Horizontal installation
ON FRAMING OR FURRING STRIP BOARDS OR DIRECTLY ON WALL
- Start with the pieces on the ends,
checking the plumb with a level. The
intermediate pieces should be aligned.
Adjust with spacers if needed. It is
very important for the pieces to be
firmly supported.
- Attach them with 8 mm plastic dowels
and 5 x 60 mm (# 10 x 2 1/2”) screws.
Space clips no more than 40 cm apart
• Installation on framing or furring strip
boards
- Install from left to right and from the
bottom up, leaving a 1 cm separation
between the edge of the paneling and
the floor, adjoining walls and ceiling.
- With longitudinal joints, the ends of
the pieces must be attached to furring
or framing.
- To place the first row, mark out a
horizontal plumb line.
- Apply a strip of adhesive on the framing
and on the back of the panel. Hold the
panel against the wall and secure it
with 25 mm brad nails applied with a
pneumatic nailer, or with 3.5 x 25 mm
wood screws applied with a cordless
drill driver.
- Adjust the width of the final run.
trimming it down with a circular saw.
• Installation directly on wall
- In this case, apply a strip of adhesive
in an S shape to the back of the panel.
Hold the panel against the wall and
secure it to the framing with
40 mm brad nails applied with a
pneumatic nailer.
• Clean up adhesive residue with
the product recommended by the
manufacturer.
PROCEDURE
• Remove the baseboard, cornice and
device boxes, shutting off the power
beforehand.
• Installation on drywall
- Locate and mark wall studs.
- Install from the bottom up and from
left to right, leaving a 1 cm separation
between the paneling and the floor,
adjoining walls and ceiling.
- To place the first row, mark out a
horizontal plumb line.
- Apply a strip of adhesive on the back
of the panel. Hold the panel against the
wall and secure it with 40 mm brad
nails applied with a pneumatic nailer, or
3.5 x 40 mm wood screws applied with
a cordless drill driver.
- Adjust the width of the final run,
trimming it down with a circular saw.
• Furring strip boards are required
for installing paneling on concrete or
brick walls.
• Installing the furring strip boards
- Mark out the location of the 1 x 2
furring strip boards, spacing them
40.5 cm apart.
Note: Leave a 1 cm separation
between the edge of the paneling
and the floor, adjoining walls
and ceiling.
Horizontal installation on framing or furring strip boards
First row.
1 Complete
piece
Second row.
1/3 Piece
Third row.
2/3 Piece
40.5
40.5
40.5
40.5
40.5
40.5
40.5
40.5
40.5
Placement of framing or furring strip boards
40.5
40.5
40.5
40.5
40.5
40.5
40.5
40.5
40.5
Directly on wall
Paneling
Wall
Wall
Ceiling 10 mm
10 mm
Floor
Wall
Wall
10 mm
10 mm
Paneling
www.arauco.cl
A
D E
Cap moulding
B
DD
E
Corner
moulding
A: Cap moulding / B: Corner moulding / C: Plastic or aluminum corner bead / D: VESTO Paneling / E: Wall
Solutions for corners (Wood, plastic or aluminum corner beads or moulding)
Trim placement (Cornices and cap moulding or baseboards)
A
B
C
G
H
I
Horizontal installation
over drywall
A
B
C
G
E
H
I
Horizontal installation
over brickwork or concrete
A
B
D
G
H
F
F
I
Vertical installation
over framing
B
B
D
G
F
F
I
Vertical installation,
half-wall
A: Cornice / B: Cap moulding or baseboard / C: Horizontally installed VESTO paneling / D: Vertically installed VESTO paneling / E: Vertical framing / F: Horizontal framing / G: Wall / H: Ceiling / I: Floor
Tips for trim (Cornices and cap moulding or baseboards)
D
F
B
Half-wall: Cap moulding
C
B
E
Floor: Baseboard
A: Cornice / B: Cap moulding or baseboard / C: Horizontally installed VESTO Paneling / D: Vertically installed VESTO Paneling / E: Vertical framing /
F: Horizontal framing
• Install the baseboard, cornice
or other trim as appropriate,
using brad or finish nails or
screws and adhesive.
• Apply paint or stain before
installation.
• If you will paint, protect the
paneling with masking tape.
A
CE
Ceiling: Cornice
Trim
CEILING, HALF-WALL AND FLOOR
D
C
D
E
Plastic or aluminum
E
C
D D
Plastic or aluminum
INSTALLATION INSTRUCTIONS VESTO PANELING
paneling