Aereco V2A Operating instructions

  • Hello, I am a chat assistant ready to answer your questions about the Aereco V2A supply set replacement. I have analyzed the user manual and understand the steps required for a safe and correct installation. I can assist you with information regarding the precautions, component replacement, and other topics presented in this document. Feel free to ask me any question.
  • What should I do before starting the replacement?
    Is it safe to perform the replacement on my own if I am not a qualified technician?
    What are the risks if I don't follow the recommendations?
REPLACEMENT KIT FOR V2A SUPPLY SET – FOR AVE052 / AVE1032 / DP876
11.2014
V2A
1. Before any intervention,
cut o the fan supply
from the circuit breaker.
WARNING CONCERNING REPLACEMENT OF THE MOTO-TURBINE
ON A PRODUCT ALREADY INSTALLED :
·the replacement must be carried out by a qualified technician
·the manufacturer and the distributor decline any responsibility
in the event of a non conformity use of the product
·in the event of non respect of these recommendations, the
protection of the product can be compromised.
2. Remove the lid.
3. Unscrew and remove the
trap door of the electrical
case.
6. Unclip the 2 terminal
blocks.
4. Disconnect the power
supply connector of the
motor and remove the
electronic card.
7. Unscrew and remove the
entire supply set.
5. Release all the wires
connected to the terminal
blocks.
REPLACEMENT KIT FOR V2A SUPPLY SET
TF4292_C
Aereco S.A – 62 rue de Lamirault – Collégien – 77615 MARNE LA VALLEE CEDEX 3 – FRANCE – www.aereco.com
8. Place and screw the new
supply set. Tighten the left
screw before inserting the
electronic card.
9. Place the right screw in into
the eyelet terminal.
13. Close and screw the lid of
the electric case.
and screw it. 14. Close the lid.
11. Screw back the power cord
wires.
The external tooth lock washer
must be necessarily placed
between the the eyelet
terminal and the base of the
transformer.
10. Clip the 2 terminal blocks
of the new supply set.
12. Connect the power supply
connector.
15. Engage the circuit breaker
in order to supply the fan
and check its operation.
/