FSR T3-AC2-CP-BRS, T3-AC2-CP-SQBRS Installation guide

  • Hello! I am an AI chatbot trained to assist you with the FSR T3-AC2-CP-BRS Installation guide. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
FSR 244 Bergen Boulevard, Woodland Park, NJ 07424, Phone: 973.785.4347 - Fax: 973.785.4207
43169 LIT1285A
1.63
3.25
1.63
3.25
5.50
ASSEMBLED VIEW
UNDERSIDE VIEW OF SHROUD
#6 / #8 MOUNTING
SCREW HOLES
3.50" DIA. THRU
HOLE ON TABLE
PRE-CUT 3.50" DIA.
HOLE IN TABLE
1.00" MIN. TO 2-1/2" MAX.
TABLE THICKNESS
(6) #6 / #8 x 1/2"
WOOD SCREW
(5) CABLE
TIE TAB
T3-AC2CP
SUB-ASS'Y
DROP THE 'T3-AC2CP' SUB-ASS'Y
INTO THE HOLE IN THE TABLE
(COVER ORIENTATION IS PRE-SET
BY THE SHROUD INSTALLATION).
INSTALL CLAMP SHROUD TO UNDERSIDE
OF TABLE HOLE WITH (6) WOOD SCREWS
AS SHOWN. ORIENT PER DESIRED
COVER SWING DIRECTION.
PASS THE DESIRED-LENGTH (2) LONG
THREADED ROD THRU THE SHROUD AND
THREAD INTO SHORT STANDOFFS IN THE
SUB-ASS'Y. TURN THE LOCKING NYLON NUT
UP SNUG AGAINST THE SHROUD BASEPLATE
TO PULL THE SUB-ASS'Y DOWN COMPLETELY
INTO PLACE IN THE PRE-CUT 3.50" DIA. HOLE.
MAKE ELECTRICAL CONNECTIONS AS
REQUIRED AND TIE-WRAP CABLES TO
TIE-TABS. ENSURE CONNECTORS IN THE
SUB-ASS'Y CAN BE PULLED OUT 3'-0"
PRIOR TO SECURING CABLES TO TIE TABS.
T3-AC2CP
INSTALLATION
INSTRUCTIONS
1
2
4
4.25
2.13
7.50
2.13
(2) LOCKING NYLON NUT
(2) #6-32 x 2.00" or 3.00" LONG
THREADED ROD
3
/