Metro L01-195 Operating instructions

Type
Operating instructions
SCALE:
1” =1’
8-FOOT OPEN-STOCK PLAN-O-GRAM - COMPLETE WITH SIGN AND STOCK
SHELVES
SHELVES
SHELVES
ACCESSORIES
33”
Post
54”
Post
74”
Post
63”
Post
63”
Post
4 Casters
2
Snap-on
Hooks
2
Shelf-to
Shelf
Connectors
L01-195 Rev. C
06/13
Information and specications are subject to change
without notice. Please conrm at time of order.
InterMetro Industries Corporation
North Washington Street, Wilkes-Barre, PA USA 18705
For Product Information Call: 1-800-992-1776
Visit Our Web Site: www.metro.com
4-FOOT OPEN-STOCK PLAN-O-GRAM
TRIANGULAR
SHELVES
SHELVES
SHELVES
Posts
2
Shelf-to
Shelf
Connectors
TOP GROOVE-
THREE-SIDED
OPEN FRAME
# 68 HANGER
RAIL
# 52 GRID SHELF
# 22 CANTILEVER
GRID SHELF
# 18 THREE-SIDED
OPEN FRAME
# 3 GRID-SHELF
DIVIDER
DISPLAY
HOOK
LITERATURE
HOLDER
4-FOOT PLAN-O-GRAM ASSEMBLY DIAGRAM
(SEE OTHER SIDE ALSO)
W
4
6
8
W
4
8
8-FOOT
OPEN STOCK
PLANOGRAM -
INSTRUCTIONS
FOR USE
TOP GROOVE-
THREE-SIDED
OPEN FRAME
# 68 HANGER
RAIL
# 50 GRID
SHELF
# 22
CANTILEVER
GRID SHELF
# 18
THREE-SIDED
OPEN FRAME
# 3
GRID-SHELF
DIVIDER
DISPLAY
HOOK
LITERATURE
HOLDER
1
First check over and identify
all of the parts. Then assemble
the two 4-foot units shown at
bottom by following the general
assembly procedure shown in
steps 1 through 5 at right.
2 3
All Corners
5
Repeat
Steps 1 - 4 for
Remaining
Shelves and
Frames as
Shown Below
6
Adjustable
Levelling Foot
x4
4
LEFT 4-FOOT SECTION RIGHT 4-FOOT SECTIONCOMPONENTS
Begin with the left-hand 4-foot section. Assemble it from the bottom up, following the general procedure (steps1 through 5) at the top. Be sure to install the
correct shelves, frames, and rails at the groove numbers shown above (the numbers are indented on the posts). Then construct the right-hand section.
FINAL ASSEMBLY
ADD SIGN & STOCK
TOP GROOVE-
THREE-SIDED
OPEN FRAME
Note: Stock Shelves
First for Stability
See the other side of this
sheet for sign placement
and stocking information.
Also see sheet attached
to back of sign.
# 68 HANGER
RAIL
# 56 FULL
MAT SHELF
LITERATURE
HOLDER IN PLACE
# 36
THREE-SIDED
OPEN FRAME
# 18
THREE-SIDED
OPEN FRAME
# 3 FULL
MAT SHELF
FULL MAT SHELF - 2 SUPPLIED
GRID SHELF - 2 SUPPLIED
HANGER RAIL - 2 SUPPLIED
THREE-SIDED OPEN FRAME - 5 SUPPLIED
CANTILEVER
GRID SHLEF -
1 SUPPLIED
LITERATURE
HOLDERS -
2 SUPPLIED
DISPLAY HOOKS -
2 SUPPLIED
DIVIDER -
1 SUPPLIED
74” POST -
8 SUPPLIED
POST CLAMPS
- 4 SUPPLIED
POST CLAMPS - Use 2 sets in back
and 2 sets in front at the indicated
height to join the 2 four-foot sections
as shown above.
  • Page 1 1
  • Page 2 2

Metro L01-195 Operating instructions

Type
Operating instructions

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI