4
12
Hi-Rise Shelving System
Double
Threaded
Stud
13
Install Post
with Double
Threaded Stud
on First Level
Shelving Unit
14
15
Follow Steps 3-8 of Page2 for Assembly Procedure of Installing Shelves at Required Positions
16
Follow Steps 10-11 of Page3 for Installing Post Clamps and Wall Brackets at Required Positions
17
WALL BRACKET AND POST CLAMP LOCATION
5'
5'
5'
5'
All units must have post protection
be installed to prevent any contact
between the shelving units and
various material handling trucks.
NOTE:
The shelving assembly is not to
be used as, or to be support, stock
picking equipment, mezzanines,
catwalks or other auxiliary
equipments.
THIS COMPLETES THE ASSEMBLY OF SINGLE WALL UNIT (4-POST CONSTRUCTION)
HI-RISE SHELVING SYSTEM
Load Rating Plate
Installed 4'-6'
above Floor on
Each Shelving
Row (Both Ends)