3-Piece Aluminum Arm Kits

DKS 3-Piece Aluminum Arm Kits User manual

  • Hello! I am an AI chatbot trained to assist you with the DKS 3-Piece Aluminum Arm Kits User manual. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
  • What models are these kits designed for?
    How many pieces are included in each kit?
    What are the different arm lengths available?
    How do I mount the hubs on the operator?
    When should I install the counterweight mounting plates?
    What is the purpose of the wishbone steel cables?
    How do I adjust the cables to make the arms level?
    Is there a special steel cable for the End of Arm Assembly?
1
1602-149-F-5-21
Lockwasher 3/8”
Washer 3/8”
Hub
Horizontal Arm Direction
Counterweight
Mounting
Plate Holes
Hex Bolt 1/2” x 1”-3/4” Tap
Locking Plate Washer
Phillips Screw 10-32 x 1/2”
Hub
Vertical Arm Direction
Mount hubs on
operator FIRST.
Test hubs UP and
DOWN positions
BEFORE installing
counterweight
mounting plates,
then assemble arms,
cables and wire
harness on LED
models.
Lighted Arms ONLY Note:
See page 3 for correct
arm positions and wiring.
Clip around counterweights
before srewing cover on.
Counterweight
Mounting Plate
See
next
page
Hex Nut 3/8”
Hex Bolt 3/8” x 1”
Counterweight Mounting Plate
Hardware x 4
Counterweight
Mounting Plate
Hardware x 4
Washer 3/8”
Support arms during assembly until all cables
have been installed and adjusted for level.
DoorKing Part Numbers:
1602-162
20 ft Arm
1602-164
24 ft Arm
1602-166
27 ft Arm
1602-172
20 ft LED Arm
1602-174
24 ft LED Arm
1602-176
27 ft LED Arm
Washer 3/8”
Nylon Washer
Hex Head Screw
Cotter Pin
14 ft cable (See page 3)
UHMW Shear Pin
3/8” Washer
& Cotter Pin
3-PIECE ROUND ALUMINUM ARM KITS
These kits are designed ONLY for the 1602 model barrier gate operator with or without LED lights.
Copyright 2019 DoorKing
®
, Inc. All rights reserved.
120 S. Glasgow Avenue
Inglewood, California 90301 U.S.A.
Test hub UP and DOWN position
before installing arms.
2
1602-149-F-5-21
Wishbone Steel Cables Note:
These 2 steel cables are used
on ALL arm assemblies.
The End of Arm Assembly steel cable is ONLY used on the 27 ft arm.
The 20 ft and 24 ft arms DO NOT use this steel cable.
Adjust ALL cables
with turnbuckles to
make the arms level.
Wishbone Hardware Assembly
End of Arm
Washer 3/8”
Hex Bolt 3/8” x 4” and Washer 3/8”
Washer 3/8”
Lockwasher 3/8”
Hex Nut 3/8”
Turnbuckle Eye
Bolt and Nut
Turnbuckle
Thimble
Eye
Thimble
Eye
Cable
Clamp
Cable
Clamp
UHMW Shear Pin
3/8” Washer & Cotter Pin
Washer 3/8”
Washer 3/8”
Eye Bolt 3/8” x 4”
Lockwasher 3/8”
Hex Nut 3/8”
Cotter Pin
Stainless Steel
Cable on 27 ft
models ONLY
Wishbone Stainless Steel Cables
14 ft Arm
14 ft Arm
Washer 3/8”
Eye Bolt 3/8” x 4”
Washer 3/8”
Thimble
Eye
Cable
Clamp
Stainless Steel Cable
Stainless Steel Cable
Lockwasher 3/8”
Hex Nut 3/8”
Plastic
End Cap
Hex Nut 3/8”
Washer 3/8”
Hex Bolt 3/8” x 1”
Hex Bolts 3/8” x 1”
Turnbuckle
Cable
Clamp
Thimble
Eye
Lockwasher 3/8”
Hex Nuts 3/8”
Lockwashers 3/8”
Support arms during assembly until all cables
have been installed and adjusted for level.
Mount Power Supply
Drill Hole Positions
Drill holes in positions shown to mount
power supply to side of electronic box.
Mount Power Supply
115V
NEU
SUPPLY
GROUND
115V
HOT
UP
DOWN
AUTO
AC POWER
DC POWER
ON
OFF
ON
OFF
1413
121110987654
321
Side of
Electronic Box
Terminal
Install this
screw FIRST.
Install this screw
SECOND.
1.3”
Side of
Electronic Box
.75”
2.5”
Drill .213” Holes
Power Supply
Mounting Position
Power Supply
Mounting Plate
Power Supply
REVERSE
SENSITIVITY
TIME
DELAY
POWER
1
ON
2 3 4 5 6 7 81
ON
2 3 4 5 6 7 8
NC
UP
LOOP
DOWN
LOOP
1234567891011121314
SW 1
SW 2
NONCC
115V
NEU
SUPPLY
GROUND
115V
HOT
UP
DOWN
AUTO
AC POWER
DC POWER
ON
OFF
ON
OFF
TIME
T
Power Supply
Front of Electronic Box
IMPORTANT: Power supply MUST be
wired BEFORE mounting it as shown.
/