modules shall not exceed the rated power of each channel.
and power, the inverter will start.
crystal will show that the inverter is self-checking.
4. If the parameter is within acceptable range, the inverter will generate energy.
NORMAL indicator light is on.
6.1 Start up the inverter
connector. The inverter will close the LCD and all led within two minutes.