Seville Classics SHE16369ZB, WEB491 Operating instructions

  • Hello! I am an AI chatbot trained to assist you with the Seville Classics SHE16369ZB Operating instructions. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
Customer Service Informaon
Telephone: (800) 323-5565
Fax: (310) 533-3899
Hours: 8:30 AM – 4:30 PM (PST)
Email: Support@SevilleClassics.com
Homepage: www.SevilleClassics.com
022019
Specicaons
Dimensions: 30" W x 14" D x 48" H
Weight capacity Per shelf Overall
On leveling feet
350 lbs. ( 158.8 kg.) 1100 lbs. (499 kg.)
STEP 6.
Clip SLIP SLEEVES (A) around top
of POLES (C). Fit CANTILEVERED
SHELF (F) over SLIP SLEEVES (A).
STEP 7.
Set BOARD (I) into top SHELF (E).
Hang S-HOOKS (H).
Congratulaons! Enjoy
your new baker's rack
workstaon!
Bakers Rack Workstaon
with Rubberwood Top
Model #: SHE16369ZB, WEB491
Thank you for choosing Seville Classics! We hope that you enjoy your
steel wire shelving! Please read through this guide for parts list, assembly
instrucons, frequently asked quesons and further contact informaon.
022019
Parts List
B. Front poles (2)
Please make sure you have all the parts on this list.
If you’re missing parts, contact us for replacements at
(800) 323-5565 or send an email to Support@SevilleClassics.com
1
D. Feet (4)
H. S-Hooks (6)
G. Hanger bar (1)
Assembly Instrucons
STEP 1.
Screw LEVELING FEET (F) into base of
boom poles.
Repeat for all boom poles.
STEP 2.
Snap SLIP SLEEVES (E) around the
grooves on BOTTOM POLES (A) for
your lowest shelf.
TIP! Count the number of grooves
from the boom of the pole to keep
the height consistent.
A. Slip Sleeves (16)
C. Rear poles (4)
(top and boom)
E. Shelves (3)
F. Canlevered shelf
(1)
I. Board (1)
2
STEP 3.
Fit SHELF (D) over the top of the 4 poles
and over SLIP SLEEVES (E).
Repeat STEPS 2-3 for remaining shelves.
TIP! If necessary, lightly tap shelves into
place with a rubber mallet.
STEP 4.
Screw TOP REAR POLES (C) onto
BOTTOM REAR POLES (C).
STEP 5.
Snap slip-sleeves around vercal poles at
same height.
Slide HANGER BAR (G) over slip sleeves.
/