PARCEL LOCKERS SOLUTION : ADD/REMOVE COLUMNS
© Quadient Page 9/10
4. SMA & PMA process / retrofit application
4.1 Retrofit process
❑ You must schedule the retrofit process 24 hours in advance
❑ On PMD, the device status must be changed to MAINTENANCE.
❑ The device must be emptied, all the parcels must have bee unloaded.
❑ On SMA/PMA, there’s no specific process. The application just has to be reinstalled from scratch
using the new configuration barcode corresponding to the retrofit version.
❑ When installation is finished, SMA/PMA sends a “register” to PMD with the retrofit version
structure of the device (see next slide for PMD process)
4.2 PMD – Actions triggered
When PMD receives a “register” event:
❑ PMD ensures that the status of the device is MAINTENANCE (or PLAN). If not, the register is
refused.
❑ PMD checks the configuration received and compare it with the current configuration of the device:
▪ If they are similar, PMD updates the ciphers (case GEN4), the password (GEN2) and changes
the status of the device to ACTIVE (existing process to reinstall a device)
▪ If they are different, PMD first ensures that the device is empty. If not, the register is
refused.
▪ If they are different and the device is empty, PMD checks if a “retrofit” version exists for the
device. If not, the register is refused.
▪ If the retrofit version exists, PMD checks the configuration received and compare it with the
retrofit configuration of the device. If they are different, the register is refused – else the
register is accepted.
❑ If the register is accepted for a retrofit, the retrofit version is moved to the device structure. The
previous warehouse, installation, … dates are kept. The retrofit version is deleted automatically.
❑ On the synchronize, PMD sends back the device structure and the announces already saved for the
device