Beghelli Boxled® BL726 DOT Installation guide

Category
Wall & ceiling mounts accessories
Type
Installation guide
BEGHELLI MÉXICO
ENG-MI-BL726LED-031621
INSTALLATION INSTRUCTIONS
Av. del Marqués No. 70 Int.4. Parque
Industrial Bernardo Quintana
CP.76246 El Marqués, Qro, México
Tel: 1 52 (442) 221.62.15/221.64.39
BEGHELLI USA
3810 Executive Way
Miramar, Florida 33025, USA
Tel: (954) 442-6600
Toll Free: 1 (800) 726-4316
CONCRETE SLAB
BRACKET
ANCHOR STUD
(BY OTHERS)
FM - FLOOD MOUNT (STANDARD)
BOXLED BL726 LED LO/MO/HO
WATTAGE 50W/70W/90W
VOLTAGE 120-277V/347V/480V 50/60Hz
WET LOCATION YES
OPERATION HT (AC ONLY)/0-10V DIMMING
AMBIENT TEMPERATURE -40 C(-40 F)/45 C(113 F)
WEIGHT 8.8 lbs
DIMMENSION 12.8" L X 12.6" W X 4.6" H
AC LEADS
BLACK...... (HOT)
WHITE........(NEUTRAL)
GREEN...... (GROUND)
0-10V LEAD / DALI
VIOLET......(DIM +)
GRAY........(DIM -)
CAUTION ! ALWAYS MAKE SURE THE POWER IS TURNED OFF before starting the installation 1.
Wiring fixture to power supply, shall be performed by a certified electrician, and wired in a manner that 2.
complies with all local and national electrical codes, as well as the manufacturer's wiring diagram.
0-10V DIMMING WIRES MUST BE RUN FROM A DIFFERENT CONDUIT OUT OF THE J-BOX
1. Install the fixture to designated location,
use dimension below for bolt's location.
2. Use typical anchor bolts similar to the
reccommended in size and length. Install
anchor bolts according to the anchor botls
installation instruction.
0.43in
0.4in
6.69in
6.7in
3/8 X 2-1/4"L
(Recommended)
SCREW
Retighten once the angle is set.
Loosen the screw to adjust the angle.
INDICATOR MARK
12.6in
13in
12.8in
12.8in
4.6in
4.6in
BEGHELLI MÉXICO
ENG-MI-BL726LED-031621
INSTALLATION INSTRUCTIONS
Av. del Marqués No. 70 Int.4. Parque
Industrial Bernardo Quintana
CP.76246 El Marqués, Qro, México
Tel: 1 52 (442) 221.62.15/221.64.39
BEGHELLI USA
3810 Executive Way
Miramar, Florida 33025, USA
Tel: (954) 442-6600
Toll Free: 1 (800) 726-4316
AC - AVIATION CABLE KIT
Press down to release lock
Release to engage the lock
1. Install the fixture to designated location, use dimension on the right for screws'
location.
shown.
Attach the Clip-Hook to the Bracket as
- HOOK MOUNT KITHK
- PENDANT KITPK
Secured-Screw. Feed the
Power Cord thru Stem
Hook the Chains & Eye bolts together and
Attach the Eye bolts to the fixture as shown.
crimped shut as shown.
Attach Adaptor to Bracket;
then attach Stem to
Adaptor and secure with
Attach Cable Gripper to the Bracket
as shown.
Lock-Nut
Flat Washer
Clip-Hook
CH - CHAIN HANG KIT
Stem
Secured-Screw
Stem Adaptor
Screw
"S" Hook
(Sold Separately)
Chain
Eye Bolt
CEILING
UPPER BRACKET
LOWER BRACKET
(BY OTHERS)
MOUNTING HARDWARE
(SUPPLIED)
BRACKET SCREWS
CANOPY KIT
(BY OTHERS)
SM - SURFACE MOUNT UPPER BRACKET
6.3in
6.30in
0.26in
0.3in
STOPPER FLANGE
TAB
ENGAGING FLANGES
SCREW LOCKING
LOWER
BRACKET
  • Page 1 1
  • Page 2 2

Beghelli Boxled® BL726 DOT Installation guide

Category
Wall & ceiling mounts accessories
Type
Installation guide

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI