Bradley S19-310DCBF Installation guide

Category
Wall & ceiling mounts accessories
Type
Installation guide
P.O. Box 309, Menomonee Falls, WI USA 53052-0309
PHONE 800.BRADLEY (800.272.3539) FAX 262.251.5817
bradleycorp.com
Installation
215-619DCBF Rev. S; ECN 08-512
© 2008 Bradley Corporation
Page 1 of 5 9/11/08
S19-310DCBF
Barrier Free Stainless Steel
Eyewash
Table of Contents
Pre-Installation Information . . . . . . . . . . . . . . . . . . . . . . 2
Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
Assembly of Components . . . . . . . . . . . . . . . . . . . . . . . 4
Parts List . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
2
S19-310DCBF Installation
9/11/08 Bradley Corporation • 215-619DCBF Rev. S; ECN 08-512
WARNING
Read this installation manual completely to ensure proper installation, then file it
with the owner or maintenance department. Compliance and conformity to drain
requirements and other local codes and ordinances is the responsibility of the installer.
Separate parts from packaging and make sure all parts are accounted for before
discarding any packaging material. If any parts are missing, do not begin installation
until you obtain the missing parts.
Flush the water supply lines before beginning installation and after installation is
complete. Test the unit for leaks and adequate water flow. Main water supply to the
eyewash should be “ON” at all times. Provisions shall be made to prevent unauthorized
shutoff.
The ANSI Z358.1 standard requires an uninterruptible supply of flushing fluid at a
minimum 30 PSI (0.21 MPa) flowing pressure. Flushing fluid should be tepid per ANSI
Z358.1.
The inspection and testing results of this equipment should be recorded weekly
to verify proper operation. This equipment should be inspected annually to ensure
compliance with ANSI Z358.1.
Workers who may come in contact with potentially hazardous materials should be
trained regarding the placement and proper operation of emergency equipment per
ANSI Z358.1.
For questions regarding the operation or installation of this product, visit www.
bradleycorp.com or call 1-800-BRADLEY.
Product warranties and service parts information may also be found under ”Products”
on our web site at www.bradleycorp.com.
Installation
THIS
SIDE
UP
Packing List
P
.
O
.
B
o
x
3
0
9
,
M
e
n
o
m
o
n
e
e
F
a
ll
s
,
W
I 5
3
0
5
1
R
T
E
S
T
T
H
I
S
U
N
I
T
E
A
C
H
W
E
E
K
Test-o
perate v
alv
e(s) ea
c
h w
eek an
d sign
belo
w
.
R
eport an
y m
alfunction
s immed
iat
el
y
.
Ventil(e) w
öc
hen
tlic
h im
Testbe
trie
b
prüfen,
b
est
ätigt
durch U
ntersc
hrift. J
eglic
he S
törun
g s
of
or
t m
elden.
Date
Datum
Date
Signed
Unterschrift
Signe
Date
Date
Date
Signed
Signed
Signed
D
I
E
S
E
S
G
E
R
Ä
T
1
S
T
W
Ö
C
H
E
N
T
L
IC
H
Z
U
P
R
Ü
F
E
N
.
E
S
S
A
I
H
E
B
D
O
M
A
D
A
I
R
E
Test le
fonctio
nnem
ent d
es v
alv
es
chaque sem
aine et
sign
e en b
as. S
'il y
à quelqu
e c
ho
se qui n
e v
a p
as fait
un
rappor
t im
m
édiatem
ent.
P.O. BOX 309, MENOMONEE FALLS, WI 53052-0309 USA
TEL: 1-800-BRADLEY FAX: (262-251-5817)
http://www.bradleycorp.com
114-051
3
Installation S19-310DCBF
Bradley Corporation • 215-619DCBF Rev. S; ECN 08-512 9/11/08
Installation
Supplies Required:
(3) 3/8" floor anchors and bolts
Pipe sealant and teflon tape
• Piping to 1-1/4" NPT water supply inlet and 1-1/4"
NPT drain outlet
• Adequate supply pipe supports
Minimum 4" (102mm) drain to accommodate 30
gallons (115 liters) per minute discharge for shower
waste
• OPTIONAL: Sign-mounting hardware
NOTE: Local codes may require the installation of
a backfl ow prevention valve to complete proper
installation. Compliance with local codes is the
responsibility of the installer. Valve must be tested
annually to verify that it is functioning properly.
Backfl ow prevention valves are not included with
the fi xture and may be supplied by the contractor
or purchased from Bradley Corporation.
Step 1: Secure base to floor
1. Install three suitable anchors (supplied by
installer) for 3/8" bolts in the floor.
2. Bolt the base to the floor anchors using 3/8"
bolts (supplied by installer).
Step 2: Assemble eyewash
1. Assemble eyewash components as shown on
page 4
.
Apply pipe sealant (supplied by installer) to
all male-threaded pipe joints.
Thread the jam nut onto the threaded end
of the pull rod. Thread the pull rod onto
the coupling and tighten the jam nut. The
triangular end of the pull rod must be in
line with the hook end (see page 4).
Use the rubber grip pad provided or a strap
wrench around pipes when tightening to
prevent marring. Place the grip pad on the
pipe, then put the wrench over the grip pad
and turn the pipe with the wrench.
The bottom edge of the showerhead should
be 7'-1" (2160mm) from floor.
Step 3: Connect water supply
IMPORTANT: Do not rely on Bradley’s
Combination Unit to support supply
piping.
1. Connect the water supply piping (supplied
by installer) to the 1-1/4" NPT inlet. Provide
adequate supports (by installer) for supply
pipe using pipe hangers or other means.
2. Connect the drain piping (supplied by
installer) to the 1-1/4" NPT drain outlet.
3. Hang the safety sign from the unit with the
curtain hooks provided (or mount it to the wall
using sign-mounting hardware by installer).
NOTE: All dimensions assume standard thread engagement.
Variations in manufacturing allow for +/- 1/8”
(3mm) per threaded joint. To find the tolerance of
a dimension, add the number of thread joints in
between a dimension and multiply it by 1/8” (3mm).
27"
(686mm)
Ø 3.1"
(78.7mm)
65-1/2"
(1664mm)
to fl oor
33-3/8"
(846mm)
6-1/2"
(165mm)
31"
(787mm)
Ø 9" (229mm)
Flange with (3) Ø
3/8" (10mm) Holes
on Ø 8" (203mm)
Bolt Circle
4-1/2"
(114mm)
6" (152mm)
48"
(1219mm)
7'-1"
(2160mm)
to fl oor
Ø 10-3/4"
(273mm)
18-3/4"
(476mm)
10-3/8"
(264mm)
4
S19-310DCBF Installation
9/11/08 Bradley Corporation • 215-619DCBF Rev. S; ECN 08-512
Assembly of Components
15
1
2
3
5
6
2
7
8
9
11
12
4.2
4.3
4.161
16.2
4.4
4.5
4.6
4.7
16.1
13
4.8
4.9
10
10.5
10.11
10.4
10.2
10.1
10.3
4
16
16.3
4.13
4.12
4.14
4.15
4.15
4.16
4.17
4.18
4.11
4.11
14
14.1
1-1/4" NPT
Drain Outlet
Handle Note:
Close the cover
and put the pin
through the clip to
keep closed.
NOTE: Items 4.1–4.9 come preassembled as Item 4.
Items 10.1–10.5 come preassembled as Item 10.
1-1/4" NPT
Supply Inlet
NOTE: If tee (Item 7) is used as a supply
inlet, use plug (Item 8) on tee (Item 2)
Optional 1-1/4" NPT Supply
Inlet (best for rigid support)
Align
handle
pieces as
shown.
Use caution when connecting
Items 3, 4.2 & 5. Hand tight
plus 1/8 turn is suffi cient.
NOTE: Use
teflon tape
only.
5
Installation S19-310DCBF
Bradley Corporation • 215-619DCBF Rev. S; ECN 08-512 9/11/08
Parts List
1 131-059 1 Base
2 169-727 2 Pipe Tee 1-1/4"
3 113-1101 1 Pipe 1-1/4" NPT x 19-3/4"
4 S90-371 1 Dust Cover/EFW Assembly
4.1 S39-562 1 Eyewash Pipe Sub-Assy.
4.11 169-025 2 90° Street Elbow 1/2" NPT
4.12 111-084 1 Emergency Eyewash Inlet
4.13 113-1104 1 Pipe 1-1/4" x 16-1/2"
4.14 169-1020 1 Emergency Eyewash Hub
4.15 113-006LQ 2 Pipe 1-1/2" x 3-1/2"
4.16 S27-282 1 1/2" Ball Valve with Nut
4.161 110-215 1 Jam Nut only
4.17 269-1829 1 Pipe 1/2" NPT x 13-1/4"
4.18 169-726 1 Union, 1/2" Female
4.2 124-028 1 Gasket
4.3 S90-009 1 Dust Cover Assembly
4.4 173-009 1 Cup Strainer
4.5 113-1150 1 Pipe Stem
4.6 S05-091P 1 Eye/Face Sprayhead Yoke
4.7 S05-135 2 EFW Sprayhead
4.8 269-447 1 Bumper
4.9 161-025 1 Nut
5 113-006NE 1 Pipe 1-1/4" NPT x 32-1/2"
6 113-006LW 1 Pipe 1-1/4" NPT x 22-1/2"
7 169-722 1 Reducing Tee
8 169-724 1 Square-Head Pipe Plug
9 269-434 1 Pipe 1" NPT x 17"
10 S30-059 1 Stay-Open Ball Valve Assy. 1" NPT
10.1 S27-278 1 Ball Valve 1" NPT with Nut
10.11 110-214 1 Jam Nut only
10.2 140-720 1 Stop Bracket
10.3 124-048 1 Washer, Flat Friction
10.4 128-129 1 Handle
10.5 142-002DC 1 Lockwasher
11 113-006LK 1 Pipe 1" NPT x 12"
12 169-847 1 90° Street Elbow 1"
13 151-001 2 Curtain Hook
14 S24-188 1 Plastic Showerhead Assembly
14.1 S24-187 1 Flow Control Assembly, 23 GPM
15 S90-365D 1 Pull Rod 45" Long (2 pieces)
16 S30-087 1 Handle Prepack
16.1 S08-056 1 Handle Assembly
16.2 142-002DA 1 Lockwasher
16.3 153-372R 1 Adapter
17 114-052 1 Safety Sign
18 204-421 1 Emergency Inspection Tag
19 269-915 1 Grip Pad (not shown)
Item Part No. Qty Description
Item Part No. Qty Description
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5

Bradley S19-310DCBF Installation guide

Category
Wall & ceiling mounts accessories
Type
Installation guide

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI