Installation
215-158BF Rev. K; ECN 08-511
© 2008 Bradley Corporation
Page 1 of 5 4/28/08
S19-220BF
Wall-Mounted Eyewash
Table of Contents
Pre-Installation Information . . . . . . . . . . . . . . 2
Installation Instructions. . . . . . . . . . . . . . . . . . 3
Assembly of Components . . . . . . . . . . . . . . . 4
Parts List . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
2
S19-220BF Installation
4/28/08 Bradley Corporation • 215-158BF Rev. K; ECN 08-511
WARNING
Read this installation manual completely to ensure proper installation, then file it
with the owner or maintenance department. Compliance and conformity to drain
requirements and other local codes and ordinances is the responsibility of the installer.
Separate parts from packaging and make sure all parts are accounted for before
discarding any packaging material. If any parts are missing, do not begin installation
until you obtain the missing parts.
Flush the water supply lines before beginning installation and after installation is
complete. Test the unit for leaks and adequate water flow. Main water supply to the
eyewash should be “ON” at all times. Provisions shall be made to prevent unauthorized
shutoff.
The ANSI Z358.1 standard requires an uninterruptible supply of flushing fluid at a
minimum 30 PSI (0.21 MPa) flowing pressure. Flushing fluid should be tepid per ANSI
Z358.1.
The inspection and testing results of this equipment should be recorded weekly to verify
proper operation. This equipment should be inspected annually to ensure compliance
with ANSI Z358.1.
Workers who may come in contact with potentially hazardous materials should be
trained regarding the placement and proper operation of emergency equipment per ANSI
Z358.1.
For questions regarding the operation or installation of this product, visit www.
bradleycorp.com or call 1-800-BRADLEY.
Product warranties and service parts information may also be found under ”Products”
on our web site at www.bradleycorp.com.
Installation
THIS
SIDE
UP
Packing List
P
.
O
.
B
o
x
3
0
9
,
M
e
n
o
m
o
n
e
e
F
a
ll
s
,
W
I 5
3
0
5
1
R
T
E
S
T
T
H
I
S
U
N
I
T
E
A
C
H
W
E
E
K
Test-o
perate v
alv
e(s) ea
c
h w
eek an
d sign
belo
w
.
R
eport an
y m
alfunction
s immed
iat
el
y
.
Ventil(e) w
öc
hen
tlic
h im
Testbe
trie
b
prüfen,
b
est
ätigt
durch U
ntersc
hrift. J
eglic
he S
törun
g s
of
or
t m
elden.
Date
Datum
Date
Signed
Unterschrift
Signe
Date
Date
Date
Signed
Signed
Signed
D
I
E
S
E
S
G
E
R
Ä
T
1
S
T
W
Ö
C
H
E
N
T
L
IC
H
Z
U
P
R
Ü
F
E
N
.
E
S
S
A
I
H
E
B
D
O
M
A
D
A
I
R
E
Test le
fonctio
nnem
ent d
es v
alv
es
chaque sem
aine et
sign
e en b
as. S
'il y
à quelqu
e c
ho
se qui n
e v
a p
as fait
un
rappor
t im
m
édiatem
ent.
P.O. BOX 309, MENOMONEE FALLS, WI 53052-0309 USA
TEL: 1-800-BRADLEY FAX: (262-251-5817)
http://www.bradleycorp.com
114-051
3
Installation S19-220BF
Bradley Corporation • 215-158BF Rev. K; ECN 08-511 4/28/08
Installation
Supplies Required:
(4) 5/16" wall anchors and bolts
• Pipe sealant
Piping to 1/2" NPT water supply
inlet
Piping to 1-1/4" drain outlet
• Sign-mounting hardware
NOTE: Local codes may require the
installation of a backfl ow prevention
valve to complete proper installation.
Compliance with local codes is the
responsibility of the installer. Valve must
be tested annually to verify that it is
functioning properly. Backfl ow prevention
valves are not included with the fi xture
and may be supplied by the contractor
or purchased from Bradley Corporation.
Step 1: Install inlet drain fitting
1. Rough-in supply piping and drain
piping at the dimensions shown.
Mark the bracket and mounting
hole locations on the wall. Install
suitable wall anchors (sup plied
by installer) at the bracket and
mounting hole locations.
2. Secure support brack ets to the
wall with 5/16” bolts (supplied by
installer).
3. Position the eyewash with skirt over
the support brackets and rest the
back of the skirt on the brack ets.
4. Fasten the skirt to the wall with
5/16” bolts (supplied by installer) at
the mounting hole locations.
Step 2: Assemble components
1. Assemble eyewash components as
shown on page 4.
Apply pipe sealant (supplied by
installer) to all male-threaded
pipe joints.
Use a strap wrench around
pipes when tightening to prevent
marring.
Step 3: Connect water supply
1. Connect the water supply piping
(supplied by installer) to the 1/2"
NPT inlet on the eyewash.
2. Connect the tailpiece to the 1-1/4"
drain outlet on the eyewash.
3. Mount the safety sign to the wall
using sign-mounting hardware
(supplied by installer).
4. Open the water supply lines. Test
for leaks and adequate water flow.
5-1/2"
(140mm)
1-7/8"
(48mm)
3-5/8"
(92mm)
35"
(887mm)
Suggested
Height to
Floor
2-3/4"
(70mm)
Support
Brackets
36-3/4"
(933mm)
Suggested
Height to
Floor
4-1/2"
(114mm)
15" (381mm)
6-7/8"
(175mm)
1/2" NPT
Supply
Mounting
Holes
1-1/4" Drain
Outlet
4-19/32"
(117mm)
9/16"
(14mm)
9-3/16" (233mm)
10-5/16" (262mm)
19" (483mm)
3-3/4"
(95mm)
15-1/4" (368mm)
Support Brackets
Mounted on Wall
7-1/2"
(191mm)
24" (610mm)
5-1/4"
(133mm)
4
S19-220BF Installation
4/28/08 Bradley Corporation • 215-158BF Rev. K; ECN 08-511
Assembly of Components
NOTE: Items 1.1-1.12 come preassembled as Item 1.
P.O. Box 309, Menomonee Falls, WI 53051
R
TEST THIS UNIT EACH WEEK
Test-operate valve(s) each week and sign below.
Report any malfunctions immediately.
Ventil(e) wöchentlich im Testbetrieb prüfen, bestätigt
durch Unterschrift. Jegliche Störung sofort melden.
Date
Datum
Date
Signed
Unterschrift
Signe
Date
Date
Date Signed
Signed
Signed
DIESES GERÄT 1ST WÖCHENTLICH ZU PRÜFEN.
ESSAI HEBDOMADAIRE
Test le fonctionnement des valves chaque semaine et
signe en bas. S'il y à quelque chose qui ne va pas fait
un rapport immédiatement.
P.O. BOX 309, MENOMONEE FALLS, WI 53052-0309 USA
TEL: 1-800-BRADLEY FAX: (262-251-5817)
http://www.bradleycorp.com
114-051
12
13
1.6
1.5
1.4
1.3
1.2
1.1
2
4
3
1.12
1.9
1.11
1.8
1.10
1.7
5
6
7
8
9
10
7.1
11
1
14
1-1/4" Drain
Outlet
1/2" NPT
Supply Inlet
5
Installation S19-220BF
Bradley Corporation • 215-158BF Rev. K; ECN 08-511 4/28/08
Parts List
1 S90-290 1 Spray Ring Assy.
1.1 111-084A 1 Inlet-Drain Fitting w/Elbow
1.2 124-028 1 Center Seal Gasket
1.3 187-053 1 Eyewash Bowl
1.4 173-009 1 Cup Strainer
1.5 S21-073 1 Supply Pipe
1.6 113-1159 1 Spacer, Drain
1.7 S05-100 1 Eyewash Yoke
1.8 107-371 2 Dust Cover
1.9 269-651 1 Swivel Stem
1.10 124-055 2 Quad Ring
1.11 139-087 1 Spray Ring
1.12 110-199 1 Acorn Nut
2 S87-027 1 Cabinet Assy.
3 169-1024 1 Coupling
4 111-087 1 P-trap/Wall Tube
5 113-751 1 Pipe, 1/2" x 2-1/2"
6 269-1100 1 Street Elbow
7 S27-282 2 1/2" Ball Valve with Nut
7.1 110-215 1 Nut only
8 153-372R 1 Ball Valve Adapter (RH)
9 S08-336 1 Handle Assy.
10 142-002DA 1 Lockwasher
11 140-143 2 Support Bracket
12 114-051 1 Safety Sign
13 204-421 1 Emergency Inspection Tag
14 S30-070 1 Ball Valve Kit
Item Part No. Qty Description
Item Part No. Qty Description
Prepack S30-071 includes Items 7.1, 8, 9, 10
Prepack S05-127 includes Items 1.9, 1.10, 1.11, 1.12
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5

Bradley Corporation S19-220BF Installation guide

Category
Sanitary ware
Type
Installation guide

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI