BLOTZ B10_CS_007 Assembly Instructions

Type
Assembly Instructions

This manual is also suitable for

10mm 5x5 ‘L-Shape’ Hospital Foyer
B10-CS-204
Please read these instructions fully before starting construction.
PVA or equivalent glue will be required to stick sections together.
Sand paper can be used to gently clean any joints.
A sharp modelling knife will be required to remove sections from the sprue. Please use knives with due
care and remember to cut away from yourself at all times.
During the construction of this model, you may find it convenient to use pegs / elastic bands to hold
pieces in place while you allow glue to dry.
Foyer (B10-CS-204)
Start by removing the wall sections and internal
frame shown above from the sprue. Note the
walls sections are labelled ‘A’ to ‘F’ and run
clockwise starting from the long wall on the left
of the picture.
Glue walls ‘A’ to ‘D’ into place using the lugs provided.
Attach the foyer cover and bracer to wall section
‘E’ as shown.
Push the lugs of wall ‘E’ into those of ‘D’, along with
the lugs from the foyer roof and bracer – then push
wall ‘E’ so that it connects to the framework. Glue the
door section into place. Finally attach end wall ‘F’.
Apply some glue to the back of the wall covering
for ‘D’ and slide it over the foyer roof section (at
a slight angle to wall ‘D’. When it is in place, push
it flush to wall ‘D’.
Repeat the process for the wall covering for wall ‘E’,
then move round the building, gluing the coverings
into place.
Showing the coving for wall ‘A’.
10mm 5x5 ‘L-Shape’ Hospital Middle
B10-CS-256
Please read these instructions fully before starting construction.
PVA or equivalent glue will be required to stick sections together.
Sand paper can be used to gently clean any joints.
A sharp modelling knife will be required to remove sections from the sprue. Please use knives with due
care and remember to cut away from yourself at all times.
During the construction of this model, you may find it convenient to use pegs / elastic bands to hold
pieces in place while you allow glue to dry.
Mid-Section (B10-CS-256)
Remove walls ‘A’ to ‘F’ from the sprue, along with
the framework. Starting with wall ‘A’ glue them
to the framework, working clockwise around the
model. Leave to dry.
Attach the wall coverings to walls ‘D’, then ‘E’ before
attaching the rest of the wall coverings.
Remove the six rectangular supports from the
sprue and glue one to the back of each wall
section (at the base of the wall) as shown above.
The finished middle section.
10mm 5x5 ‘L-Shape’ Hospital Roof
B10-CS-305
Please read these instructions fully before starting construction.
PVA or equivalent glue will be required to stick sections together.
Sand paper can be used to gently clean any joints.
A sharp modelling knife will be required to remove sections from the sprue. Please use knives with due
care and remember to cut away from yourself at all times.
During the construction of this model, you may find it convenient to use pegs / elastic bands to hold
pieces in place while you allow glue to dry.
Roof Section (B10-CS-305)
Remove the roof piece and wall sections from the
sprue.
Starting with wall piece ‘A’ run clockwise around the
building adding side ‘B’, end ‘C’, side ‘D’, side E’ and
finally end ‘F’.
Now apply the wall covering to walls ‘D’ then E’
as shown above. Glue the other wall coverings
into place. Remove the sections of the lift from the sprue.
Glue together as shown above.
Then glue into place on the roof.
Finally, glue a rectangular support to the back of
each wall section at the base (see above).
The finished roof section.
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5

BLOTZ B10_CS_007 Assembly Instructions

Type
Assembly Instructions
This manual is also suitable for

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI