FSR TB-2G-BLK Owner's manual

  • Hello! I've reviewed the installation instructions for the FSR TB-2G Table Box. This document outlines the steps for cutting the table opening, installing the mounting brackets, and connecting electrical components, ensuring proper cable routing. I'm ready to assist with any questions you may have about the device or its installation.
  • What is the maximum table thickness for installation?
    What size hole needs to be cut in the table?
    What should the customer provide for the screw end?
FSR
244 Bergen Boulevard, Woodland Park, NJ 07424, Phone: 973.785.4347 - Fax: 973.785.4207
43337 LIT1624A
TB-2G Installation Instructions
1. 2-1/2 MAX TABLE THICKNESS. DETERMINE LOCATION
AND CUT 7-1/4 x 8-3/16 HOLE WITH 3/8 MIN - 5/8 MAX
RADIUS CORNERS IN TABLE TOP.
2. DROP TB-2G INTO HOLE IN TABLE. INSTALL MOUNTING
BRACKETS TO ASSEMBLY AND SECURE TO TABLE BY
TIGHTENING MOUNTING SCREWS TO UNDERSIDE OF TABLE.
PANEL
DIRECTION
3/8 MIN - 5/8 MAX R.
TB-2G ASSEMBLY
7-1/4
MOUNTING BRACKET
AND MOUNTING
SCREW INSTALLED
CUSTOMER TO PROVIDE
KO SLUG/PENNY/OTHER
HARD FLAT PIECE FOR
SCREW END, WITH SOFT
TABLE WOOD
MOUNTING BRACKET
AND MOUNTING SCREW
(SEE BELOW)
(2) MOUNTING
BRACKET
(2) MOUNTING
SCREW
5 MOUNTING BRACKET
POSITIONS TO ACCOMMODATE
VARIOUS TABLE THICKNESSES
1
2
BRACKET MOVEMENT,
TO INSTALL BETWEEN
NOTCHED RAILS
2
1
3. INSTALL ELECTRONIC COMPONENTS AND MAKE ELECTRICAL
CONNECTIONS AS REQUIRED. BEFORE TIGHTENING CABLE-TIES,
ENSURE THE ROUTING OF CABLES/WIRES DOES NOT INTERFERE
WITH THE LATCH, OR CREATE ANY EXTRA LOAD ON THE GAS
SPRING, OR LIMIT TRAVEL.
2-GANG OPENING
TIE-WRAP POINT
EXAMPLE
CABLE PATH
(OR MIRROR IMAGE)
TIE-WRAP POINT
TIE-WRAP POINT
/