It is always recommended to anchor the unit in to the ground. Drill
through the four holes in the base of the unit using 6mm dia masonry drill
to a depth of 70mm. Screw in the anchor fixings. (These have a self
cutting thread). If not anchoring the unit, fit the self seal plugs BEFORE
BUILDING to block the fixing holes from underneath.
TOOLS REQUIRED
Power driver POSI-DRIV screwdriver, 6mm dia. masonry drill and a
10mm socket or spanner.
ACCESS E PLUS
ZSCREW32 x4
ZSCREW381 x12
ZSCREW100 x62
ZSCREW340 x12
41843 x1 /41844 x1
ZHWMISC89 x2
ZHWHANDLE32 x1
ZSCREW42 x4
45767 x4
41824 x2
41459 x4
6mm
Dia.
Posi-Driv
Screwdriver
10mm
Spanner
18V
ZCOMPPLZS02 x4
ZCOMPPLAS22-23-24 x12
4x 2mm, 4x 3mm, 4x 5mm
BASE PANEL 51838 x1
LH BACK PANEL 51842 x1
RH BACK PANEL 51841 x1
RH SIDE PANEL 057631 x1
LH SIDE PANEL 057630 x1
LH FRONT PANEL 41452 x1
RH FRONT PANEL 41453 x1
RH DOOR S/A 51846 x1
LH DOOR S/A 51844 x1
LID S/A 51836 x1
BASE INSTRUCTIONS
Flat and firm base. Recommended: concrete, tarmac or paving flags.
Min. distance from walls/ shrubbery: 1000mm.
Min. base size (WxDxH) 2450mm x 1150mm x 50mm.
LEVELING THE UNIT
Correctly level the constructed unit using the shims (ZCOMPPLAS)
provided prior to fixing the unit to the ground. Slide the packing pieces
under the corners of the unit base as required until an equal gap has
been achieved around the door allowing for its smooth operation and
alignment.
For maintenance instructions of this product visit www.asgardsss.co.uk
x2
Warning: some panels may weigh over
20Kg. Beware of manual handling
ZHWNUT41 x12
ZSCREW43 x10
2x 70mm disc padlocks
required. Not supplied.
Keys alike recommended.