FSR WE-IPD2-WHT, WE-IPD2-BLK, WE-IPD2-SLV Installation guide

  • Hello! I am a chat assistant and I have analyzed the provided FSR installation instructions for the WE-IPAD2 and IPAD2NB iPad mounts. This document details the step-by-step process of securing the mount to a wall, installing your iPad using a silicon sleeve, and correctly attaching the cover and locking it with screws. I'm ready to answer any questions you may have about the installation process or the device itself.
  • What type of cable is recommended?
    Is the iPad included with the mount?
    What is provided by the manufacturer in package?
FSR244 Bergen Boulevard, Woodland Park, NJ 07424, Phone: 973.785.4347 - Fax: 973.785.4207
43796 LIT1402
USE SHORT SHELL TYPE
1
2
COVER
(WE-IPAD
SHOWN)
BASE
REMOVE COVER FROM BASE AS SHOWN.
1. 2. SECURE BASE TO WALL (SEE BACK OF THIS PAGE).
FINISHED WALL
2G BOX
BASE
IPAD (SUPPLIED
BY CUSTOMER)
WITH SILICON
SLEEVE (SUPPLIED)
3. INSTALL PROVIDED SILICON SLEEVE TO
IPAD (SUPPLIED BY CUSTOMER) AND
MAKE ELECTRICAL CONNECTIONS AS
REQUIRED. POSITION IPAD IN BASE AND
SUPPORT IPAD FROM FALLING.
WE-IPAD2/IPAD2NB INSTALLATION INSTRUCTIONS
4. REINSTALL COVER AS SHOWN WHILE
SUPPORTING IPAD FROM FALLING. 5. TIGHTEN (2) LOCKING SCREW
COMPLETELY WITH SUPPLIED
DRIVER. DO NOT OVER TIGHTEN.
COVER SUPPORT IPAD WHILE
REINSTALLING COVER
1
2
LOCKING SCREW
ACCESS HOLE
LOCKING SCREW
ACCESS HOLE
IPAD INTERFACE
CABLE (SUPPLIED
BY CUSTOMER)
(8) CABLE
PASS-THRU
OPENING
FSR244 Bergen Boulevard, Woodland Park, NJ 07424, Phone: 973.785.4347 - Fax: 973.785.4207
2G ELECTRICAL BOX (E.B.)
SHOWN FOR REFERENCE
(SUPPLIED BY CUSTOMER)
ALTERNATE 2G E.B. MOUNTING HOLES
ALTERNATE 2G E.B. MOUNTING HOLES
ALTERNATE 2G E.B. MOUNTING HOLE
(8) CABLE PASS-THRU OPENING
OR
2G ELECTRICAL BOX (E.B.)
SHOWN FOR REFERENCE
(SUPPLIED BY CUSTOMER)
(8) CABLE
PASS-THRU
OPENING
ALTERNATE 2G E.B. MOUNTING HOLES
ALTERNATE
2G E.B.
MOUNTING
HOLES
ALTERNATE 2G E.B. MOUNTING HOLE
ALTERNATE VESA
MOUNTING HOLES
ALTERNATE VESA
MOUNTING HOLES
/