IQ23x Series Controllers Installation Instructions TG200539 Issue 2 , 23-Feb-2012 1
Installation Instructions
IQ23x
Series Controllers
Important: Retain these instructions
These instructions shall be used be used by trained service personnel only
If the equipment is used in a manner not specied by these instructions, the protection provided by the equipment may be impaired.
1
Dimensions
2
Mounting Requirements
Altitude: 2000m (6562’)
3 INSTALLATION
3.1 Installation - Mounting
1 UNPACKING
2 STORING
It is recommended that the installation should comply
with the local electrical safety installation practices
(e.g. HSE Memorandum of Guidance on Electricity
at Work Regulations 1989, For USA National Electric
Code).
CONTENTS
1 Unpacking .....................................................................1
2 Storing ...........................................................................1
3 Installation .....................................................................1
3.1 Installation - Mounting ...................................................1
3.2 Installation - Conguring ...............................................5
4 Connecting a Remote 2-Line Display ...........................9
5 Connecting to PC via Supervisor Port ..........................9
6 Connecting to NDP via Supervisor Port .....................10
7 Mounting in an Enclosure, ENCLs/... ..........................10
8 Replacing the Battery ..................................................11
9 Zero Address/Baud Rate Switch Reset ......................13
10 Replacing an IQ111 with an IQ231 ..............................14
11 Replacing an IQ111+ with an IQ231 ............................19
12 Replacing an IQ131 with an IQ233 .............................24
13 Replacing an IQ131+ with an IQ233 ...........................28
14 Installing an Auxiliary Internal Node Board ................32
15 Disposal .......................................................................40
IQ23x Installation
Instructions TG200539
HO
2
+50 °C
0
-10 °C
90 %RH
RX
TX
OK
A
D
DP
C
B
1
2
8
4
16
32
64
1K2
9K6
19K2
ADDRESS
BAUD
93 mm
(3.66”)
339 mm (13.35”)
299 mm (11.77”)

          
  

          
  
123 4 5 6 7 8 9 10
RX
TX
OK
ADDRESS BAUD
SW4
A
D
DP
C
B
 






a
b
c
HO
2
0 °C
+45 °C
0 %RH
90 %RH
d







e











The unit must
be installed in
an enclosure
conforming to
EN61010-1
2 IQ23x Series Controllers Installation Instructions TG200539 Issue 2 , 23-Feb-2012
IQ23x Installation Instructions
3
Mounting
4
Connecting Power IQ Consumption > 60 VA
5
Connecting Network
3.1 Installation - Mounting (continued)
a
4 x Ø 6 mm
b
263 mm
308 mm
14 mm













12 mm
14 mm
DO NOT APPLY POWER
230 Vac +15% -10% 50 to 60 Hz
cable supplied
   
 
2 wire 4 wire
Network Engineering
Manual 92-1735
polarity independent
Cable 1k2 baud 9k6 baud 19k2 baud
No. of
Wires
Belden 9182 1000 m 1000 m 700 m 2
Belden 9207 1000 m 1000 m 500 m 2
Trend TP/1/1/22/HF/500
(Belden 8761)
1000 m 700 m 350 m 2
Trend TP/2/2/22/HF/500
(Belden 8723)
1000 m 500 m 250 m 4
Terminal size 0.5 to 2.5 mm
2
RX
TX
OK
A
D
DP
C
B
1
2
8
4
16
32
64
1K2
9K6
19K2
ADDRESS
BAUD
 



 



M3 earth stud
12 mm
The 230V supply must include a dedicated 5A fuse complying
with BS1632 and a suitably rated switch in close proximity
and be clearly marked as the disconnecting device for the
unit. A 5A circuit breaker with high breaking capacity may be
used as an alternative .
WARNING: This unit must be earthed
(grounded) via the Earth terminal of the IEC
connector or Mate-N-Lok adaptor.
IQ23x Series Controllers Installation Instructions TG200539 Issue 2 , 23-Feb-2012 3
Installation Instructions IQ23x
6
Connect Inputs
Trend TP/1/1/22/HF/500 (Belden 8761) cable
recommended for all inputs
Terminal size 0.5 to 2.5 mm
2








          

 
 
 
 
 
 
 
 
 
 
 
RX
TX
OK
A
D
DP
C
B
1
2
8
4
16
32
64
1K2
9K6
19K2
ADDRESS
BAUD
earth ange

 

Digital input (loop powered)
Thermistor input

 


 
 

Voltage input
Current input (loop powered)

 

  

 
   




Universal Inputs IN1 to IN20
Digital input (external powered)
Current input (external powered)

 




earth ange
earth ange
earth ange
earth ange
earth ange
earth ange
if LKE/15V ttedif LKE/5V

 





 




earth ange
earth ange
if LKE/10mA tted

 


earth ange
3.1 Installation - Mounting (continued)
4 IQ23x Series Controllers Installation Instructions TG200539 Issue 2 , 23-Feb-2012
IQ23x Installation Instructions
7
Connect Outputs
Trend TP/1/1/22/HF/500 (Belden 8761) cable recommended for voltage outputs
Terminal size 0.5 to 2.5 mm2
3.1 Installation - Mounting (continued)


   
  
  



          
RX
TX
OK
A
D
DP
C
B
1
2
8
4
16
32
64
1K2
9K6
19K2
ADDRESS
BAUD



Additional Relay Modules
earth ange
IQ23x
Relay
Module
SRMV =
x 1
2SRM =
x 2
3RM =
x 3
6RM =
x 6
2RM =
x 2
nRM
(R/L, H/L)
(HCM/TRM)
Analogue Voltage Outputs, B1 to B12
earth ange
8
Connect Auxiliary Supply 24 V
RX
TX
OK
A
D
DP
C
B
1
2
8
4
16
32
64
1K2
9K6
19K2
ADDRESS
BAUD

 



 




Imax = 500 mA
e.g.
500 mA
0 V 24 V
AUX
Terminal size 0.5 to 2.5 mm
2
9
Close Panel











WARNING: The wires may be connected to
hazardous voltages. Disconnect power before
attempting any wiring.
IQ23x Series Controllers Installation Instructions TG200539 Issue 2 , 23-Feb-2012 5
Installation Instructions IQ23x
6
Set the Network Address
4
Disconnect I/O and Aux
Supply 5
Set the Network Baud Rate
3
Open Panel
1
Switch Off
2
Isolate I/O, and Aux
Supply
3.2 Installation - Conguring
O
I
O
I
A
D
DP
C
B
RX
TX
OK
1
2
8
4
16
32
64
1K2
9K6
19K2
ADDRESS
BAUD











WARNING: The connecting
leads may be connected to
supplies. Isolate before touching.
WARNING: Opening the
panel may expose
dangerous voltages.













      













RX
TX
OK
A
D
DP
C
B
1
2
8
4
16
32
64
1K2
9K6
19K2
ADDRESS
BAUD
Baud Rate = B
= B
= B
= B
= B
= 19k2 baud
= 9k6 baud
= 1k2 baud
= 4k8 baud
= A
= A
= A
= A
IQ23x
/
/
/
RX
TX
OK
A
D
DP
C
B
1
2
8
4
16
32
64
1K2
9K6
19K2
ADDRESS
BAUD













    

Address = A
address
e.g.
Address = 2 + 16 = 18
SET
NOT SET
1, 4 to 9, 11 to 119
0, 2 ,3 ,10 or >119
A
D
DP
C
B
RX
TX
OK
1
2
8
4
16
32
64
1K2
9K6
19K2
ADDRESS
BAUD
Leave power and network connected
6 IQ23x Series Controllers Installation Instructions TG200539 Issue 2 , 23-Feb-2012
IQ23x Installation Instructions
7
Remove Cover
8
Link Input Channels
(unless link header being used on channel)
3.2 Installation - Conguring (continued)























CAUTION: This unit contains static sensitive devices. Suitable
anti-static precautions should be taken throughout this operation to
prevent damage to the units.













Thermistor
Digital loop
powered
Voltage
Current loop
powered
Digital
externally powered
Current
externally powered
9
Fit Link Headers
(if used)











a Identify set of pins
b Remove links c Select Link Header
LKE/5V 5 V supply
LKE/15V 15 V supply
LKE/10mA 10 mA supply
IQ23x Data Sheet TA200538
d Push on Link Header




 

link header in
position
view on top of board
view on front edge of board
board on left
hand side
2 pins left free
2 pins free
IQ23x Series Controllers Installation Instructions TG200539 Issue 2 , 23-Feb-2012 7
Installation Instructions IQ23x
10
Replace Cover
11
Switch On
12
Check Controller
13
Check Network
3.2 Installation - Conguring (continued)












replace 5 screws
RX
TX
OK
A
D
DP
C
B
1
2
8
4
16
32
64
1K2
9K6
19K2
ADDRESS
BAUD
Check supply
IQ Faulty
b
(fail)
(red)
a
(power)
(green)
 
 
 
RX
TX
OK
A
D
DP
C
B
1
2
8
4
16
32
64
1K2
9K6
19K2
ADDRESS
BAUD
b TX
a RX
c OK
IQ Faulty
Check network cabling
for short circuits with a
multimeter (NOT Megger)
Check baud rate
. Power up other nodes
until faulty node is found
(OK
). Correct fault.
Network Address Invalid
0,2,3 or >119
OK
OK
(green)
(yellow)
(yellow)
RX
TX
OK
8 IQ23x Series Controllers Installation Instructions TG200539 Issue 2 , 23-Feb-2012
IQ23x Installation Instructions
15
Test Inputs
14
Congure
16
Test Outputs
IQ Conguration Manual 90-1533
IQ23x Data Sheet TA200538
SET Manual TE200147 or
PowerTool Manual TE200163
 
OR
IQ23x
X.IQ2
SET
PowerTool
IQ23x
X.IQ2
if autodialled
also set time,
day, date
RX
TX
OK
A
D
DP
C
B
1
2
8
4
16
32
64
1K2
9K6
19K2
ADDRESS
BAUD
9 Way ‘D type’
Female
Cable/EJ101442
IQ23x
RX
TX
OK
1
2
8
4
16
32
64
1K2
9K6
19K2
ADDRESS
BAUD
A
D
DP
C
B
 
 











T = X
a
b
c d
Switch off
Switch on
(yellow)























 
e.g. VB
d
c
a
b
Switch off
Switch on
(yellow)
17
Backup
SET Manual TE200147
PowerTool Manual TE200163
OR
RX
TX
OK
A
D
DP
C
B
1
2
8
4
16
32
64
1K2
9K6
19K2
ADDRESS
BAUD
9 Way ‘D type’
Female
Cable/EJ101442
RJ11
IQ23x
 
SET
(compare)
PowerTool
IQ23x
X.IQ2
X.IQ2
IQ23x
if autodialled











18
Close Panel
3.2 Installation - Conguring (continued)
IQ23x Series Controllers Installation Instructions TG200539 Issue 2 , 23-Feb-2012 9
Installation Instructions IQ23x
6
Adjust Viewing Angle (if faint)
5
Test
4 CONNECTING A REMOTE 2-LINE DISPLAY (if KIT/2xx/RDS has been tted)
1
Ensure /RDS Installed
KIT/2xx/RDS
Installation Instructions
TG103128
2
Switch Off
3
Connect Display
(FPK or HDP)
DP
Connector
4
Switch On
Display Panel
Manual 90-1505
angle adjust screw
5 CONNECTING TO PC VIA SUPERVISOR PORT
1
Connect RS232
RX
TX
OK
A
D
DP
C
B
1
2
8
4
16
32
64
1K2
9K6
19K2
ADDRESS
BAUD
9 F’D’
Cable/EJ101442
RJ11
IQ23x
2
Congure Address
 
sUpervisor port addr = 1,4 to 9, 11 to 119
SET or
PowerTool
IQ Conguration Manual 90-1533
IQ23x Data Sheet TA200538
sUpervisor port addr = 0
10 IQ23x Series Controllers Installation Instructions TG200539 Issue 2 , 23-Feb-2012
IQ23x Installation Instructions
6
Replace Backplate
5
Mount IQ23x on Backplate
3
Fix to Wall
4
Remove Backplate
1
Open Door
2
Drill Wall
1
Congure Address
See section ‘Connecting to PC via Supervisor Port’, steps 1 & 2 above
3
Test
2
Connect NDP to Controller
6 CONNECTING TO NDP VIA SUPERVISOR PORT
sUpervisor port addr = 1,4 to 9, 11 to 119
sUpervisor port addr = 0
Conguration Mode, addRess Module
 
Cable/EJ104029
+ -
RX
TX
OK
A
D
DP
C
B
1
2
8
4
16
32
64
1K2
9K6
19K2
ADDRESS
BAUD
7 MOUNTING IN AN ENCLOSURE, ENCLS/...
b
a
560 mm
560 mm
OR
No. 12
M6
1
2
8
4
16
32
64
9K6
19K2
ADDRESS
IQ23x Series Controllers Installation Instructions TG200539 Issue 2 , 23-Feb-2012 11
Installation Instructions IQ23x
6
Replace Battery
8 REPLACING THE BATTERY
1
Upload Strategy
 
SET Manual TE200147
PowerTool Manual TE200163
OR
RX
TX
OK
A
D
DP
C
B
1
2
8
4
16
32
64
1K2
9K6
19K2
ADDRESS
BAUD
9 ‘D type’
Female
Cable/EJ101442
RJ11
IQ23x
SET or
PowerTool
IQ23x
X.IQ2
SET cannot upload
over autodial link
See section 5 ‘Connecting to
PC via Supervisor Port’ above
2
Switch
Off
3
Isolate I/O, Network
O
I
O
I
A
D
DP
C
B
RX
TX
OK
1
2
8
4
16
32
64
1K2
9K6
19K2
ADDRESS
BAUD
WARNING: The connecting leads may
be connected to supplies. Isolate before
touching.
4
Open Panel











WARNING: Opening the panel may expose
dangerous voltages.
5
Remove Cover























remove 5 screws
CAUTION: This unit contains static sensitive devices. Suitable
anti-static precautions should be taken throughout this operation to
prevent damage to the units.
a
b c











CR2032 3V
Warning: The lithium battery
must not be recharged,
disassembled, burnt or
short circuited. Misuse
may cause explosion
or fire. Dispose of
carefully. Refer to
Health and Safety
Executive Guidance
Note GS43.
CR 2032
CR 2032
CR 2032
12 IQ23x Series Controllers Installation Instructions TG200539 Issue 2 , 23-Feb-2012
IQ23x Installation Instructions
7
Replace Cover
9
Wait
8
Switch On
10
Download Strategy
11
Close Panel
12
Reconnect Supply to I/O, Network
8 REPLACING THE BATTERY (continued)












replace 5 screws
10s
SET Manual TE200147
PowerTool Manual TE200163
OR
RX
TX
OK
A
D
DP
C
B
1
2
8
4
16
32
64
1K2
9K6
19K2
ADDRESS
BAUD
9 ‘D type’
Female
Cable/EJ101442
RJ11
IQ23x
 
SET or
PowerTool
IQ23x
X.IQ2
Also set time, day, date.
SET cannot download
over autodial link























IQ23x Series Controllers Installation Instructions TG200539 Issue 2 , 23-Feb-2012 13
Installation Instructions IQ23x
9 ZERO ADDRESS/BAUD RATE SWITCH RESET
1
Backup, Switch Off, Isolate, Open Panel
Replace the battery, see section 8 ‘Replacing the Battery’, steps 1 to 4 above
2
Note the Network Address and
Baud Rate
RX
TX
OK
A
D
DP
C
B
1
2
8
4
16
32
64
1K2
9K6
19K2
ADDRESS
BAUD







   



















= 19k2 baud
= 9k6 baud
= 1k2 baud
e.g.
Address = 2 + 16 = 18
SET
NOT SET
= 4k8 baud
3
Set all Switch Poles to Zero
RX
TX
OK
A
D
DP
C
B
1
2
8
4
16
32
64
1K2
9K6
19K2
ADDRESS
BAUD







   







Address = 0 Baud = 0
NOT SET
4
Switch On
5
Wait for Relays
‘click’
6
Reset the Network Baud Rate
= B
= B
= B
= B






RX
TX
OK
A
D
DP
C
B
1
2
8
4
16
32
64
1K2
9K6
19K2
ADDRESS
BAUD
Baud Rate = B
19k2 baud
9k6 baud
1k2 baud
4k8 baud



















      

7
Reset the Network Address
= A
= A
= A
= A
IQ23x
/
/
/






RX
TX
OK
A
D
DP
C
B
1
2
8
4
16
32
64
1K2
9K6
19K2
ADDRESS
BAUD
SET
NOT SET
e.g.
Address = 2 + 16 = 18
address
1, 4 to 9, 11 to 119
0, 2 , 3,10 or >119
Address = A







   

14 IQ23x Series Controllers Installation Instructions TG200539 Issue 2 , 23-Feb-2012
IQ23x Installation Instructions
10 REPLACING AN IQ111 WITH AN IQ231
Subject
Question
Action Required
Additional Equipment
Fixing Are xing bars used? If NO must drill new xing holes
Is panel depth greater than 93 mm?
If not, can this be modied?
I/O Are current outputs used? If YES replace SRMI with SRMV (or
2SRM for 2 channels), use 2VID on
other channels
SRMV (one for each SRMI,
or 2SRM for 2 channels)
2VID (one for two
channels)
External 2DP Is an external 2 line display panel
tted?
If YES must t IQ231 with KIT/2xx/RDS KIT/2xx/RDS
Internal 2DP Is internal 2 line display panel tted? If YES must use IQ231/DP/ IQ231/DP/..option
Extenal NDP Is external NDP connected? If YES use cable CABLE/EJ104029 for
signal and power
CABLE/EJ104029
Local
Supervisor
Is local supervisor connected either
permanently or from time to time?
If YES replace complete cable with new
cable CABLE/EJ101442
CABLE/EJ101422
Auxiliary
Supply
Are the auxiliary supply terminals
used?
If YES connect to IQ231 auxiliary supply
terminals by 2 way extension cable.
Rewire connector to swop polarity
2 way extension cable in
KIT/IQ23x/UPGRADE
Link Headers Are Link headers used? If YES identify link headers below
LK /A?
Use LKE/5V
LKE/5V
LK/B? Use LKE/15V LKE/15V
LK/C?
Use LKE/10mA
LKE/10mA
LK/E? not supported
LK/F?
not required
LK/0? Link for externally powered current
sensor (Ix)
Internal Node Is an internal node tted? If YES and node is CNC used to
connect local supervisor or NDP to
network, discard board, else if YES,
check below
Is the node based on the TMN board
(CNC2, PNC2, INC2, TMN, since
1999)?
Use TMN type board plate TMN type board plate in
KIT/NODE/IQ23x
Is the node an older board (CNC,
PNC, INC,before 1999, and ANC,
AND, ENC, XN28, XNC+, MNC,
LINC)?
Use pre-TMN type board plate pre-TMN type board plate
in KIT/NODE/23x
Is node CNC, CNC2, PNC, PNC2?
Use EJ100179A001 10 pin in line socket
(Molex) to 25 way female D cable to
connect to printer or device
EJ100179A001 in KIT/
NODE/IQ23x
Is node TMNE? Use EJ103817 10 pin in line socket
(Molex) to 25 way male D cable to
connect to modem
EJ103817 in KIT/NODE/
IQ23x
Is node ANC, AND, XN28? Use 78-0903/1 10 pin in line socket
(Stocko) to 25 way male D cable to
connect to modem
78/0903/1 in KIT/NODE/
IQ23x
Baud Rates Is supervisor baud rate 1k2? Change supervisor baud rate to 9k6
Internal Sensor
Is internal sensor used in internal
digital mode?
If YES set bit 506,1
Note that KIT/IQ23x/UPGRADE also contains the 2 off 4 wide network extension cables (see step 15 below).
1
Survey Unit
IQ23x Series Controllers Installation Instructions TG200539 Issue 2 , 23-Feb-2012 15
Installation Instructions IQ23x
7
Check Connections
4
Switch Off
5
Isolate I/O, Network
6
Open Panel
2
Upload IQ111 Strategy
10 REPLACING AN IQ111 WITH AN IQ231 (continued)
 
WupDn Manual TE200162
PowerTool Manual TE200163
OR
 
9 ‘D type’
Female
Cable/58-0750
25 Way ‘D type’
Male
IQ111
WupDn or
PowerTool
IQ111
X.IQF
3
Note Network Address
IQ Conguration Manual 90-1533
Top Menu
tYpe Sensor difI/p Driver Functn loGic Loop scHedule
seQnc Analog digBit Knob sWitch Time Zone Oss
User addRess intcoN calarM reView Plot calEndar
select addRess module
to eXit conguration
mode
to Quit module
Use PowerTool, Lan 0, Address 0
Note Local address
O
I
IQ111
WARNING: The connecting leads may be
connected to supplies. Isolate before
touching.
 
 
is external 2DP tted?
is local supervisor
connected?
is internal 2DP
tted?
Are auxiliary supply
connections used?
is network
connected?
is external NDP
tted?
16 IQ23x Series Controllers Installation Instructions TG200539 Issue 2 , 23-Feb-2012
IQ23x Installation Instructions
10
Check Setup
11
If Node Fitted Remove Node Card
12
Remove IQ111
13
Replace with IQ231
Same mounting centres
If mounting bars were not used, redrill - see section 3.1
Installation - Mounting’, step 3
14
Connect Power
Plug in power lead - section ‘3.1 Installation - Mounting’, step
4
9
Remove Cover
8
Remove all Connections
10 REPLACING AN IQ111 WITH AN IQ231 (continued)
IQ111
IQ111
Note Baud Rate Settings
Is a node tted?
new (TMN type) board or not?
Check output link settings






  
 
Note input link settings
Check for
Link Headers
Link Header type
LK/A, B, C, E, F, 0
?
CNC, CNC2, PNC, PNC2
MNC, TMN
ANC, AND, XN28, XNC
Note that a CNC used to
connect a local supervisor or
NDP to the network may be
discarded
IQ23x Series Controllers Installation Instructions TG200539 Issue 2 , 23-Feb-2012 17
Installation Instructions IQ23x
18
Connect Auxiliary Supply
if used - see step 7 above
10 REPLACING AN IQ111 WITH AN IQ231 (continued)
15
Connect Network
if used - see step 7 above












see page 2 step 5
2 off 4 wide network extension cables
provided in KIT/IQ23x/UPGRADE
screen
R+
R-
T+
T-
+
-
R+
R-
T+
T-
+
-
+
-
+
-
R+
R-
T+
T-
R+
R-
T+
T-
16
Connect Inputs
Signal leads should plug in
channel for channel - see section
‘Installation - Mounting’, step 6
(page 3)
Note: Early IQ111s had single
part input connectors so will
require terminals to be wired.
17
Connect Outputs
Channels previously linked as current (I) will need:
either (a) Replace SRMI by SRMV or (2SRM for pair of
channels)
or (b) Add 2VID for each pair of channels
Otherwise signal leads should be plugged in channel
for channel - see section Installation - Mounting’, step
7 (page 4)












see page 4 step 8
2 wide extension cable
provided in
KIT/IQ23x/UPGRADE
0
24
0 24
0
24
Rewire connector to
swop polarity
19
Set Network Baud Rate to previous
as noted in step 10 above - see section
‘Installation - Conguring’ step 5
20
Set Network Address to previous
as noted in step 3 above - see section
‘Installation - Conguring’ step 6
21
Remove Cover
see section ‘Installation - Conguring’ step 7 22
Link Input Channels
as noted in step 10 above - see section
‘Installation - Conguring’ step 9
23
Fit Link Headers
to channels as noted in step 10 above - see section
‘Installation - Conguring’ step 9
24
Replace Cover, Switch On, Check
Controller, Check Network
- see section ‘Installation - Conguring’ steps 10
to 13
25
Download Strategy File
previously saved in step 2 above
 
WupDn Manual TE200162
PowerTool Manual TE200163
OR
RX
TX
OK
A
D
DP
C
B
1
2
8
4
16
32
64
1K2
9K6
19K2
ADDRESS
BAUD
9 ‘D type’
Female
Cable/EJ101442
RJ11
IQ231
WupDn or
PowerTool
IQ231
X.IQF
set time, date, day of week
18 IQ23x Series Controllers Installation Instructions TG200539 Issue 2 , 23-Feb-2012
IQ23x Installation Instructions
10 REPLACING AN IQ111 WITH AN IQ231
(continued)
26
Make IQ2xx Changes
either upload to SET and make changes,
or change in conguration mode - see section ‘Installation - Conguring’ step 14 (page 8).
Loop Reschedule Time: Multiply by 5 and re-enter
Sensor Scaling Mode 1: If sensor outputs a voltage signal, and scaling mode 0, linear is being used, multipy T and B by 2
and re-enter.
Sensor Scaling Mode 2: If scaling mode 2 (linearise thermistor volts) is used, change it to sensor scaling mode 3 (linearise
volts).
Shared Labels: Set up digital input labels. (Copy from sensor channel of same number if appropriate).
Internal Sensors: If an internal sensor is used in internal digital mode, bit 506,1 should be set to one
27
Test Inputs, Test Outputs, Backup
- see section ‘Installation - Conguring’, steps
15,16 & 17
28
Connect External Display Panel
if noted in step 7 - see section 4 ‘Connecting a
Remote 2-Line Display
29
Connect Local Supervisor
if noted in step 6 above - see section 5
‘Connecting to PC via Supervisor Port’
30
Connect External NDP
if noted in step 6 above - see section 6
‘Connecting to NDP via Supervisor Port
31
Set Baud Rate of Supervisor
if 1k2 supervisor baud rate noted in step 10, and
supervisor connected in step 29 above, set baud
rate of supervisor to 9k6
32
Connect Internal Node
if noted in step 10 above
33
Close Panel











IQ23x Series Controllers Installation Instructions TG200539 Issue 2 , 23-Feb-2012 19
Installation Instructions IQ23x
2
Upload IQ111+ Strategy
1
Survey Unit
11 REPLACING AN IQ111+ WITH AN IQ231
Subject
Question
Action Required
Additional Equipment
Fixing Is it xed in a small box (380 x 380
x 80 mm) using semicircular cutout
xings?
If YES, must drill new xing holes
Is panel depth greater than 93 mm?
If not, can this be modied?
Power Is mains supply capable of supplying
60 VA?
If not, increase power supply
External 2DP Is an external 2 line display panel
tted?
If YES must t IQ231 with KIT/2xx/
RDS
KIT/2xx/RDS
Internal 2DP Is internal 2 line display panel tted? If YES must use IQ231/DP/ IQ231/DP/..option
Extenal NDP Is external NDP connected? If YES use cable CABLE/EJ104029
for signal and power
CABLE/EJ104029
Local
Supervisor
Is local supervisor connected either
permanently or from time to time?
If YES replace complete cable with
new cable CABLE/EJ101442
CABLE/EJ101422
Auxiliary Supply Are the auxiliary supply terminals
used?
If YES connect to IQ231 auxiliary
supply terminals by 2 way extension
cable
2 way extension cable in
KIT/IQ23x/UPGRADE
Link Headers Are link headers used? If YES identify link headers below
LK/5V
Use LKE/5V
LKE/5V
LK/15V Use LKE/15V LKE/15V
LK/10mA
Use LKE/10mA
LKE/10mA
Internal Node Is an internal node tted? If YES and node is CNC used to
connect local supervisor or NDP to
network, discard board, else if YES,
check below
Is the node based on the TMN board
(CNC2, PNC2, INC2, TMN, since
1999)?
Use TMN type board plate TMN type board plate in
KIT/NODE/IQ23x
Is the node an older board (CNC,
PNC, INC,before 1999, and ANC,
AND, ENC, XN28, XNC+, MNC,
LINC)?
Use pre-TMN type board plate pre-TMN type board plate in
KIT/NODE/IQ23x
Is node CNC, CNC2, PNC, PNC2? Use EJ100179A001 10 pin in line
socket (Molex) to 25 way female D
cable to connect to printer or device
EJ100179A001 in
KIT/NODE/IQ23x
Is node TMNE? Use EJ103817 10 pin in line socket
(Molex) to 25 way male D cable to
connect to modem
EJ103817 in
KIT/NODE/IQ23x
Is node ANC, AND, XN28? Use 78-0903/1 10 pin in line socket
(Stocko) to 25 way male D cable to
connect to modem
78/0903/1 in
KIT/NODE/IQ23x
Internal Sensor
Is internal sensor used in internal
digital mode?
If YES set bit 506,1
WupDn Manual TE200162
PowerTool Manual TE200163
 
OR

 
9 ‘D type’
Female
Cable/58-0750
5 in line Stocko
Female
IQ111+
WupDn or
PowerTool
IQ111+
X.IQF
CABLE/78-1172
25 way ‘D type’ Female
20 IQ23x Series Controllers Installation Instructions TG200539 Issue 2 , 23-Feb-2012
IQ23x Installation Instructions
8
Remove Cover
7
Remove all Connections
6
Check Connections
5
Open Panel
4
Isolate I/O, Network
3
Switch Off
11 REPLACING AN IQ111+ WITH AN IQ231 (continued)

 
WARNING: The connecting leads may be
connected to supplies. Isolate before
touching.
 
 
 
 
is external 2DP tted?
is local supervisor
connected?
is internal 2DP
tted?
Is auxiliary supply
connection used?
is network
connected?
is external
NDP tted?
12345 678910
IQ111+
 
 
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16
  • Page 17 17
  • Page 18 18
  • Page 19 19
  • Page 20 20
  • Page 21 21
  • Page 22 22
  • Page 23 23
  • Page 24 24
  • Page 25 25
  • Page 26 26
  • Page 27 27
  • Page 28 28
  • Page 29 29
  • Page 30 30
  • Page 31 31
  • Page 32 32
  • Page 33 33
  • Page 34 34
  • Page 35 35
  • Page 36 36
  • Page 37 37
  • Page 38 38
  • Page 39 39
  • Page 40 40

Trend IQ23 Series Installation Instructions Manual

Type
Installation Instructions Manual

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI