FSR T3-AC2-CP-BRS, T3-AC2-CP-SQBRS Installation guide

  • Hello! I've reviewed the provided installation instructions for the FSR T3-AC2CP Table Box. This document outlines the steps for securely mounting the unit into a table, including the use of a clamp shroud, threaded rods, and cable management for electrical connections. I'm ready to assist with any questions you might have about the installation procedure or features.
  • What is the minimum table thickness required for installation?
    What is the maximum table thickness allowed for installation?
    What size hole is required in the table for installation?
    How many wood screws are needed to install the clamp shroud?
    What size threaded rods are recommended for installation?
    How far should the connectors be able to pull out after installation?
FSR 244 Bergen Boulevard, Woodland Park, NJ 07424, Phone: 973.785.4347 - Fax: 973.785.4207
43169 LIT1285A
1.63
3.25
1.63
3.25
5.50
ASSEMBLED VIEW
UNDERSIDE VIEW OF SHROUD
#6 / #8 MOUNTING
SCREW HOLES
3.50" DIA. THRU
HOLE ON TABLE
PRE-CUT 3.50" DIA.
HOLE IN TABLE
1.00" MIN. TO 2-1/2" MAX.
TABLE THICKNESS
(6) #6 / #8 x 1/2"
WOOD SCREW
(5) CABLE
TIE TAB
T3-AC2CP
SUB-ASS'Y
DROP THE 'T3-AC2CP' SUB-ASS'Y
INTO THE HOLE IN THE TABLE
(COVER ORIENTATION IS PRE-SET
BY THE SHROUD INSTALLATION).
INSTALL CLAMP SHROUD TO UNDERSIDE
OF TABLE HOLE WITH (6) WOOD SCREWS
AS SHOWN. ORIENT PER DESIRED
COVER SWING DIRECTION.
PASS THE DESIRED-LENGTH (2) LONG
THREADED ROD THRU THE SHROUD AND
THREAD INTO SHORT STANDOFFS IN THE
SUB-ASS'Y. TURN THE LOCKING NYLON NUT
UP SNUG AGAINST THE SHROUD BASEPLATE
TO PULL THE SUB-ASS'Y DOWN COMPLETELY
INTO PLACE IN THE PRE-CUT 3.50" DIA. HOLE.
MAKE ELECTRICAL CONNECTIONS AS
REQUIRED AND TIE-WRAP CABLES TO
TIE-TABS. ENSURE CONNECTORS IN THE
SUB-ASS'Y CAN BE PULLED OUT 3'-0"
PRIOR TO SECURING CABLES TO TIE TABS.
T3-AC2CP
INSTALLATION
INSTRUCTIONS
1
2
4
4.25
2.13
7.50
2.13
(2) LOCKING NYLON NUT
(2) #6-32 x 2.00" or 3.00" LONG
THREADED ROD
3
/