BEOVISION 4-85

Bang & Olufsen BEOVISION 4-85 Installation guide

  • Hello! I am an AI chatbot trained to assist you with the Bang & Olufsen BEOVISION 4-85 Installation guide. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
BeoVision 4-85
Installationguide for BeoVision 4-85, Floor Stand
Version 1.1
Introduction 2
Introduction
The aim for this guide is to assist the installer to attain a smooth and correct installation. The guide is intended as a guideline and may in certain
cases not be 100% relevant. However, the guide could be useful as a reference book to nd informations and dimensions about the products.
Content
The main content of the Installationguide describes the following:
- Precautions
- Assembly and installation of Floor Stand
- Mechanical specications for BeoVision 4-85, Floor Stand.
Important
! Since both the plasma panel and the stand are sizeable dimensions, it is strongly recommended to read the warning and precautions section
carefully. Otherwise there is major risk of damaging personnel or furnitures.
How to navigate this guide
When the guide is opened, it automatically opens in Full Screen Mode (can be left as desired - see below). This is primarily done to optimize the
usability of screen reading. There are several ways to navigate when using the guide, see the survey of keys, shortcuts and hotkeys below:
/ (arrow keys on the keyboard) navigates to the next page
/ (arrow keys on the keyboard) navigates to the previous page
Esc (Esc button ) exit Full Screen Mode (press CTRL + L to return to Full Screen Mode).
Another feature to optimize the navigation is the navigation icons in the bottom of the screen (see below for explanation).
Navigates you to the previous view
Navigates you directly to the start page
Navigates directly to the table of contents (theese are active links - click the link to be directed directly to the chapter)
Prints the document - the print dialog box opens (Ctrl + P also brings up this feature)
Furthermore to ease the navigation, this guide contains links. The links are mouseover active and marked with blue text. Just click on a page
reference to be transferred to that page.
Warning / Precautions 3
Warning
Before the installation is started it is strongly recommended to ensure the following:
! Ensure that the oor construction is strong enough to support long-term use. If its strenght becomes insufcient over the course of long-term use,
the product may tip over, and possible causing injury.
! Installation and removal should be carried out by qualied installers only. If the Floor Stand is installed incorrectly, the display may fall down, and
possible causing injury.
! Do not install in places which are subject to high humidity, dust, oil fumes, water vapour or excessive heat. These can have adverse effects on the
plasma display operation, and re or electric shocks may occur.
! Exercise caution when selecting the location for the display. It may discolor or deform due to light or heat if it is placed where it is exposed to direct
sunlight, or near a heater.
! Only moving company are allowed to lift or move the TV and Floor Stand.
Not technicians or installers.
Precautions
Before the installation is started it is strongly recommended to read this section carefully. The description is only intended as a guiding instruction
which may vary compared to the actual situation.
Edges of the items
The shape of BeoVision 4-85 and the oor stand may be considered as potential risks when they are free hanging items. Be aware of their
positions when they are free hanging in the active working area during the installation, to avoid getting injured.
Installation overview 4
Installation overview
Apart from the Floor Stand, the basic set-up of BeoVision 4-85 includes the
following items:
- BeoVision 4-85 PDP (Plasma Display Panel) incl. IR, ACM and shielding frames
- BeoSystem 3
- BeoLab 10
The Floor Stand installation includes:
- Floor Stand with motorised speaker bracket (incl. accessorie bags with e.g., EMC
caps, washers, screws etc.).
- Cabinet parts (TV cabinet, speaker cabinet and stand cabinet).
- Decorative plates.
- BeoLab 10 wall bracket (attached to the speaker bracket).
Floor Stand installation
Introduction
Warning/Precautions
Installation overview
Installation, Floor Stand
Installation, TV
Installing the TV on the
Floor Stand
Installing shielding
frames
Connection of cables to
the TV
Horizontal TV adjust
Assembly of cabinet parts
Connection of
BeoVision 4-85 /
BeoSystem 3
Installing BeoLab 10
Setting-up PDP settings
Installation on the
Japanese market
Technical specications
Installation overview 5
Weight
When the TV or the stand needs to be moved, a crane can be used (recommended). The items are too heavy to move and it is strongly
recommended to not attempt lifting them manually.
! Only moving company are allowed to lift or move the TV and Floor Stand. Not technicians or installers.
There is no requirements to which type of crane to use, but in order to attain a
smooth and safe operation, it is recommended to use a crane like this:
L = 95-135 cm, length of reach
H = 235 cm (height)
W = 98 cm (width)
Hw = 18 cm (height of wheels)
The weight of BeoVision 4-85 is approx. 145 kg and approx. 260 kg for the Floor Stand.
It is recommended to use a crane which is approved to handle loads up to
350 kg at L = 135 cm for Floor Stand installations (155 cm for wall bracket installations).
The reason is to ensure a safe and steady operation.
Environment
It is strongly recommended to pay attention to the environment where the installation is going to take place. It is very important that all kinds of
precautions are made to prevent damages to the environment (oors, walls, furnitures etc.).
Placement
Be sure that the surface where the product is going to be placed, is plane and the building design meets the required loads.
! It is very important that the oor is level, and all eight feets under the plate are correctly adjusted.
L
H
W
Hw
Installation, Floor Stand 6
Installation, Floor Stand
The elements in the Floor Stand installation consists of Floor Stand assembly () and TV placement ()
To ensure a smooth installation it is recommended to follow a structured procedure. Please follow the suggested procedure below:
- Place the Floor Stand in its packaging.
- Remove the Floor Stand packaging.
- Assemble the Floor Stand.
- Place the Floor Stand.
- Align the feets of the stand plate.
Placement of Floor Stand in packaging
The purpose of this step is to place the Floor Stand in its packaging in an appropriate place. The aim is to obtain as less movement of the Floor
Stand as possible, which is a great advantage when moving large objects.
It is prudent to conduct a test run of the transport without the Floor Stand mounted on the crane. See the example below:
When the test run seems to proceed sensible, place the Floor Stand in its packaging where planned.
! Be careful with covering the oor with protection materials to prevent damaging the surface. Although the package is sound, there
can be damage to the oor if not exercised great caution.
A
D
B
A
=
=
=
C
B
=
C
=
D
=
Wall
Floor Stand in packaging
Crane
Placement for Floor Stand
Necessary workspace
Assembly area
Installation, Floor Stand 7
Removal of Floor Stand packaging
When the product is placed in its packaging the next step is to remove the packaging parts. Follow the procedure below:
Assembly of Floor Stand
The Floor Stand is now ready for assembly. When the Floor Stand is assembled it is ready to be placed by a crane. Follow the procedure below:
> Unlock all clips in the packaging as shown and
carefully remove the packaging surfaces. >>> > Remove screws and transportation bars
from the packaging.
38 cm
> Place the transportation bars parallel with each other
(38 cm distance between the bars) in a suitable place. >>> > Hold and support the stand plate/decorative plate while
removing the transport belt.
> Remove the stand plate/decorative plate. Consider using a
crane and eye bolts for the purpose (due to heavy weight).
Installation, Floor Stand 8
! Be careful not to damage the cables and the cable holders with the lashing belt when the stand is lifted.
> Lift off the Floor Stand chassis from the packaging.
It is recommended to have at least one person steering the
crane and two persons steering the Floor Stand chassis to
prevent damaging the product.
> Pull the crane with the Floor Stand chassis away from the
packaging and move it to the stand plate.
> Place the oor stand plate on the top of the two bars
as shown. Assure that the assembly area under the
fortication points for the legs is sufcient.
>>>
> Fasten the frame of the floor stand to the crane with a
suitable lashing belt.
Installation, Floor Stand 9
> Before the Floor Stand placement is completed, connect the wire safely from
the stand plate to the wire from the stand leg (shown here).
Pull gently at the wire on the top of the tube before lowering the stand legs.
> Carefully place the two legs of the Floor Stand (move the guide pins into the
holes in the legs) to the stand plate.
! Again, it is recommended to be at least three persons to do the procedure.
One to operate the crane and two to place the two stand legs smooth and
precisely.
> When the stand legs are placed correctly mount and tighten the six screws
for each leg from the bottom side of the stand plate.
> Conrm that the screws are properly tightened.
Connector
Placement of Floor Stand
The two Floor Stand items are now rmly assembled and ready to be
moved.
> Lift the assembled Floor Stand, remove the transportation bars and
carefully move the Floor Stand to the preferred place.
> Lower the crane boom, remove the lashing belt and remove the crane.
TX30 (x12)
Installation, Floor Stand 10
Alignment of stand feets
> Adjust the eight feet under the stand plate to align the level of
the oor. Make sure that all of the eight feet are in contact with
the oor.
! It is very important that this alignment is performed correctly.
Otherwise the stability will not be sufcient for the tilt and turn
functions.
Removal of safety bolts
> Remove the two eyebolts for lifting from the stand plate.
> Remove the two safety bolts from the stand plate.
10 mm
Installation, TV 11
Installation, TV
Placement of TV in packaging
The purpose of this step is to place the BeoVision 4-85 in its packaging in an appropriate place. The aim is to obtain as less movement of the TV as
possible, which is a great advantage when moving large objects.
It is prudent to conduct a test run of the transport without the TV mounted on the crane. See the example below.
When the test run seems to proceed sensible, place the TV in its packaging where planned.
! Be careful with covering the oor with protection materials to prevent damaging the surface. Although the package is sound, there can be
damage to the oor if not exercised great caution.
A
D
B
CA =
D =
C =
B =
=
Wall
BV4-85 in packaging
Crane
BV4-85 mounted on Floor Stand
Necessary workspace
TV front side
Installation, TV 12
Removal of TV packaging
When the product is placed in its packaging the next step is to remove the packaging parts. Follow the procedure below:
> Remove the securing belts > Remove the top packaging > Remove the front packaging
> Remove the four frame parts > Remove the three foam parts > Remove sides and the back part
Installation, TV 13
Removal of TV from packaging
The TV is now free-standing and ready for transport. When the TV is removed and free from the packaging the plates and the EMC gaskets must
be installed. Follow the procedure below (depending of the crane type the procedure may vary):
> Mount the eyebolt in the centered thread hole as shown below:
> Place the crane in front of the TV and secure the crane claw to the eyebolt on the TV.
> Lift off the TV from the packaging
(it is recommended to have at least one person steering the crane and two persons steering the TV to prevent damaging the product).
> Pull the crane with the TV away from the packaging.
Installation, TV 14
Replacing stand hooks on TV
The next step is to remove the stand hooks (as delivered from factory).
This is necessary to be able to attach the TV to the Floor Stand.
Follow the procedure below:
AA
B
C
(x2) (x2)
A
B
C
10 mm 14 mm
> Mount the two eyebolt caps (L/R) from position A in position C
as shown.
> Mount the two new eyebolts (L/R) including the EMC washers
(position A) as shown.
> Mount the two new eyebolts (L/R) including the washers/EMC
washers (position B) as shown.
> Remove the two eyebolt caps (position A).
> Remove the four stand hooks (position B and C). >>>
*
(x2)
A
B
C
*
Installing the TV on the Floor Stand 15
Installing the TV on the Floor Stand
The TV is now ready to be installed on the Floor Stand. Move the crane with the TV to the Floor Stand.
> Move the position of the TV and align to t the four eyebolts to the mounting holes on the Floor Stand (see below).
! It is recommended to have at least one person steering the crane and two persons steering the TV to prevent damaging the product.
> Lower the crane arm carefully and release the hook
from the eyebolt.
> Remove the crane from the TV and remove the
eyebolt.
IMPORTANT!
> Mount the two safety bolts at the hinge points.
> Remove the two yellow transportation screws.
Installing shielding frames 16
Installing shielding frames
Install the four shielding frames (MDF supplied with the TV) in the following order:
Shielding frame
Screws
> Shielding frame top. > Shielding frame bottom.
>>> ! It is important that tongued and grooved ts perfectly.
> Shielding frame left/right. > Conrm correct wiring for auto contrast and camera (ACM)
> Tighten the 20 screws to lock the shielding frames.
>>>
Shielding frame
Connection of cables to the TV / Horizontal TV adjustment 17
Connection of cables to the TV
Connect the cables from the cable chain to the connectors on the TV:
Control/Camera module:
> HDMI cable - to BS3
> RS232 cable - to BS3
> 3D shutter out - to 3D socket
> Camera cable - from camera module
> IR-out cable - to BS3
> Auto contrast cable - from auto contrast
> IR/blast cable (3D) - from IR-bar
IR/blast cable:
Secure the cable with cable ties as shown.
Television mains inlet:
> Connect the mains cable to the TV.
Secure the cable with the clips as shown.
Horizontal TV adjustment
In some cases it might be necessary to adjust the position of the TV in
order to align the horizontal lines of the TV.
> Turn the adjustment screw to tilt the position of the TV.
(Left hinge point)
(Right hinge point)
TX45
Assembly of cabinet parts 18
Assembly of cabinet parts
Survey of mounted back covers:
Cabinet 3
Cabinet 1 (TV)
Cabinet 2
(Stand)
Cabinet 3
(Speaker)
Safety bolt /
inspection hatches
Safety bolt /
inspection hatches
Mains inlet
>>> Left Right
> Mount springs for the TV cabinet (from ‘Cabinet 1’ bag).
> Mount Cabinet 3 (speaker - use screws from ‘Cabinet 3’ bag).
> Mount the cable clamp as shown ).
TX25
TX30
Assembly of cabinet parts 19
Cabinet 2
> Lead the cable bundle (from the Floor Stand and the TV) through the
cable hole in the Stand cabinet.
> Turn the eccentric adjustment screw clock-/counterclockwise to move the
position of the knob in horizontal/vertical direction.
The aim is to obtain that ‘Ais equal to ‘B’.
Cabinet 1
Eccentric screw
A
B
> Mount Cabinet 1.
> Attach the wall bracket for BeoSystem 3 to the pre-drilled
holes on cabinet 2 and mount BeoSystem 3.
> Mount the two safety bolts for cabinet 1in the inspection holes.
TX30 (x2)
TX20 (x6)
> Mount the two inspection hatches (use the screws from the ‘Cabinet
2’ bag).
>>>
Connection of BeoVision 4-85 / BeoSystem 3 20
Connection of BeoVision 4-85 / BeoSystem 3
The next step is to connect the necessary cables to BeoSystem3, set-top boxes, to mains etc. Follow the procedure below:
> Connect the necessary cables (HDMI, Camera/IR, PowerLink, RS232, stand and mains cables) to BeoSystem 3.
> Connect the desired number of set-top boxes to the respective connections on BeoSystem3.
For further information please refer to BeoSystem 3 Installation Guide (can be downloaded from Bang & Olufsen Retail System / BeoWise).
> Attach the BeoSystem 3 cable cover to BeoSystem 3 and tilt to vertical position.
Connect the product to the mains
Connect the two mains cables to the Floor Stand as shown below.
AC Inlet
> Secure the cables to the cable clamp
> Mains inlet type C 8, 110 - 230 V AC depending of market variants .
> Mains inlet type C14, 200 - 240V AC depending of market variants .
! On markets where mains supply is 100-120V, a special mains installation is required to convert the mains supply to 200/240V (x2 live connections).
The supplied mains cord and plug are specially designed for the television. If you change the plug or in any way damage the mains cord, it will
affect the TV picture adversely.
! For installation on the Japanese market see page 23.
> Connect the two mains cables from the stand to the mains (wall plug) and switch on BeoVision 4-85 by pressing TV (await the product to start up).
Disconnect the product from the mains
The next step is to attach BeoLab 10 to the speaker bracket. Before this is done, due to safety reasons, the product must be disconnected from the
mains.
- While the TV is still ON (in lifted position), disconnect the two mains cables from the mains (wall plug).
/