Lights
Male
Male
Female
Female
Transformer
96W / 4A / 24V
Light to Light Connection
Light to Transformer Connection
Maximum of 9 lights per transformer.
Wire Management
/