Hanover HANGAZCN10X10-GRY Installation guide

Type
Installation guide

This manual is also suitable for

polycarbonate panels.
Do not tighten the steps in the Aluminum Pavilion until completing on the assembly of the
You must read these instructions carefully before you start to assemble this pavillon.Please ensure that you find all parts
9820401-1
size/cm:297L×297W×196/252H
size/inch:117L×117W×77/99H
Aluminum Pavilion
Instruction manual
IMPORTANT
in the carton box in the correct type and quantity as mentioned in the list illustrated in every page accordingly.
Please carry out the steps in the order set out in these instructions.
Keep these instructions in a safe place for future reference.
9820401-2
with cold clean water.
Aluminum Pavilion needs cleaning, use a mild detergent solution and rinse
Note that the door is hinged on the right hand side and therefore opens to the right space needed.
This is a multi-part assembly, Allow at least 3.5 hours for assembly.
Hot items such as recently used grills, blowtorches etc.must not be stored in the Wall shed.
Keep children away from the assembly area.
5.Electric screwdriver+5mm Hexagon
2.Spanner 10mm/(25/64) (Ratchet Wrench is better)
1.Triangle Stairs≈
9.Percussion bit(10mm)9.Percussion bit(10mm)(25/64)
!
SAFETY ADVICE
We strongly recommend the use of work gloves during assembly.
Do not attempt to assemble the Aluminum Pavilion in windy or wet conditions,
Do not touch overhead power cables with the aluminum profiles.
Always wear shoes and safety goggles when working with extruded aluminum.
The Aluminum Pavilion must be positioned and fixed on a flat level surface.
Do not lean against or push the Aluminum Pavilion during construction.
Do not position your Aluminum Pavilion in an area exposed to excessive wind.
Do not attempt to assemble this Aluminum Pavilion if you are tired ,have taken drugs or
alcohol or if you are prone to dizzy spells.
If using a step ladder or power tools ensure that you follow the manufactures safety advice.
Ensure there are no hidden pipes or cables in the ground before inserting the pegs.
GENERAL ADVICE
Selecting a site-choose a sunny level position away from overhanging trees.
If you are fixing your Aluminum Pavilion directly to a solid concrete foundation use the
pre drilled holes in the metal base supplied.
The component parts should be checked and laid out close at hand.
Keep all small parts(screws etc)in a bowl so they do not get lost.
Keep roof clear of snow and leaves.
CARE & MAINTENANCE
When your
Do NOT use acetone, abrasive cleaners or other special detergents to clean the
clear panels.
TOOLS & EQUIPMENT REQUIRED
Protective Equipment:
1.Helmet
2.Glove
3.Long Sleeve Cotton Overalls
4.Emergency Medicine Cabinet
5.Eye Shield
2.Angle Square
3.Level Meter
-2-
3.Spanner 14mm/(35/64) (Install the expansion screw)
4.Hexagon wrench 5mm(13/64)inch
wrench (suggest)
6.Wooden Mallet
7.Marking Pen
10.Knife
11.Phillips screwdriver
4.9 Feet Height
(13/64)inch
(16.4Feet)
Installation Tool:
Dispose of all plastic bags safely and keep them out of reach of children.
1.Tape Measure
Measurement Tools:
be caused from screws facing into month.
screws that might hurt your eyes, and avoid suffocation that may
5.Avoid looking up while working high up and avoid dropping
4. Wear long sleeve cotton overalls,gloves and helmet during
of them and pay high attention to electric safety.
9820401-2
9820401-1
7.If injuries occur, please take immediate action to
196cm / 77inch
297cm / 117inch
OTHER CAUTIONS
PRODUCT SIZE
-3-
!
OTHER CAUTIONS
1. 4-5 people required, one is for measuring & taking marks to
ensure the installation dimension ,the second person is
responsible for the installation and the last one do as assistant
and assure the safety.
2. High-power electric tools are required, ensure the normal work
3. Be careful when using the kind of blunt tools, like hammer.
installation and wear safety glasses when using power tools .
6. No climbing, No standing on the tent to avoid falling down.
297cm / 117inch
256cm / 100.8inch
256cm / 100.8inch
200cm / 78.7inch
252cm / 99.2inch
locate and use a first-aid kit. In case of emergency,
please go to the nearest emergency room.
Make sure to install at the right location
/ 59"
1497mm
/ 100"
/ 29.4"
/ 27.8"
/ 76.7"
/ 31.7"
/ 56"
/ 104.7"
/ 76.7"
T4.8(3/16)
PARTS LIST
SKELETON
NO.
1 4
Qty.
2 4
1950mm
1950mm
10 8
SCREW
11 8
2660mm
1423mm
806mm
5 4
8L 4
8R 4
6 4
12 4
CONNECT
B1 1
B2 1
B3 1
B5 4
B6 4
B8 8
B9 4
B10 12
B11 4
B12 4
SUMMARY STATEMENT FOR POLYCARBONATE PANEL
OTHER
P1L
P1R
P3L
P3R
x4
x4
x4
x4
F1 48
F2 76
F3 12
F4 8
F5 32
B15 12
S6 112
S8 12
比例
25.400
比例 25.400
比例
25.400
比例 25.400
比例 25.400
比例
25.400
比例 25.400
比例
25.400
2548mm
706mm
748mm
B13 8
F6 2
S9 48
M6(15/64)
M8(5/16)
T5(13/64)
M4(5/32)
M6(15/64)
M6(15/64)
806mm
/ 31.7"
Schematic diagram of connections
Schematic diagram of frames
-5-
B9
B9
6
8L
8R
1
1
1
1
2
2
2
2
5
5
5
5
8L
8R
8L
8R
8R
8L
8R
8L
6
6
6
6
10
10
10
10
10
10
10
10
11
11
11
11
11
11
11
11
12
12
12
B2
B1
B3
B5
B5
B5
B5
B6
B6
B6
B6
B8
B8
B8
B8
B8
B8
B8
B8
B9
B9
B9
B9
B10
B10
B10
B10
B10
B10
B10
B10
B10
B10
B10
B10
B13
B13
B13
B13
B12
B12
B12
B12
B15
B15
B15
B15
10
10
B11
B11
B11
B11
B11
B5
B8
B8
1
2
2
B2
B1
B3
B9
B9
B9
B9
6
6
6
6
5
5
5
5
B8
B8
2
2
12
12
B6
6
B13
1
B12
B15
1
Face the white film side of panels towards the sun as they are UV-protected.
"hexagonal screw" installation
Place the "hexagonal screw"into the groove,turn clockwise
until it stops turning.
Adjust the "hexagonal screw"by hand and twist so threads fix
it in place.
Place other parts on "screw"and assemble nut .
SUMMARY STATEMENT FOR POLYCARBONATE PANEL
UV
-6-
-7-
x4
x4
F2 x28
1 x4
B5 x4
B12 x4
F2
F2
B5
1
F2
F2
x4
x4
B12
F2
F2
F2
1
12 x4
B13 x8
-8-
F5 x 16
S6 x112
2
12
F5
F5
F5
F5
B13
B13
x4
x8
S6 x14
S6 x14
12
12
B13
F5
12
F5
B13
2
F5x4
12
2
2 x4
x4
2
B8 x8
F2 x32
x4
B8
B8
2
2
1
1
B5
B5
B8
B8
2
2
x2
F2
F2
B8
x4
B8
F2
F2
2
2
x2
1
1
B8
B8
x2
x2
x2
x2
B5
F2
F2
2
1
-9-
Connection among columns,
beams and studdles.
Don't completely tighten all screws.
F2 x8
x2
x2
F2
F2
B5
B5
2
2
F2
F2
1
1
B8
B8
B8
B8
B8
B8
B5
B5
B5
B5
-10-
Make sure the columns are vertical
to the ground,and beams are horizotal.
Tighten all screws by diagonals.
F2 x8
F1 x8
B6 x4
1
B8
B8
B8
B8
B8
B8
F2
F2
F2
F2
x4
B6
B6
B6
B6
x4
2
2
1
B6
-11-
Do not tighten F1.
Preparation: Reserve F1 Screws before installing the roof.
!
B1
F1 x4
F1
F1
F1
F1
F1
B1
-12-
Skeleton Assembly.
5 x4
6 x4
F4 x8
6
6
6
6
5
5
5
5
B1
6
B1
F4
F1
F1
6
F4
B1
F4 and F1 need tighten
!
x4
x4
F4
5
B1
-13-
Do not tighten F1
Roof stators installation
F1 x20
B9 x4
6
6
6
6
5
5
5
5
B9
B9
B9
B9
B1
x4
B9
F1
F1
F1
!
x4
F1
6
F1
-14-
F1
5
B9
x4
5
B9
F1
761mm
!
761mm
!
761mm
!
761mm±3
!
5
B9
F1
B9
B9
6
6
B9
B9
x4
F1
F1 need tighten
!
30inch
30inch
30inch
30inch
30inch±0.1
B2
B3
-15-
F6 x2
B1
B2
B2
B1
F6
F6
F6
F6
B3
B3
B2
B1
Roof cap installation
-16-
Roof Installation
Team Work Required (2 or 3 persons)
!
180°
-17-
F1 x8
F1
F1
F1
F1
F1
F1
F1
F1
x4
5
5
5
5
6
6
6
6
5
F1
x4
F1
6
B6
126±3mm
5
B5
F1 need tighten
!
6
154±3mm
F1 need tighten
!
!
!
4.96±0.1inch
6±0.1inch
Make sure the measurements
below are in tolerances.
-18-
8L x4
8R x4
8L
8R
8R
8L
8R
8L
8L
8R
F1 x8
x4
2
2
12
12
F1
F1
2
2
F1
F1
!
8L
12
2
2
12
8R
x4
2
2
8L
8R
F1
B9
B9
B9
B9
F1
F1
B9
B9
x4
F1 need tighten
!
8L
8R
6
B9
B9
Studdles Installation
Do not tighten F1.
-19-
P1L
P1R
P3L
P3R
x4
x4
x4
x4
!
PC Panels Installation
Face the UV surface of the panels towards the sun
PC Panels Holders and Plastic end caps installation
-20-
10 x8
11 x8
B10 x12 B11 x4
10
10
10
10
10
10
10
10
11
11
11
11
11
11
11
11
B10
B10
B10
B10
B10
B10
B10
B10
B10
B10
B10
B10
B11
B11
B11
B11
x4
x8
x4
B10
10
10
5
5
F5 x 16
B10
10
11
8R
8L
8R
6
6
6
11
11
B11
F5
F5
F5
x4
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16
  • Page 17 17
  • Page 18 18
  • Page 19 19
  • Page 20 20
  • Page 21 21
  • Page 22 22

Hanover HANGAZCN10X10-GRY Installation guide

Type
Installation guide
This manual is also suitable for

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI