Metro L01-418 Operating instructions

Type
Operating instructions
INSTALLATION GUIDE
Seismic Bolt Plate Kits -
Floor Mounted
InterMetro Industries Corporation
North Washington Street, Wilkes-Barre, PA USA 18705
For Product Information Call: 1-800-992-1776
Visit Our Web Site: www.metro.com
Wire Shelving Systems
Commercial & Residential Solutions
L01-418 Rev A
10/13
!"#$%&'()$"*'"+*,-./)0/'()$",*'%.*,123./(*($*/4'"5.*
6)(4$1(*"$()/.7*89.',.*/$"0%&*'(*()&.*$#*$%+.%7
NOTE: :4.*,.),&)/*;$$%*-9'(.*<)(,*)"*(4),*+$/1&."(*'%.*)"(."+.+*#$%*1,.*6)(4*#%..*,('"+)"5=*;$$%*'"/4$%.+*>1-.%*?%./('
®
, Super
@+31,('29.*>1-.%*?%./('
®
, qwikSLOT™, HD Super™ and MetroMaxQ
®
*,4.9A)"5*1")(,7**:4.*-'%(*"1&2.%,*)+."()0.+*)"*(4),*
document had earned pre-approval OPA-0556 and are valid for the 2001 and 2007 California Building Code (CBC) which
5$A.%".+*".6*21)9+)"5*-%$3./(,*)"*(4.*,('(.*$#*B@*+.,)5".+*($*(4.*%.C1)%.&."(,*$#*(4.*DEEF*'"+*DEEG*BHB7**:4.,.*-'%(,*6.%.*
"$(*,12&)((.+*($*I>J8K*#$%*(4.*DEFE*BHB*'"+*(41,*4'A.*"$(*.'%".+*-%.L'--%$A'9*#$%*21)9+)"5*-%$3./(,*,123./(*($*(4.*DEFE*
BHB7**J$6.A.%=*(4.,.*,.),&)/*#$$(*-9'(.,*/'"*2.*1,.+*6)(4*M.(%$*>1-.%*?%./('=*>1-.%*@+31,('29.*>1-.%*?%./('=*C6)<>NI:=*
JK*>1-.%=*'"+*M.(%$M'OP*,4.9A)"5*1")(,*($*$2(')"*,)(.L,-./)0/*'--%$A'9,7
Super Adjustable
Super Erecta
®
Shelving
Original Super
Erecta
®
Shelving
Super Erecta
®
qwikSLOT™
Shelving
SASES25BP-1 SASES50BP-1
SASES25BP-2 SASES50BP-2
SASES25BP-4 SASES50BP-4
MetroMaxQ
®
Shelving
SAQHD25BP-1
SAQHD50BP-1
SAQHD25BP-2 SAQHD50BP-2
SAQHD25BP-4 SAQHD50BP-4
HD Super™ Shelving
*Save this document for future application, load rating and/or safety reference.
Seismic Bolt Plate Kits
2
Part Number: Consists of:
>@>?>DQH8LF
RST*;$$%*-9'(., (1) hardware bag (1) label bag
>@>?>QEH8LF RST*;$$%*-9'(., (1) hardware bag (1) label bag
>@>?>DQH8LD RDT*;$$%*-9'(., (1) hardware bag (1) label bag
>@>?>QEH8LD RDT*;$$%*-9'(., (1) hardware bag (1) label bag
>@>?>DQH8LS RFT*;$$%*-9'(. (1) hardware bag (1) label bag
>@>?>QEH8LS RFT*;$$%*-9'(. (1) hardware bag (1) label bag
SAQHD25BP-1 RST*;$$%*-9'(., (1) hardware bag (1) label bag
SAQHD50BP-1 RST*;$$%*-9'(., (1) hardware bag (1) label bag
SAQHD25BP-2 RDT*;$$%*-9'(., (1) hardware bag (1) label bag
SAQHD50BP-2 RDT*;$$%*-9'(., (1) hardware bag (1) label bag
SAQHD25BP-4 RFT*;$$%*-9'(. (1) hardware bag (1) label bag
SAQHD50BP-4 RFT*;$$%*-9'(. (1) hardware bag (1) label bag
LIST OF
COMPONENTS:
(Floor Anchors not included)
INSTALLATION
INSTRUCTIONS
For Floor Mounted
Bolt Plate Kits
BOLT PLATE ASSEMBLY TO
SHELVING POST CONNECTION
The bolt plate anchor assembly is
+.,)5".+*($*'99$6*)"L0.9+*9.A.9)"5*$#*
the shelving and secure anchorage of
the shelving to the bolt plates. This is
accomplished with standard shelves
and posts with leveling bolts.
1. Place the assembled shelving unit
in its intended location.
D7*M'%<*$"*(4.*;$$%*(4.*9$/'()$"*$#*(4.*
shelving posts, or place the bolt plates
under the posts. Move the shelving
unit out of the way.
3. Utilizing a template, or the actual
bolt plate, mark the location of the
;$$%*'"/4$%,=*+%)99*'--%$-%)'(.*4$9.,=*
and install the bolt plates.
S7*M$A.*(4.*,4.9A)"5*1")(*'+3'/."(*($*
the bolt plates and level the unit. Lift
the shelving unit and place the posts
into the pipe sleeves in the bolt plate
assembly.
5. Once the shelving unit is in place
and level, horizontal holes in each
pipe sleeve are used to align a 13/32"
drill bit and a horizontal hole (or two,
as determined from the Seismic
Specifying Guide (L04-160)) is drilled
through the post. Alternatively, the
pipe sleeve holes can be used to
mark the post hole locations, the
shelving unit removed and the holes
in the post drilled.
6. Install a 3/8" diameter clevis pin (or
two) from the supplied hardware bag
through the bolt plate pipe sleeve and
post, install a hitch pin clip.
G7*U)"'99V=*'#0O*(4.*-%$-.%*9'2.9*
designating the unit as either 30 psf
or 50 psf per shelf. The load rating
is determined by the tables in the
Seismic Specifying Guide and may
be shown on the installation drawing
provided with the quote package in
(4.*-9'"")"5*,('5.*$#*(4),*-%$3./(7
Note: The lowest shelf should be as
close as possible to the bolt plate, no
4)54.%*(4'"*FDW*#%$&*;$$%7**
If cleaning is an issue, it is
recommended a donut bumper
2.*,-./)0.+*($*/$A.%*'"V*,-'/.,*
between the post and the bolt plate
anchor pipe. These may have been
,-./)0.+*)"*(4.*C1$()"5*-%$/.,,*'"+*
provided — if not, order the donut
bumper to match the post type.
Metro does not provide the concrete
;$$%*'"/4$%,7*:4.*/$%%./(*;$$%*
'"/4$%,*&1,(*2.*1,.+*#$%*(4.*,-./)0/*
installation conditions and meet all
applicable codes.
3
Seismic Bolt Plate Kits
4
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4

Metro L01-418 Operating instructions

Type
Operating instructions

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI