Trex WBFGATEDBLKIT Installation guide

Type
Installation guide

This manual is also suitable for

TREX SECLUSIONS DOUBLE
®
GATE INSTALLATION GUIDE
Seclusions 5x5 fence post
Seclusions fence gate panels (2)
Steel post stiffener (2)
Seclusions fence hinge (4)
Seclusions fence latch
Seclusions striker
Seclusions gate handle (2)
1-1/2” self-drilling screws (40)
1” self-drilling screws (16)
TOOLS NEEDED
SECLUSIONS DOUBLE GATE COMPONENTS
BEFORE YOU BEGIN
» Read all instructions before installation.
» Follow Trex Seclusions Installation Instructions to lay out fence and dig holes.
A
B
C
D
E
F
G
H
J
A.
C.
Slide a Steel Post Stiffener into each hinge post.
Open side of insert should face away from gate
opening.
Set posts into post holes that are 30” deep (or to
frost line) by 12” wide.
Opening (measuring from inside edge of post to
inside edge of post) for Trex Double Gate using
(2) large gate panels should be 130-1/2”. Inside
faces should be plumb and parallel.
A.
B.
C.
Note: Due to concrete cure times, set the gate posts
2-3 days before gate is installed.
Note: If Hinge Post is not connected to a fence panel,
it may be necessary to use a Heavy Steel Post
Stiffener or to fill the post with concrete for additional
strength.
Check for level.
130-1/2”
30”
12”
B.
Opening for double gate using two small panels
should be 91-1/2”. For custom size double gates
the opening is 2-3/4” larger than the combined
panel widths.


BACK SIDE OF B2
H
B1
B2
Active panel
Non-active panel
B2
B1
Seclusions drop rod assembly
K
STEP 1: SET THE GATE POSTS
2” self-drilling screws (6)
I
TREX SECLUSIONS DOUBLE
®
GATE INSTALLATION GUIDE
OPTIONAL ANTI-SAG CABLE KIT
ANTI-SAG CABLE KIT COMPONENTS
ATTACHING THE CABLE KIT
Black vinyl wrapped steel cable
Cable clamp (2)
‘S’ hook
‘D’ rings (2)
1” Self-drilling screws (2)
Turnbuckle
A
B
C
D
E
F
A
B
C
D E
F
Attach upper ‘D’ ring to the “hinge side” of the
panel, 5-1/2” down from top of gate and 1-3/4”
from the edge of gate (to hit the inner steel
frame), using (1) self-drilling screw.
Attach lower ‘D’ ring to the “latch side” of the
panel, 2” up from bottom of gate and 1-3/4” from
the edge of gate, using (1) self-drilling screw.
Lengthen the turnbuckle as long as possible
before proceeding by twisting the center ring.
Attach the turnbuckle to the upper “D” ring using
the “S” hook.
A.
B.
C.
HINGE SIDE LATCH SIDE
Loop one end of the cable through the lower eye
bolt of the turnbuckle. Attach a cable clamp and
tighten nuts as tight as possible.
Loop the other end of the cable through the lower
“D” ring and attach the other cable clamp. Pull
the cable as tight as possible before tightening
the nuts.
D.
E.
Remove any slack by tightening the turnbuckle,
twisting the center ring of the turnbuckle.
F.
Note: To make installation easier, prop the gate to the
desired level using a block of wood under the latch
side edge of the gate panel.
For large gate panels, it may be neccssary to use an anti-sag cable to eliminate the sag of a gate panel. Anti-sag cable
kits can be purchased through your local Trex Distributor.
©2013 TFSC
TREX SECLUSIONS DOUBLE
®
GATE INSTALLATION GUIDE
STEP 2: INSTALL THE GATE PANEL
A.
Note: Install hinges on the side of the gate that you want the gate to swing toward.
B.
C.
D.
E.
6”
A.
STEP 3: ATTACH THE LATCH AND HANDLES
B.
C.
D.
A.
Gate
swing
Catch
x4
x2
x4
Swing direction
6”
B.
C.
Repeat the process to hang the other gate panel.
Attach the hinges to the gate panel approximately 6” from
the top and bottom of the gate using a 3/8” nut driver and
the (4) 1-1/2” supplied self-drilling screws. Pre-drilling with
a 3/16” drill bit will make installation easier.
Place the gate panel in the opening. Adjust the gate to be
level and to the desired height by placing blocks under gate
panel. Allow ample clearance for full swing of gate.
Using (4) 1-1/2” supplied self-drilling screws, attach each
hinge to the steel inserted gate post. Pre-drilling with a
3/16” drill bit will ease installation.
Open the panel and attach the inside corner of the bracket
to the gate post.
A.
Attach the latch to the non-active panel approximately 36”
from the ground using (6) 1-1/2 supplied self-drilling
screws. The catch is to be placed in the direction of the gate
swing. The catch may face up or down depending on the
direction of gate swing.
Gate
swing
Catch
B.
Using the (4) 1-1/2” supplied self-drilling screws, attach the
striker to the active gate panel, lining the striker rod up with
the catch on the post latch.
C.
Attach gate handles to the active gate panel, using (2) 1”
supplied self-drilling screws. Handles should be attached
1-3/4 from the edge of the gate panel. The height must
be staggered front and back as shown.
F.
Adjust hinges using the method described in Step 5 to
create an even 7/8” gap between the panels and so the tops
of the panels are even.
Swing direction
TOOLS NEEDED
SECLUSIONS DOUBLE GATE COMPONENTS
STEP 4: MOUNT THE DROP ROD TO THE NON-ACTIVE PANEL
STEP 5: MAKE ANY FINAL ADJUSTMENTS TO THE GATE HINGES AS NEEDED
Attach the drop rod brackets to the back side of
the non-active gate panel. Reverse the drop rod
brackets depending on which side of the gate the
drop rod is to be mounted.
Measuring from the horizontal tab (see below),
attach the lower bracket 3” from the bottom of
the gate panel using (3) 2” self-drilling screws on
the inside edge of the gate panel and (1) 1”
self-drilling screw on the face of the gate panel.
Repeat this process for the upper bracket,
attaching it 14” from the bottom of the panel.
Attach the drop rod hanger 24” from the bottom
of the gate panel and 2” to the center of the
screw holes from the edge of the gate panel.
A.
B.
C.
Mark the location on the ground where the drop
hits. If your gate is over a concrete pad, drill an
8” deep hole using a 3/4” masonry bit for the
drop rod to slide into when the gate is closed.
For gates over dirt, dig a hole 8” wide x 18” deep
below the drop rod, fill it with concrete, and
insert an 8” long 3/4” pvc pipe in the concrete for
the drop rod to slide into after the concrete has
cured.
D.
A.
To adjust a sagging gate, or to shift panel in the opening, loosen the hinge nuts with an 11/16” wrench.
B.
Loosen or tighten the nuts in the direction shown below. Lift or push panel to slide the hinge.
C.
Retighten the hinge nuts.
A.
24”
14”
3”
B.
C.
2”
Top
Hinge
Bottom
Hinge
Shift panel left
Top
Hinge
Bottom
Hinge
Shift panel right
Top
Hinge
Bottom
Hinge
Raise latch side
Top
Hinge
Bottom
Hinge
Lower latch side
1-3/4”
TREX SECLUSIONS DOUBLE
®
GATE INSTALLATION GUIDE
D.
Due to weather and temperature changes, periodic hinge adjustment may be necessary to assure proper latch
connection.
©2013 TFSC
  • Page 1 1
  • Page 2 2

Trex WBFGATEDBLKIT Installation guide

Type
Installation guide
This manual is also suitable for

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI