FSR HV-T6-BLK Installation guide

Type
Installation guide
FSR 244 Bergen Boulevard, Woodland Park, NJ 07424, Phone: 973.785.4347 - Fax: 973.785.4207
43040 LIT1457A
ASSEMBLED VIEW
UNDERSIDE VIEW OF SHROUD
HV-T6 SUB-ASS'Y
INSTALL DESIRED BRACKETS INTO THE
'HV-T6' SUB-ASS'Y. DROP THE SUB-ASS'Y
INTO THE HOLE IN THE TABLE
(COVER ORIENTATION IS PRE-SET
BY THE SHROUD INSTALLATION).
INSTALL CLAMP SHROUD TO UNDERSIDE
OF TABLE HOLE WITH (5) WOOD SCREWS
AS SHOWN. ORIENT PER DESIRED
COVER SWING DIRECTION.
PASS THE DESIRED-LENGTH (2) LONG
THREADED ROD THRU THE SHROUD AND
THREAD INTO THE SUB-ASS'Y. TURN THE
LOCKING NYLON NUT UP SNUG AGAINST
THE SHROUD BASEPLATE TO PULL THE
SUB-ASS'Y DOWN COMPLETELY INTO
PLACE IN THE PRE-CUT 6.00" DIA. HOLE.
MAKE ELECTRICAL CONNECTIONS AS
REQUIRED AND TIE-WRAP CABLES TO
TIE-TABS. ENSURE HDMI CONNECTORS IN
THE SUB-ASS'Y CAN BE PULLED OUT 3'-0"
PRIOR TO SECURING CABLES TO TIE TABS.
HV-T6 INSTALLATION INSTRUCTIONS
(5) #6 / #8
MOUNTING
POINTS
2
1
4
PRE-CUT 6.00" DIA.
HOLE IN TABLE
3/4" MIN. - 2-1/4" MAX.
TABLE THICKNESS
(5) #6 / #8 x 1/2"
WOOD SCREW
3.50
7.00
5.50
5.50 7.00
2.75
2.75
3.38
9.05
(6) CABLE
TIE TAB
6.00" DIA. THRU
HOLE IN TABLE
3
(2) LOCKING NYLON NUT
(2) #6-32 x 2.00" or 3.00" LONG
THREADED ROD
  • Page 1 1
  • Page 2 2

FSR HV-T6-BLK Installation guide

Type
Installation guide

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI