Classic Exhibits VK-2979 Setup Instructions

  • Hello, I'm your chat assistant. I've reviewed the setup instructions for the VK-2979 Exhibit. The document details a comprehensive assembly process, including specifics on SEG graphics, panel connections, and care for rolling graphics. I'm ready to help with any questions you have about setting up your exhibit.
  • What is essential for assembly?
    What should I use to clean the exhibit components?
    What should be done with packing materials?
© 2019 Order #XXXXX
Top View
10’
20’
Perspective View
VK-2979 General Layout
If you would like to tell us about your experience with your setup instructions please email us at [email protected]
SETUP INSTRUCTIONS
© 2019 Order #XXXXX
Locked layer contains
placeholder marks.
= 1 sq foot
Grid View
© 2019 Order #XXXXX
DO NOT USE POWER TOOLS
ALL CONNECTIONS MUST
BE TIGHTLY SECURED
Part Identification - Numbering
Spline Connection Base Plate & Extrusion Connection
General Setup Instructions
- Read entire setup instruction manual prior to
unpacking parts and pieces.
- The setup instructions are created specifically
for this configuration.
- Setup instructions are laid out sequentially in
steps, including exploded views with detailed
explanation for assembly.
WARNING
Cleaning & Packing
- For Cleaning Metal, Plex, & Laminate Parts:
Use a MILD NON-ABRASIVE cleanser and
soft cloth/paper towel to clean all surfaces.
- Keep exhibit components away from heat
and prolonged sun exposure.
Heat and UV exposure will warp and
fade components.
- Retain all provided Packing Materials.
All provided packing materials are for
ease of repacking & component protection.
Disassembly
- For loss prevention, tighten all set screws
and locks during disassembly.
7A
Hex Tool - Essential for Assembly
Extrusion & Lock Connection Engaged Lock
LADDERS OR LIFTS
MAY BE REQUIRED
General Information
© 2019 Order #XXXXX
LT Panel Assembly
1) With a vertical offset, place LT-Panels side-by-side;
slide vertically offset panel down to lock panels
together and in place.
2) Corner Connectors (90°, T-Connector, Straight Connector)
connect just as panels connect together. Repeat Step 1
for installing corner connectors to panels.
LT Panel Disassembly
1) To disassemble push panel with upper locks horizontally
to disengage top lock clip.
2) Slide panels or connectors vertically in opposing directions
to release latches and disconnect parts.
While pushed in,
pull panel up to
disassemble
Push Panel in to
disengage the lock.
4
13
2
Fold edges over.
Insert into
groove
of frame
SEG Graphic Installation
1) Locate channels along the edges of extrusions
2) Insert graphic corners first into channels then center
point of graphic into channels. Allows for proportional
fit around the perimeter of the extrusion.
3) Working from center to corner, slide silicon edge
on graphic into channel.
4) After all edges of graphic have been inserted into
channels, step back and assess graphic fit, make
adjustments where needed.
SEG Installation & Panel Assembly
© 2019 Order #XXXXX
ROLLING GRAPHICS
ATTENTION: Please keep all packing material for graphics such as Tubes, Boxes and Bags.
Loss o these items could result in Damage to the graphic.
When Graphic has been removed from display, please Roll Graphic back on provided Cardboard Tube.
Not Rolling the graphic could result in Wrinkles and ink creases in the graphic.
Steam when needed.
Rolling Graphics
© 2019
Crate 1 of 1
Order #XXXXX Crate Packing
© 2019
Step 1 of 8
Order #XXXXX
2A
4A
6
5
8
7
2A
11 10A
10
12
1
913
31A 1A
9A
3A
1A
242A
TSP46
Lock
TSP46 Corner Connection
*Lock
Slide end of extrusion over
corner lock as shown.
Tighten set screws to
secure extrusions.
TSP49
Lock
TSP49 Corner Connection
*
Slide end of extrusion over
corner lock as shown.
Tighten set screws to
secure extrusions.
Custom Cam Lock
for TSP46
*
TSP46
Tighten screw to
clamp cam lock
into groove of
vertical extrusion.
Custom Cam Lock
for TSP49
*
TSP49
Tighten screw to
clamp cam lock
into groove of
vertical extrusion.
TSP49 TSP46
Completed Back Frame
Completed Front Frames
Front Frames Back Frame
*
*
*
*
*
*
*
*
*
*
*
***
*
*
*
*
*
*
*
*****
*
*
*
*
*
*
Steps:
Assemble frames flat on floor, then raise upright
to attach verticals [5] [6] [7] [8] [11] and [12].
1) Assemble front frames as shown.
See TSP46 Corner Connection detail.
2) Attach front frames between verticals [5] [6] [7] and [8].
See Custom Cam Lock for TSP46 detail.
3) Assemble back frame as shown.
See TSP49 Corner Connection detail.
4) Attach back frame between verticals [11] and [12].
See Custom Cam Lock for TSP49 detail.
Item
1,1A
2.2A
3.3A
4,4A
5
6
7
8
9,9A
10,10A
11
12
13
Qty.
1,1
1,1
1,1
1,1
1
1
1
1
1,1
1,1
1
1
1
Description
92” TSP46 Vertical Extrusion
39.7375” TSP46 Curved Horizontal Extrusion
92” TSP46 Vertical Extrusion
28” TSP46 Curved Horizontal Extrusion
92” S44 Vertical Extrusion
92” S44 Vertical Extrusion
92” S44 Vertical Extrusion
92” S44 Vertical Extrusion
92” TSP49 Vertical Extrusion
84.4392” TSP49 Curved Horizontal Extrusion
92” S44 Vertical Extrusion
92” S44 Vertical Extrusion
88.417“ Z33 Vertical Extrusion
Closet Assembly
© 2019
Step 2 of 8
Order #XXXXX
Completed Closet Assembly
Steps:
1) Attach door threshold between verticals [8] and [12].
See Door Threshold detail.
2) Attach horizontal [14] between verticals [5] and [11], then
slide infill between verticals.
3) Attach horizontal [14] between verticals [8] and [12], then slide
infill between verticals
4) Secure infills with horizontals [15].
5) Connect door to vertical [12]. See Door Connection detail.
6) Apply SEG graphics to front and back frames.
See SEG Graphic Installation sheet for instruction.
Item
15
14
--
Qty.
2
2
1
Description
28“ Z45 Horizontal Extrusion
28“ Z45 Horizontal Extrusion
Door Threshold
SE
G
Gr
a
p
h
ic
S
E
G
G
r
a
p
h
i
c
Door
Threshold
Tighten
setscrew
to secure.
Slide Connector
into groove
of extrusion.
Door Threshold
*Door
Hinge
Hinge
Pin
Slide Pin into
Hinge attached
to Vertical.
Slide Door
Hinge over Pin.
Door Connection
*
15 11
12
5
15
14
8
14
D
o
or
Inf
i
l
l
Inf
i
ll
*
*
*
Keep side extrusions [8] [12] [14] [15]
and door assembled when packing.
S
E
G
G
r
a
p
h
i
c
S
E
G
G
r
a
p
h
i
c
Closet Assembly (Cont’d)
© 2019
Step 3 of 8
Order #XXXXX
17A
16A
19
19
18
16
10” 10”
59.25”
17
Item
16,16A
17,17A
18
19
Qty.
1,1
1,1
1,1
1
Description
90” TSP46 Vertical Extrusion
42” TSP46 Horizontal Extrusion
38.417” Z140 Horizontal Extrusion
38.417” Z45 Horizontal Extrusion
Steps:
1) Connect horizontals [17] and [17A] between verticals
[16] and [16A]. See TSP46 Corner Connection detail.
2) Attach horizontals [18] and [19] between verticals
[16] and [16A].
3) Attach frame assembly to closet verticals [6] and [7],
using 1” standoff barrels and 5/16 - 1 1/4” bolts.
4) Attach monitor mount to horizontal [18]. See Monitor
Mount Attachment detail.
5) Install SEG graphic to front of assembled frame. See
SEG Graphic Installation sheet for instruction.
*
*
*
*
Completed Closet Assembly
with Front Frame
*
Lock
Set Screw
Slide end of extrusion over
Lock. Tighten set screw to
secure extrusions together.
TSP46 Corner Connection
6
7
18
Standoff
Barrel
S
EG
Gra
p
h
i
c
*
Keep front frame [16] [16A] [17] [17A]
[18] and [19] assembled when packing.
Mount
Plate
*Monitor Mount Attachment
Wing
Nut
5/16
1 1/4”
Bolt
Monitor
Mount
Attach monitor mount to mount plate, using bolts
and wing nuts.
Note: Monitor mount attaches over SEG graphic.
SEG Graphic
Front Frame Assembly
© 2019
Step 4 of 8
Order #XXXXX
**
Hole for cord
management.
Ceiling
Panel
Ceiling
Panel
Hole for cord
management.
**
**
*
***
1) Slide V4 connector into groove of horizontal
extrusion. Tighten set screw to secure.
2) Use bolt to attach ceiling panel to V4 connector.
Ceiling Panel
Horizontal Extrusion
Ceiling Connection
*
Set
Screw
V4 Connector
5/16
1 1/4”
Bolt
1) Use screw cap to attach ceiling panel to T-nut.
Ceiling Panel
Vertical Extrusion
Ceiling Connection
*
T-Nut
1 1/8”
Screw
Cap
Connect power cords to puck lights in ceiling.
Puck Light Connection
*
Transformer
to
power
Puck Light
Completed Assembly
Steps:
1) Attach ceiling panels to top of assembled closet
See Ceiling Connection details.
2) Connect power cords to puck lights in ceiling panels.
See Puck Light Connection detail. Use holes in ceiling
panels for cord management.
Ceiling Attachments
© 2019
Step 5 of 8
Order #XXXXX
12
Steps:
1) Attach base plates [20] to verticals [21] [22] [23] [24],
using bolts.
2) Connect lower horizontal [25] between vertical [21] and
closet vertical [12], slide infill between verticals and
secure with horizontal [25], then insert infill and secure
with upper horizontal [25].
3) Connect lower horizontal [26] between verticals [21] and
[22], slide infill between verticals and secure with
horizontal [26], then insert infill and secure with upper
horizontal [26].
4) Attach lower horizontal [27] between verticals [22] and [23],
slide infill between verticals, then secure with horizontal [27].
5) Attach lower horizontal [28] between verticals [23] and [24],
slide infill between verticals, then secure with horizontal [28].
21
25 26
28
28
27
27
26
25
22
23
24
20
20
20
20
Item
20
21
22
23
24
25
26
27
28
Qty.
4
1
1
1
1
4
4
3
3
Description
Base Plate
91.75” S44 Vertical Extrusion
91.75” S44 Vertical Extrusion
48” S44 Vertical Extrusion
48” S44 Vertical Extrusion
48” Z45 Curved Horizontal Extrusion
84” Z45 Curved Horizontal Extrusion
48” Z45 Curved Horizontal Extrusion
48” Z45 Curved Horizontal Extrusion
I
n
f
i
l
l
I
n
f
i
l
l
I
n
f
i
l
l
I
n
f
i
l
l
i
n
f
i
l
l
i
n
f
i
l
l
25 26
Completed Assembly
Wall Assembly
© 2019
Step 6 of 8
Order #XXXXX
21
22
90” PR63 Conduit
90” PR63 Conduit
Item
-- Qty.
2Description
90” PR63 Conduit
Steps:
1) Attach lights to top of curved wall.
See Light Attachment detail.
2) Attach PR63 conduit to verticals [21] and [22] for
cord management. See PR63 Attachment detail.
*
Slide light onto clip then lock clip
into groove of horizontal extrusion.
Clip
Light
Light Attachment
Clip
Light
Horizontal Extrusion
**
pinch
PR63 Attachment
PR63 Conduit
PR63
Top View
Route cord through
conduit. Attach conduit
to assembly vertical
extrusion by pinching
the opening and
inserting into the
groove of extrusion.
S44
Completed Assembly
Wall Attachments
© 2019
Step 7 of 8
Order #XXXXX
1
1
2
Door
2
3
3
4
4
5
5
6
6
7
7
8
8
Shelf support
Internal Shelf
Counter Top
Top View of Counter Base
Item
1
2
3
4
5
6
7
8
Description
38” 90° LT Connector
36.9738“ x 38” Curved LT Panel w/ Door
38” 90° LT Connector
19“w x 38”h LT Panel
38” 90° LT Connector
44.13“w x 38” LT Panel
38” 90° LT Connector
19“w x 38”h LT Panel
Steps:
1) Assemble LT panels and connectors in numerical order.
making sure Velcro is facing inward.
2) Attach shelf supports to Velcro on panels [4] and [8],
then place internal shelf on top of supports..
3) Lock counter top to panels [4] and [8].
See Counter Top Lock detail.
*
Shelf support
Shelf support
Shelf support
Completed Reception
Counter
Align hole with pin Rotate pin. Spring
will push pin into hole.
Counter Top Lock
12
*
Pin
Hole
*
Reception Counter
© 2019
Step 8 of 8
Order #XXXXX
Completed Assembly
Underside View
Base
Bolt
Black
Bolt
Table Top
Post
Steps:
1) Connect base to post, using bolt.
2) Route cord from table top through post and base.
3) Connect table top to post, with fixed brackets, using black bolts.
MOD-1452 Charging Table
/