Eaton PRL1a and 2a panelboard TVSS unit removal and SPD Installation guide

Type
Installation guide
Contents
Description Page
1: Introduction ...........................2
2: Visor and CVL/SML Disassembly Instructions 2
3: SPD Series Unit Installation Instructions . . . . . 3
Effective March 2010
Instruction Manual IM01005033E
PRL1a and 2a Panelboard TVSS Unit
Removal and SPD Installation Instructions
2
Instruction Manual IM01005033E
Effective March 2010
PRL1a and 2a Panelboard TVSS Unit
Removal and SPD Installation Instructions
EATON CORPORATION www.eaton.com
Section 1: Introduction
These instructions will guide you through the process of replacing an
existing Eaton Visor, CVL, or SML transient voltage surge suppressor
(TVSS) unit with an SPD Series surge protective device (SPD). These
instructions are specific to the replacement of those devices when
integrated within an Eaton PRL1a or 2a panelboard. Because SPD’s
vary in application (bus connected versus interfaced through a circuit
breaker, 3-phase versus single-phase, etc), the pictures utilized in
this document may not be reflective of your specific application.
Please read all instructions carefully as you perform each step. If
you require any support throughout the replacement process, please
contact the Eaton Technical Resource Center at 1-800-809-2772,
Option 4, Option 2.
1.1 PRL1a and 2a Panelboard Preparation
DANGER
HAZARDOUS VOLTAGES WILL CAUSE SEVERE INJURY OR DEATH. TURN
OFF ALL POWER SUPPLYING THE PANELBOARD BEFORE REMOVING THE
TVSS UNIT AND INSTALLING THE REPLACEMENT SPD. USE A METER TO
ENSURE THAT NO VOLTAGE IS PRESENT IN THE PANELBOARD BEFORE
MOVING FORWARD WITH THESE INSTRUCTIONS.
1. Remove the panelboard trim and hardware. Keep the trim and
hardware for re-installation.
2. Identify the TVSS unit that is to be removed and replaced. If it is
a Visor, move to Section 2.1. If it is a CVL/SML, move to
Section 2.2.
Section 2: Visor and CVL/SML Disassembly
Instructions
2.1 Visor Disassembly Instructions
ote:N Refer to Figure 1 while performing all Visor disassembly steps.
1. Remove Item 14 (dead front cover - attached by four screws).
Figure 1. Visor Disassembly Reference Drawing.
2. Remove panelboard dead front cover assembly and hardware.
Keep deadfront cover assembly and hardware for re-installation.
3. If the Visor unit is mounted directly to the electrical bus, remove
Item 11 screws (three places for 3-phase units, two places for
single-phase units) and move to Step 5. If it is a Visor interfaced
via a circuit breaker, move to Step 4.
4. Visors interfaced to the system via a circuit breaker will have
either two wires (single-phase units) or three wires (3-phase
units) connected between the unit and a circuit breaker.
Disconnect these wires from the circuit breaker.
5. Remove Item 15 screw (two places). These screws affix the neu-
tral wire (white/gray) and ground wire (green) to the Visor. Note
that Item 15 (and the corresponding neutral and ground wire con-
nections) may be located on either side of the Visor. Disconnect
the neutral wire (if present) from the panelboard neutral assem-
bly.
6. Remove Item 10 screw (two places) and remove the Visor assem-
bly from the panelboard. Remove each Item 5 bracket by remov-
ing Item 9 screw (two places). Discard all hardware and miscel-
laneous parts removed during the process.
ote:N There are two bus supports (Item 6) located eight inches apart in the
area from which the Visor was removed. This is the area in which the new
SPD must be installed.
3
Instruction Manual IM01005033E
Effective March 2010
PRL1a and 2a Panelboard TVSS Unit
Removal and SPD Installation Instructions
EATON CORPORATION www.eaton.com
2.2 CVL/SML Disassembly Instructions
ote:N Refer to Figure 2 while performing all CVL/SML disassembly steps.
1. Remove Item 4 (dead front cover - attached by four screws).
Figure 2. CVL/SML Disassembly Reference Drawing.
2. Remove panelboard deadfront cover assembly and hardware.
Keep deadfront cover assembly and hardware for re-installation.
3. CVL/SML units will have either two wires (single-phase units) or
three wires (3-phase units) connected between the unit and a
circuit breaker. Disconnect these wires from the circuit breaker.
Also, disconnect the neutral wire (white/gray) from the panel-
board neutral assembly and ground wire (green) from the panel-
board ground assembly.
4. Remove Item 9 screw (four places) and remove the CVL/SML
unit from the panelboard assembly.
ote:N There are two bus supports (Item 1) located seven inches apart in the
area from which the CVL/SML was removed. This is the area in which the
new SPD must be installed.
Section 3: SPD Series Unit Installation
Instructions
ote:N If SPD is to be interfaced via a circuit breaker, skip to Step 5 in this
section. If SPD is to be direct bus mounted, go to Step 1 in this section.
1. Refer to Figure 3 for orientation of the Item 2 bracket. Locate the
Item 2 bracket per Figure 4 “bracket to rail” dimensions. Attach
each Item 2 bracket using two pieces of Item 8 screw.
Figure 3. SPD Installation Reference Drawing.
Figure 4. SPD Direct Bus Mounted Dimensions.
 
 
 
 
DRAFTER MODEL FILENAME
ENGINEER
MFG. ENG.
NEXT ASSY
TOOL REF.
REFERENCE
SHOP/GENERAL ORD ER NO.
ENGINEERING CHA NGE NOTICE NO.
UNLESS SPECIFIE D TOLERANCES PER
THIS DO CUME NT, IN CLU DING THE DRA WING AND INFO RMA TION
CO NTAIN ED TH ER EON, IS CO NFID ENT IAL AN D IS THE EXCL USI VE
PRO PER TY O F EA TON CORP ORA TION, AND IS M ERE LY ON LOA N
AND SUBJ ECT TO RECAL L BY EAT ON C ORPO RAT ION A T AN Y TI ME.
BY T AKIN G PO SSE SSIO N OF THIS DOCU MEN T, TH E RE CIPIE NT A CKNO WLE DGE S AND AGR EES THAT
THIS DO CUME NT CA NN OT B E USE D IN A NY M ANN ER A DVE RSE TO T HE IN TER ESTS OF E ATO N, AN D
THA T NO PO RTION OF THIS D OCU MEN T MA Y BE COPI ED O R O THER WISE RE PROD UCED W ITH OUT
THE PRIO R W RITTE N C ONSE NT OF EA TON COR POR ATION . IN THE CASE OF CON FLIC TING
CO NTRA CTUA L PRO VIS IONS, THIS NOT ICE SHALL GOV ERN THE STA TUS O F TH IS DO CUM ENT .
EATON CORPORATION - CONFIDENTIAL AND PROPRIETARY
DATE
DATE
DATE
MODEL REV
SCALE PROJECT NO.
PRODUCT
DWG NO.
PARTS LIST REV
TITLE BLOCK REV - 4
TITLE
SHEET OF
THIRD ANGLE
PROJECTION
C
1 3
DSF
RBH
3/16/2009
3/30/2009
42C3240G03.iam
1
_
NTS
3376
42C3240
142C3240
PRL1A/2A
ASSEMBLY, SPD, BUS CONN
DIMENSIONS TO BE INTERPRETED
ASME Y14.5M - 1994
IN ACCORDANCE WITH
2
2
1 SPD TO BE INSTALLED DIRECTLY ADJACENT TO MAIN
INCOMING DEVICE.
1
REVISION HISTORY
1
1
14
2
9
8
.000
(BUS SUPPORT)
2.000 (3)
(DEVICE TO BUS)
3.500 (2)
(BRACKET TO RAIL)
4.000 (2)
(BRACKET TO RAIL)
7.000
(BUS SUPPORT)
11
5
12
REF. SPD (200KA
MAX SURGE RATING)
Main Bus
Thickness
1.250
SCREW
LENGTH
REQUIRED
0.250
0.500
0.375
1.125
1.250
MAIN BUS
POSITION
(PHASE)
CENTER
LEFT OR RIGHT
CENTER
0.125
0.133
(AL "T" BAR)
0.1875
LEFT OR RIGHT
CENTER
LEFT OR RIGHT 0.875
1.250
0.875
Refer to the following chart
to determine the length of screw required:
0.625
LEFT OR RIGHT
CENTER
LEFT OR RIGHT
CENTER
LEFT OR RIGHT
CENTER
LEFT OR RIGHT
CENTER
1.125
1.375
1.125
1.625
1.250
1.625
1.375
1.625
SCREW
STYLE
NUMBER
70010RBB8M
70010RBB8R
70010RBB8M
70010RBB8R
70010RBB8Q
70010RBB8R
70010RBB8Q
70010RBB8S
70010RBB8Q
70010RBB8U
70010RBB8R
70010RBB8U
70010RBB8S
70010RBB8U
15
REFERENCE TOP OF PANEL
.000
(BUS SUPPORT)
.484
(COVER)
6.484
(COVER)
7.000
(BUS SUPPORT)
2.000 (3)
(DEVICE TO BUS)
3.500 (2)
(BRACKET TO RAIL)
4.000 (2)
(BRACKET TO RAIL)
.000
(BUS SUPPORT)
.516
(COVER)
7.000
(BUS SUPPORT)
7.484
(COVER)
2.000 (3)
(DEVICE TO BUS)
3.500 (2)
(BRACKET TO RAIL)
4.000 (2)
(BRACKET TO RAIL)
13
13
TOP INCOMING
BOTTOM INCOMING
REFERENCE TOP OF PANEL
REFERENCE TOP OF PANEL
4
Instruction Manual IM01005033E
Effective March 2010
PRL1a and 2a Panelboard TVSS Unit
Removal and SPD Installation Instructions
EATON CORPORATION www.eaton.com
2. Connect the Item 1 bracket to each side of the SPD with two
pieces of Item 14 screw. Refer to Figure 3 for the Item 1 bracket
orientation.
3. For 3-phase applications, ensure that the B-phase bus adapter
as shown in Figure 5 is present. Locate the SPD per Figure 4
“device to bus” dimensions ensuring that holes in the Item 2
bracket and the Item 1 bracket align. Start the Item 9 screws per
Figure 3, but do not tighten them at this time.
Figure 5. B-Phase Bus Adapter.
4. Install the bus mounting screws (Item 10) per Figure 6. For
3-phase applications, all three screws (Item 10) will be required,
one per phase – A, B, C. For single-phase applications, only two
screws (Item 10) will be required, one per phase – A & C. Ensure
the bus connections screws (Item 10) are properly torqued1
. Do
not over tighten them. Then, tighten the Item 9 screw at SPD
bracket, one on each side. Move to Step 9 in this section.
REAR VIEW
 
 
 
 
DWG NO
MODEL REV
SHEET OF
TITLE
ALL REV. NOTES
LISTED ON SHT. 1
REVMODEL FILENAME T.BLK
REV-4
C
42C3240
2 3 1
ASSEMBLY, SPD, BUS CONN
PRL1A/2A
42C3240G03.iam 1
"B" PHASE BUS ADAPTER (PROVIDED BY SPD
SUPPLIER) IS REQUIRED FOR ALL 3 PHASE
APPLICATIONS.
"B" PHASE ADAPTER (OMITTED BY SPD SUPPLIER) IS
NOT REQUIRED FOR SINGLE PHASE APPLICATIONS.
3
4
0.125
0.375
CENTER 1.250
0.250
0.133
(AL "T" BAR)
0.1875 CENTER
LEFT OR RIGHT
CENTER
LEFT OR RIGHT
1.250
0.875
1.250
0.875
0.500
LEFT OR RIGHT
MAIN BUS
POSITION
(PHASE)
BUS
THICKNESS
SCREW
LENGTH
REQUIRED
0.875
Refer to the following chart
to determine the length of screw required:
SCREW STYLE
NUMBER
70010RBB8M
70010RBB8R
70010RBB8M
70010RBB8R
70010RBB8M
70010RBB8R
70010RBB8P
70010RBB8S
70010RBB8Q
70010RBB8U
70010RBB8S
70010RBB8U
0.625 70010RBB8S
70010RBB8U
LEFT OR RIGHT
CENTER
LEFT OR RIGHT
CENTER
LEFT OR RIGHT
CENTER
LEFT OR RIGHT
CENTER
1.000
1.375
1.125
1.625
1.375
1.625
1.375
1.625
5
REF. "B" PHASE
BUS ADAPTER
10
Figure 6. Bus Mounting Screws.
REAR VIEW
 
 
 
 
DWG NO
MODEL REV
SHEET OF
TITLE
ALL REV. NOTES
LISTED ON SHT. 1
REVMODEL FILENAME T.BLK
REV-4
C
42C3240
2 3 1
ASSEMBLY, SPD, BUS CONN
PRL1A/2A
42C3240G03.iam 1
"B" PHASE BUS ADAPTER (PROVIDED BY SPD
SUPPLIER) IS REQUIRED FOR ALL 3 PHASE
APPLICATIONS.
"B" PHASE ADAPTER (OMITTED BY SPD SUPPLIER) IS
NOT REQUIRED FOR SINGLE PHASE APPLICATIONS.
3
4
0.125
0.375
CENTER 1.250
0.250
0.133
(AL "T" BAR)
0.1875 CENTER
LEFT OR RIGHT
CENTER
LEFT OR RIGHT
1.250
0.875
1.250
0.875
0.500
LEFT OR RIGHT
MAIN BUS
POSITION
(PHASE)
BUS
THICKNESS
SCREW
LENGTH
REQUIRED
0.875
Refer to the following chart
to determine the length of screw required:
SCREW STYLE
NUMBER
70010RBB8M
70010RBB8R
70010RBB8M
70010RBB8R
70010RBB8M
70010RBB8R
70010RBB8P
70010RBB8S
70010RBB8Q
70010RBB8U
70010RBB8S
70010RBB8U
0.625 70010RBB8S
70010RBB8U
LEFT OR RIGHT
CENTER
LEFT OR RIGHT
CENTER
LEFT OR RIGHT
CENTER
LEFT OR RIGHT
CENTER
1.000
1.375
1.125
1.625
1.375
1.625
1.375
1.625
5
10
5
Instruction Manual IM01005033E
Effective March 2010
PRL1a and 2a Panelboard TVSS Unit
Removal and SPD Installation Instructions
EATON CORPORATION www.eaton.com
5. Refer to Figure 3 for orientation of the Item 2 bracket. Locate
the Item 2 bracket per Figure 7 “bracket to rail” dimensions.
Attach the Item 2 bracket using two pieces of the Item 8 screw.
Figure 7. SPD Interfaced Via Circuit Breaker Dimensions.
6. Connect the Item 1 bracket to each side of the SPD with two
pieces of the Item 14 screw. Refer to Figure 3 for the Item 1
bracket orientation. Connect the Item 1 bracket to the Item 2
bracket using the Item 9 screw, one on each side.
7. Connect and torque2 the SPD phase wires into the circuit
breaker lugs.
ote:N SPD phase wires are labeled appropriately according to the intended
application (3-phase [Phase A, Phase B, and Phase C] versus single-phase
[Phase A and Phase C]). The phase wires of the SPD must be terminated
into the corresponding pole of the circuit breaker disconnect.
8. Locate the neutral assembly in the panelboard. Refer to Figure 8
and install the neutral wire (Item 4 - gray) to the side of the SPD
closest to the neutral bar using the Item 9 screw and torque3.
ote:N The word “neutral’ is denoted on the SPD’s enclosure. Be sure that
only one neutral connection is made to the SPD. Cut any extra wire length,
strip the end, terminate wire, and torque1 at the panelboard neutral assembly.
Figure 8. Neutral and Ground Wires.
 
 
 
 
DWG NO
MODEL REV
SHEET OF
TITLE
ALL REV. NOTES
LISTED ON SHT. 1
REVMODEL FILENAME T.BLK
REV-4
C
42C3240
3 3 1
ASSEMBLY, SPD, BUS CONN
PRL1A/2A
42C3240G03.iam 1
6 FACTORY CONNECTION OF NEUTRAL/GROUND WIRE TO
BE TERMINATED TO SPD AT THIS LOCATION.
7 FIELD CONNECTION OF NEUTRAL/GROUND WIRE TO
PANELBOARD NEUTRAL/GROUND BUS TO BE MADE IN
FIELD BY OTHERS.
REF. SPD (200KA
MAX SURGE RATING)
9
7
6
3
4
13
TOP INCOMING
BOTTOM INCOMING
REFERENCE TOP OF PANEL
REFERENCE TOP OF PANEL
99
REF. SPD (200KA
MAX SURGE RATING)
6
Instruction Manual IM01005033E
Effective March 2010
PRL1a and 2a Panelboard TVSS Unit
Removal and SPD Installation Instructions
EATON CORPORATION www.eaton.com
9. Locate the ground assembly in the panelboard. Refer to Figure
8 and install the ground wire (Item 3 - green) to the side of
the SPD closest to the ground bar using the Item 9 screw and
torque3.
ote:N The word “ground’ is denoted on the SPD’s enclosure. Be sure that
only one ground connection is made to the SPD. Cut any extra wire length,
strip the end, terminate wire, and torque1 at the panelboard ground
assembly.
10. Reinstall panelboard deadfront cover assembly.
11. For VISOR Replacement Only: Install the one inch blank dead
front cover at bottom of dead front cover opening using two
pieces of the Item 9 screw.
12. Select and install the appropriate Item 13 dead front cover (two
supplied) using four Item 9 screws. Reference Figure 4 (direct
bus mounted applications) or Figure 7 (interfaced via a circuit
breaker applications) for orientation and location of the dead front
cover as needed.
13. Refer to Figure 9 and install the items 6 and 7 labels on the SPD
dead front cover.
Figure 9. Label Locations.
14. Install any other items that were removed during the disassem-
bly process and reapply power to the panelboard. Ensure that
all indicator lights on the SPD Series are green and the audible
alarm is not active. If there is a problem, check all connections
and verify that proper phase voltages are present. If all connec-
tions and voltages are verified and problems still exist, please
contact the Eaton Technical Resource Center at 1-800-809-2772,
Option 4, Option 2.
Footnotes:
1 – Refer to the panelboard torque label (located on panelboard dead
front cover) for torque requirements.
2 – Refer to the circuit breaker marking for torque requirements.
3 – Refer to the SPD marking for torque requirements.
 
 
 
 
DWG NO
MODEL REV
SHEET OF
TITLE
ALL REV. NOTES
LISTED ON SHT. 1
REVMODEL FILENAME T.BLK
REV-4
C
42C3240
3 3 1
ASSEMBLY, SPD, BUS CONN
PRL1A/2A
42C3240G03.iam 1
6 FACTORY CONNECTION OF NEUTRAL/GROUND WIRE TO
BE TERMINATED TO SPD AT THIS LOCATION.
7 FIELD CONNECTION OF NEUTRAL/GROUND WIRE TO
PANELBOARD NEUTRAL/GROUND BUS TO BE MADE IN
FIELD BY OTHERS.
77
REF. SPD (200KA
MAX SURGE RATING)
9
7
6
3
4
13
TOP INCOMING
BOTTOM INCOMING
REFERENCE TOP OF PANEL
REFERENCE TOP OF PANEL
99
REF. SPD (200KA
MAX SURGE RATING)
7
Instruction Manual IM01005033E
Effective March 2010
PRL1a and 2a Panelboard TVSS Unit
Removal and SPD Installation Instructions
EATON CORPORATION www.eaton.com
Notes:
Instruction Manual IM01005033E
Effective March 2010
PRL1a and 2a Panelboard TVSS Unit
Removal and SPD Installation Instructions
Eaton Corporation
Electrical Group
1000 Cherrington Parkway
Moon Township, PA 15108
United States
877-ETN-CARE (877-386-2273)
Eaton.com
© 2010 Eaton Corporation
All Rights Reserved
Printed in USA
Publication No. IM01005033E / TBG000313
March 2010
PowerChain Management is a registered
trademark of Eaton Corporation.
All other trademarks are property of their
respective owners.
This Instruction Manual is published solely for information purposes
and should not be considered all-inclusive. If further information is
required, you should consult an authorized Eaton sales representa-
tive.
The sale of the product shown in this literature is subject to the
terms and conditions outlined in appropriate Eaton selling policies
or other contractual agreement between the parties. This literature
is not intended to and does not enlarge or add to any such contract.
The sole source governing the rights and remedies of any purchaser
of this equipment is the contract between the purchaser and Eaton.
NO WARRANTIES, EXPRESSED OR IMPLIED, INCLUDING
WARRANTIES OF FITNESS FOR A PARTICULAR PURPOSE OR
MERCHANTABILITY, OR WARRANTIES ARISING FROM COURSE
OF DEALING OR USAGE OF TRADE, ARE MADE REGARDING
THE INFORMATION, RECOMMENDATIONS, AND DESCRIPTIONS
CONTAINED HEREIN. In no event will Eaton be responsible to the
purchaser or user in contract, in tort (including negligence), strict
liability or otherwise for any special, indirect, incidental or conse-
quential damage or loss whatsoever, including but not limited to
damage or loss of use of equipment, plant or power system, cost
of capital, loss of power, additional expenses in the use of existing
power facilities, or claims against the purchaser or user by its cus-
tomers resulting from the use of the information, recommendations
and description contained herein.
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8

Eaton PRL1a and 2a panelboard TVSS unit removal and SPD Installation guide

Type
Installation guide

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI