WAL-ML-4X1000W-9G Operation Manual
Deploying the Unit:
1. Wheel the cart to a flat level surface where the
unit will be operating.
Remove the lock pin at the base of the handle for
maneuvering the tower. Replace this lock pin once
in position to hold the handle.
2. Extend each outrigger by loosening the T handles
holding them in place. Slide each outrigger out
until it stops. Then slide the stabilizer jack down to
the ground. Tighten all T handles to hold the
outriggers in place. There are four outriggers that
are used to help stabilize the tower when
extended.
3. Locate the self-locking hand winch on the back of
the unit to raise the mast. A clockwise rotation will
raise the mast to its full height. Once the winch
comes to a stop, the mast is fully elevated and
ready to be powered by its generator.
Generator:
This unit contains an electric start as well as a
secondary pull cord.
1. Ensure there’s an
adequate amount of
fuel in the unit before
running. Open the fuel line and close the
choke.
2. Move the switch to its ON position, then the
momentary start position to electrically start
the generator.