6
AD 3000 Super BAH0107-0 02.20
5.6
Seeding shaft drive................................................................................................................ 56
5.7 Metering ................................................................................................................................ 57
5.7.1 Setting values ........................................................................................................................ 58
5.7.2 Normal and fine seed metering wheel................................................................................... 60
5.7.3 Fine seed metering wheel brushes ....................................................................................... 60
5.7.4 Bean seed metering wheel .................................................................................................... 60
5.7.5 Bottom flaps .......................................................................................................................... 61
5.7.6 Slide gate .............................................................................................................................. 62
5.7.7 Agitator shaft support ............................................................................................................ 62
5.7.8 Seed rate calibration ............................................................................................................. 63
5.8 RoTeC Control coulter .......................................................................................................... 66
5.9 Coulter pressure and seed placement depth ........................................................................ 68
5.9.1 Coulter pressure adjustment, manually actuated .................................................................. 68
5.9.2 Coulter pressure adjustment, hydraulically actuated ............................................................ 69
5.10 Exact following harrow .......................................................................................................... 70
5.10.1 Exact following harrow tine position ...................................................................................... 71
5.10.2 Exact following harrow pressure ........................................................................................... 72
5.11 Roller harrow with contour guidance ..................................................................................... 73
5.12 Tramlines ............................................................................................................................... 74
5.12.1 Tramline control, tabular determination................................................................................. 75
5.12.2 Tramline control, graphic determination ................................................................................ 76
5.12.3 Functional description ........................................................................................................... 78
5.12.3.1 Lay shaft coupling, electrically actuated ............................................................................... 79
5.12.4 One-sided switching .............................................................................................................. 80
5.12.5 Tramline control 2 and 21 ..................................................................................................... 81
5.13 Tramline marker .................................................................................................................... 81
5.14 Track marker ......................................................................................................................... 82
6 Initial operation .......................................................................................... 83
6.1 Checking the suitability of the tractor .................................................................................... 84
6.1.1 Calculating the actual values for the total tractor weight, tractor axle loads and tyre
load-bearing capacity, as well as the required minimum ballast weight ............................... 85
6.1.1.1 Data required for the calculation (attached implement) ........................................................ 86
6.1.1.2 Calculation of the required minimum ballast weight at the front G
V min
of the tractor
to ensure steering capability ................................................................................................. 87
6.1.1.3 Calculation of the actual front axle load of the tractor T
V tat
................................................... 87
6.1.1.4 Calculation of the actual total weight of the combined tractor and implement ...................... 87
6.1.1.5 Calculation of the actual rear axle load of the tractor T
H tat
................................................... 87
6.1.1.6 Load-bearing capacity of the tractor tyres ............................................................................. 87
6.1.1.7 Table ..................................................................................................................................... 88
6.2 Secure the tractor / implement against unintentional starting and rolling away ................... 89
7 Coupling and uncoupling the implement ................................................ 90
7.1 Hydraulic hose lines .............................................................................................................. 92
7.1.1 Coupling the hydraulic hose lines ......................................................................................... 92
7.1.2 Disconnecting the hydraulic hose lines ................................................................................. 93
7.2 Safety instructions for coupling the seed drill ........................................................................ 94
7.2.1 Coupling and uncoupling the implement combinations - Overview ...................................... 96
7.2.2 Mounting the seed drill on KG/KE/KX 00 soil tillage implements with 1-tube system
roller frame ● Tooth packer roller PW 500 ● Wedge ring roller KW 520 on
KG/KE/KX 01 soil tillage implements with 1-tube system roller frame ● Tooth
packer roller PW 500 ● Wedge ring roller KW 520 ● Simplex prismatic roller SX-45
SG (made by Güttler) ● Simplex prismatic roller SX-45 SU (made by Güttler) .................... 97
7.2.3 Uncoupling the seed drill from KG/KE/KX 00 soil tillage implements with 1-tube
system roller frame ● Tooth packer roller PW 500 ● Wedge ring roller KW 520 from
KG/KE/KX 01 soil tillage implements with 1-tube system roller frame ● Tooth
packer roller PW 500 ● Wedge ring roller KW 520 ● Simplex prismatic roller SX-45
SG (made by Güttler) ● Simplex prismatic roller SX-45 SU (made by Güttler) .................. 100
7.2.4 Mounting the seed drill on KG/KE/KX 00 soil tillage implements with 2-tube system
roller frames ● Tooth packer roller PW 600 ● Wedge ring roller KW 580 ......................... 103