VULCAN & WOLF ABC7E Combi Element Thread Change Operating instructions

  • Hello! I am an AI chatbot trained to assist you with the VULCAN & WOLF ABC7E Combi Element Thread Change Operating instructions. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
ABC Combi Element Thread Change
- NOTICE -
This Manual is prepared for the use of trained Hobart Service
Technicians and should not be used by those not properly
qualified.
This manual is not intended to be all encompassing. If you have
not attended a Hobart Service School for this product, you should
read, in its entirety, the repair procedure you wish to perform to
determine if you have the necessary tools, instruments and skills
required to perform the procedure. Procedures for which you do
not have the necessary tools, instruments and skills should be
performed by a trained Hobart Service Technician.
The reproduction, transfer, sale or other use of this Manual,
without the express written consent of Hobart, is prohibited.
SERVICE KIT INSTRUCTION
A product of Hobart Service 701 S. Ridge Ave Troy, OH 45374
F45840
ABC7E ML-137716 208 / 240 / 480
ML-137718 208P / 240P / 480P
INSTALLATION INSTRUCTIONS
ABC Combi Element Thread Change: Standard to Metric
MODEL ABC7E
WARNING
Disconnect the electrical power to the machine and follow lockout / tagout procedures.
Element assembly has changed threads from standard to metric. This will require different tools for removal and
installation.
STANDARD THREADS METRIC THREADS
Fig. 1
Fig. 2
NOTE: Element with metric threads will have a bend in
the elements as shown.
1. Install and torque outer nuts.
2. Install and torque bulk head/cavity nut.
3. Verify torque values for metric thread size.
Torque M4 nuts (10 in lbs./1.2 N.m) (first) outer nut (20 in.Lbs/2.3 N.m) and (180 in lbs/20 N.m) for bulk head/cavity
nut.
© HOBART SERVICE 2020 Page 1 of 1 F45840 (April 2020)
Fig. 3
/