Zeiss METROTOM Installation Instructions Manual

Type
Installation Instructions Manual
Technical Services Installation Instructions
METROTOM
Installation Instructions
Page
3
1. Operation of X-ray devices
1.1 German X-ray Ordinance (RöV), Information on radiation protection
The following information refers to the operation of X-ray devices in the Federal Republic of Germany. In other
countries, the locally applicable regulations must be observed by the operator.
The METROTOM system fulfills the conditions of Annex 2, Item 3 of the RöV (X-ray Law); it thus complies with
the properties of a fully protected device.
Operation of the METROTOM must be approved in compliance with § 3 of the RöV.
In order to obtain an operating permit, the operator must do the following:
Have the METROTOM inspected by an authorized independent expert for technical inspections of X-ray systems.
Authorize a (local) radiation protection officer.
Submit an application for a permit to operate the system to the supervisory authority far enough in advance of the
beginning of operation. The components of the permit application include the result of the inspection performed by
the above expert, the personal data of the radiation protection officer, proof of his technical qualification and autho-
rization, etc.) as well as detailed information on the radiation protection organization.
The supervisory authority can stipulate further conditions which must be fulfilled as a prerequisite for the notice of ap-
proval.
According to § 18 of the RöV, the METROTOM must be inspected by an authorized expert after 5 years of operation at
the latest (recurring inspections).
The responsible supervisory authority of the relevant state is usually the Trade Supervisory Authority, the Occupational
Health and Safety Administration or the Regional Board.
United states
The system conforms to 21 CFR 1020.40
Typically, an x-ray system must be registered with the appropriate state agency. This registration must occur prior to the
x-ray system being placed into service. Regulations may require initial and periodic inspections by a government agency
or a qualified vendor. In addition, the regulations may require the implementation of standardized operating procedures,
specialized training and posting of radiation exposure warnings and other special notices. Radiation safety requirements
differ significantly from one jurisdiction to another. It is the users' responsibility to ensure that the x-ray system is installed
and operated in compliance with all applicable governmental regulations. Failure to comply may result in substantial pen-
alties.
Other countries
In other countries, the national regulations regarding x-ray protection must be observed.
It is advisable to report a planned installation to the supervisory authority in due time, i.e. 2 to 3 weeks in ad-
vance.
Note:
Note:
Installation Instructions
Page
4
2. Selection of installation site and conditions
When selecting the installation site, make sure that the conditions specified below either already have been met or are
subsequently initiated by you.
The system includes the following components:
1. METROTOM
Full protection enclosure
Positioning unit
Flat bed detector
Microfocus X-ray tube
Rotary table
2. Controller
3. Data station (peripheral devices)
2.1 Required room height
This dimension is the sum of the height of the METROTOM and the minimum clearance below the ceiling.
Example:
2.2 Required floor space
A cut-out floor plan is attached to help you gain a quick overview of your floor space requirements. When drawing up
the overall plan, please make sure that your METROTOM is accessible from all sides.
Select the installation site so that the METROTOM is located at least 700 mm away from the wall.
2.3 Transport paths
Check the floor and ceiling loading capacity of all transport paths leading to the installation site. The doorways and trans-
port paths must be at least 10 cm wider and higher than the METROTOM assemblies to be transported, including the
transport vehicle. The dimensions and weights of the METROTOM assemblies are specified in this text.
2.4 Ambient conditions
MetroTomography
®
systems are high-tech products. Their specified precision and quality can be attained only if the fol-
lowing conditions are met.
Permissible storage temperature range
5°C to 40°C
Pay special attention to the storage temperature during the winter. Storage at temperatures below 5
o
C must be avoided.
Ambient temperatures required for operational readiness
Permissible ambient temperature: +15°C to +35°C
Permissible air humidity:
40% - 70% without condensation
Air humidity values outside of the permissible range require an additional air conditioning unit.
Height of METROTOM .................................................................................. 2150 mm
Minimum clearance below ceiling................................................................... 800 mm
Required minimum room height above floor or foundation ................. 2950 mm
Note:
Installation Instructions
Page
5
Temperature conditions required to operate the METROTOM:
The measuring uncertainty specified for the METRONOM is guaranteed under the following conditions:
1. The measuring data correction program is used and the workpiece and METROTOM temperatures are entered along
with the temperature expansion coefficient of the workpiece material.
Compliance with the following temperature conditions:
Please make sure that sufficient illumination is present.
The use of heat sources near the METROTOM must be avoided.
2.5 General protective measures
The machine must be protected against direct contact with dirt and grime (e.g. casting sand, metal filings, oil, coolants,
lubricants and soot. Such deposits result in higher costs for cleaning and care and may cause malfunction of and/or dam-
age to the CT scanner.
Particle concentrations which can result in deposits on guideways and/or measuring systems must not exceed a value of
5mg/dm
3
per week.
CT scanner type Temp. range (ºC)
Temperature gradient
per hour (ºK/h) per day (ºK/d) spatial (ºK/m)
METROTOM 20 ± 2 1,0 2,0 1,0
Installation Instructions
Page
6
2.6 Vibrations at the installation site
The permissible floor vibrations are illustrated in the following diagram(s).
Vibrations are often caused by heavy-duty machine tools, conveying equipment (crane or forklift), stamping and forging
machines located in adjacent rooms.
A measurement is required to assess the magnitude of the floor vibrations. If you would like to have this service performed
for you, contact Carl Zeiss in Oberkochen.
In any case, the measured result must be made available.
2.7 Floor loading capacity
We recommend that you consult a structural engineer for your statical calculations and any required floor reinforcements
(foundation etc.). The floor load exerted by the machine is specified in this brochure (Page 13).
10
1
0 1020304050
100
1000
X axis, horizontal
Y axis, horizontal
Z axis, vertical
Frequency [Hz]
Acceleration [mm/ss]
Permissible Foundation Acceleration
Acceleration values above the curve require an additional
foundation
Installation Instructions
Page
7
3. Preparations for installation / Electric power supply
Please make sure that the following preparations are made by the date of installation:
3.1 Preparation of required floor space
The floor space must be clean.
Maximum difference in level of the 4 seating surfaces:
4 mm
Maximum slope per contact surface: 1 mm/m
3.2 Electric power supply
We recommend connecting the system to an electric power line which is not used to supply any peak load equipment
(elevators, air conditioners, etc.). To prevent negative influences, avoid installing the CT scanner near:
systems with a high power consumption: (e.g. welding machines) and
systems that emit strong perturbing radiation: (e.g. electrical discharge machines).
The use of mobile telephones or walkie talkies within a radius of
3m around the machine also must be prohibited. If
properly enforced, these measures will help prevent malfunctions, especially in connection with the electronic data
processing systems.
A 5-pin CEE-form plug connection or an equivalent national plug or permanent connection is provided for the system (16
A). This connection must be protected with an automatic cutout. Alternatively, you can also use other protective devices
with an equivalent rating. It is recommended to install a lightning current arrester, e.g. Phoenix Flashtrab FLT 25-400, as
a coarse protection against overvoltages.
We recommend making the connection according to the following connection diagram, however, also would like to point
out that the pertaining national laws and regulations must be observed.
3.3 Electric power supply parameters
In order to ensure trouble-free data communication between the METROTOM and the data station, the power supply
should have the following parameters.
Line voltage
Controller:
3/N/PE 400/230VAC (±10%)
for the USA: 3/PE 208VAC ±10 % 50/60 Hz
for Japan: 3/PE 200VAC ±10 % 50/60 Hz
Data station:
1/N/PE 230 V (± 10%) or the relevant national voltage
for the USA: 1/N/PE 120 VAC
for Japan: 1/N/PE 100 VAC
L1
L2
L3
N
PE
X4101
-W4100
L1
N
PE
L2
L3
Main switch
Cable: 5 x 2.5 mm
2
length 10 m
Connection of BCC control cabinet
Recommended:
Ground fault
circuit
Automatic cutout
C16 A
Customer installation
Permanent connection of national voltage
(recommendattion)
included in scope of supply
interrupter
Control cabinet
5-pin CEE outlet
30 mA
Installation Instructions
Page
8
Fuse protection of line voltage
For 3/N/PE 400/230V line voltage:
METROTOM with controller: Automatic cutout, 3-pole, C16A
Data station: Automatic cutout, 1-pole C16A
For 3/PE 200 or 208V line voltage:
METROTOM with controller: Automatic cutout, 3-pole, 15A
Data station: Automatic cutout, 1-pole 15A
Power consumption
METROTOM with controller: max. 3000VA
Data station: max. 2000VA
3.4 EMC
EN 61326 Appendix A, Class A
Warning !
This is a class A device, and may therefore cause radio interference in the surrounding area. In such cases, the operator
may be required to take appropriate action and bear any costs thus incurred.
3.5 Installing the Connecting Cables
The cables can be protected by installing them in an electric raceway included in delivery. This raceway can accommodate
all cables and must be fastened to the floor. Or, as an alternative, the cables may also be installed in an underfloor cable
duct.
3.6 Stabilization of the power supply
If brief fluctuations occur in the root mean square value of the line voltage, a line voltage analysis must be performed.
Contact us if you require this service. We will be glad to advise you and recommend suitable measures. A separate stub
cable from the main distributing frame to the connecting point of METROTOM is sufficient in most cases.
3.7 Machine parameters
Overvoltage category: ΙΙΙ
Pollution degree: 2
Protection class: 1
3.8 Teleservice
You will require an Internet connection for Teleservice. For more details, please refer to the "Teleservice" brochure.
3.9 Network topology
The networking of the system components is performed by the ZEISS service engineer according to the valid specifications
during initial startup. These settings must not be modified by the customer. Any change could result in connection prob-
lems.
3.10 Computer operating system
If the required computers are provided by the customer, the operating system used must not show any limitations in com-
parison to the one used by ZEISS. Otherwise problems and additional costs may occur during startup.
Installation Instructions
Page
9
3.11 Compressed air supply
Please make sure that the compressed air supply required to operate the METROTOM is provided as follows:
Minimum pressure 6 bar, maximum pressure 10 bar.
Precleaned air; free of dirt particles, water residues and oil vapors.
Air quality according to ISO 8573 Part 1 Classification 4 including:
Sect. 6.1: Max. particle size 15 µm, max. dirt particle concentration 8 mg/m
3
Sect. 6.2: Max. dew point of compressed air = +3° C
Sect. 6.3: Max. oil concentration of 5 mg/m
3
If the above air quality is not attained, an additional air filtration unit and, if necessary, a membrane dryer must be con-
nected upstream. These units can be ordered from CZ; ask your contact man.
If the required air quality is not attained, this could cause damage not covered by the warranty.
Air consumption (rotary table):
Max. 15 l/min at 5bar (75 normal liters/min at 1 bar).
Connection point for compressed air
Our service engineer requires a connection point to connect the METROTOM to the compressed air supply. You should
provide this connection point as shown in the brochure. The machine-side connection (9x2.5) is provided for compressed
air hoses with an internal diameter of 9 mm. The air supply line from your connection to the connection point of the
METROTOM will be laid during installation.
If you do lay the air hose up to the machine, please make sure that the connection point is accessible. The air hose must
be laid in such a way that it is protected.
3.12 Unloading/Transport vehicles
The unloading and transport of packaged units may be performed only with hoisting rings or pallets; the insulated pa-
kkaging must not be damaged in the process. Please ensure that suitable transport vehicles operated by qualified
personnel are provided for unloading the crates and transporting them to their storage site. The type of transport vehicle
used depends on local conditions. The load carrying capacity of the transport vehicles is specified on the following pages.
Suitable transport vehicles include e.g.:
forklifts mobile cranes gantry cranes
Keep all transport paths free during installation to ensure a smooth workflow. Always remember that the CMM is a valu-
able, precision instrument and that jolting the crates or setting them down hard therefore must be avoided.
Transport locks, lashing straps, shipping crates and pallets must be returned.
Since packaging materials such as e.g. plastic foils or styrofoam chips are recycled by Zeiss, they can be returned
along with the transport locks if they are clean and no dirt or debris is mixed in with them.
3.13 Storage/Unpacking
If the outside temperature is <0°C, the machine assemblies are shrink-wrapped in aluminum-coated foil instead of a pro-
tective PVC wrapping, with a desiccating agent added (insulated packaging).
Please store the packed unit in a covered location as close as possible to the installation site.
Preliminary temperature adjustment:
Transport the assemblies no less than two days before our system specialist is due to arrive to a storage site with an am-
bient temperature of 15° C. The assemblies may be unpacked and the insulated packaging removed only by our sys-
tem specialist! Please provide an appropriate location for the empties.
Note:
Note:
Installation Instructions
Page
10
3.14 Moving the METROTOM to another location
To prevent damage to the machine, our system specialists should be consulted before it is moved to
another location.
Installation Instructions
Page
11
4. Transport crates
Note on transport crates:
The METROTOM is delivered on transport pallets wrapped in insulated packaging. It is delivered in a transport crate only
when shipped by air cargo or overseas.
No.
Shipping crate
or pallet for
Dimensions in mm (maximum)
m
3
Tare weight (kg) Max. gross weight (kg)
L W H
Height of secured
unit (max.)
Sea/air
crate
Truck
pallet
with sea/air
crate
with pallet
f. road
1 Pallet for CT base assembly 3320 2270 460 2600 3,5 - 410 - 4910
2 Pallet for CT cover 3320 2400 430 2600 3,5 415 - 3915
3 Control cabinet on European pallet: approx. 350 kg
4 Computer and accessories in Palbox (large)
Data are not available for the transport crates
Note: All values not entered are not currently available. For production reasons, the dimensions (L, W and H) of the transport crates may deviate by
as much as +50 mm.
L
W
H
1
2
L
W
H
Installation Instructions
Page
12
1940 2200
4140
min. 700
1700
2200
2675
425
140
1830
2223
A
3100
A*
=
Contact surfaces of machine jacks for fine adjustment of level.
Material: Elastomer
Supporting surface: 110 mm diam.
*Average pressure placed on contact surfaces: 212 N/cm
2
calculated from the net weight of the METROTOM and the max.
permissible workpiece weight distributed over the base of the machine
jacks of 95 cm
2
per jack.
Maximum difference in level of the 4 contact surfaces in
relation to each other: 4 mm.
Maximum inclination per contact surface: 1 mm/m
c
=
Path along which the rollers of the cover run.
d = Free space required for maintenance
.
e = Free space required for initial installation of the METROTOM (see
also illustration above)
Note:
5. Space requirement for initial installation and maintenance
Base assembly
approx. 4500 kg
Cover
approx. 3500 kg
Space requirement depends on size of vehicle
e.g. forklift, lift truck....
Installation Instructions
Page
13
METROTOM
2150
2205
3100
2223600
min. 800
➍➎
min. 700
min. 700
min. 700
850
600
min. 700
c
=
The power connection and grounding terminal must be installed by the customer.
d =
The connecting point for the precleaned compressed air supply (6-10 bar) must be installed
by the customer.
e = Teleservice
f = Cable entry on control cabinet
g = Compressed air supply on METROTOM (air hose entry from below, optionally from above)
h = Computer station with 2x PC with monitor, keyboard and mouse
i = Network connection
n = Min. amount of free space required for maintenance. Recommended: 1350 mm
o =The shaded area must be accessible for servicing so that bulky and heavy components can
be removed and installed if necessary. Transport to the left or right also must be possible.
p = Cable: METROTOM - control cabinet approx. 5 m (cable entry from below)
q = Cable: control cabinet - computer station approx. 13 m (cable entry from below)
r = Cable: METROTOM - computer station approx. 20 m
s = Cable: Network - control cabinet approx. 10 m (cable entry from below)
The computer station and control cabinet can also be installed in a separate room.
Note:
6. METROTOM installation dimensions and sample installation layout
3-wire outlet for
data station
(national voltage)
Power connection for
control cabinet
Net wt. of
METROTOM
Max. allowed
workpiece wt.
Control cabinet
approx.
ca. 8000 kg 50 kg 350 kg
Installation Instructions
Page
14
7. Fastening holes on rotary table
M8 fastening hole
Pos. No.
Radius
“R“
Angle
α
M8 fastening hole
Pos. No.
Radius
“R“
Angle
α
1.1
55 mm
60
o
4.1
90 mm
60
o
1.2 180
o
4.2 180
o
1.3 300
o
4.3 300
o
2.1
60 mm
0
o
5.1
107.5 mm
0
o
2.2 120
o
5.2 120
o
2.3 240
o
5.3 240
o
3.1
72.5 mm
0
o
6.1
125 mm
60
o
3.2 120
o
6.2 180
o
3.3 240
o
6.3 300
o
α
0
R
5.1
3.1
2.1
2.3
2.2
3.3
5.3
3.2
5.2
6.1
4.1
1.1
1.2
4.2
6.2
6.3
4.3
1.3
Ø 300
Carl Zeiss 73446 Oberkochen
600061-1118.020 Printed in Germany I-SD / 06.08
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16