ZA-V BAG0087.11
5.5 Dosing slider .......................................................................................................................... 42
5.6 Boundary, ditch and side spreading ...................................................................................... 43
5.7 Weighing technology (optional) ............................................................................................. 44
5.8 PTO shaft .............................................................................................................................. 45
5.8.1 Coupling the PTO shaft ......................................................................................................... 47
5.8.2 Uncoupling the PTO shaft ..................................................................................................... 48
5.9 Hydraulic system connections ............................................................................................... 49
5.9.1 Coupling the hydraulic hose lines ......................................................................................... 50
5.9.2 Uncoupling the hydraulic hose lines ...................................................................................... 51
5.10 Three-point hitch frame ......................................................................................................... 52
5.11 Setting chart .......................................................................................................................... 54
5.12 Control computer / Operating terminal ISOBUS ................................................................... 58
5.13 Bluetooth connection ............................................................................................................. 58
5.14 Control computer EasySet .................................................................................................... 59
5.14.1 Switch on ............................................................................................................................... 59
5.14.2 Functions ............................................................................................................................... 59
5.14.3 Connection ............................................................................................................................ 62
5.14.4 Error messages ..................................................................................................................... 62
5.14.5 EasySet calibration ................................................................................................................ 63
5.15 Calibration kit (option) ........................................................................................................... 64
5.16 Cover tarpaulin (optional) ...................................................................................................... 64
5.17 Transport and parking device ................................................................................................ 65
5.18 Border spreading deflector and bed spreading deflector ...................................................... 67
5.19 Three-way control (optional) ................................................................................................. 68
5.20 EasyCheck (option) ............................................................................................................... 70
5.21 Mobile test rig (option) ........................................................................................................... 70
5.22 Camera system (option) ........................................................................................................ 71
5.23 Implement mounted on the front of the tractor ...................................................................... 72
6 Commissioning ......................................................................................... 73
6.1 Checking the suitability of the tractor .................................................................................... 74
6.1.1 Calculating the actual values for the total tractor weight, tractor axle loads and load
capacities, as well as the minimum ballast ........................................................................... 74
6.2 Adjusting the length of the PTO shaft to the tractor .............................................................. 78
6.3 Securing the tractor / machine against unintentional start-up and rolling ............................. 80
6.4 Adjusting the hydraulic system with the system setting screw ............................................. 81
7 Coupling and uncoupling the machine ................................................... 83
7.1 Coupling the machine............................................................................................................ 84
7.2 Uncoupling the machine ........................................................................................................ 86
8 Adjustments............................................................................................... 88
8.1 Adjusting the mounting height ............................................................................................... 90
8.2 Mounting height for late top dressing .................................................................................... 91
8.3 Setting the spread rate .......................................................................................................... 92
8.4 Spread rate check ................................................................................................................. 94
8.4.1 Preparations for the spread rate check with the fertiliser chute ............................................ 95
8.4.2 Performing a spread rate check with the fertiliser chute ....................................................... 96
8.4.3 Performing a spread rate check with a calibration device on the side .................................. 96
8.4.4 Determining the shutter position with the sliding ruler .......................................................... 97
8.5 Setting the spreading disc speed ........................................................................................ 100
8.6 Setting the working width .................................................................................................... 101
8.6.1 Replacing the spreading discs ............................................................................................ 102
8.6.2 Adjusting the spreading vane positions............................................................................... 103
8.7 Checking the working width and lateral distribution ............................................................ 104
8.8 Boundary, ditch and side spreading .................................................................................... 105