Rohde&Schwarz RTP User manual

Type
User manual
R&S®RTO-K26/-K27, R&S®RTO6-
K26/-K27, R&S®RTP-K26/-K27
D-PHY Compliance Test
User Manual
1326101002
Version 09
(=J::2)
This manual describes the D-PHY compliance test procedures with the following option:
R&S®RTO-K26 (1317.5668.02) - D-PHY
R&S®RTO6-K26 (1801.6958.02) - D-PHY
R&S®RTP-K26 (1337.8727.02) - D-PHY
R&S®RTO-K27 (1803.6584.02) - D-PHY 2.5
R&S®RTO6-K27 (1803.6578.02) - D-PHY 2.5
R&S®RTP-K27 (1800.5993.02) - D-PHY 2.5
The tests require the R&S ScopeSuite software.
The software contained in this product uses several valuable open source software packages. For information, see the "Open
Source Acknowledgment" document, which is available for download from the R&S RTO/RTO6/RTP product page at http://
www.rohde-schwarz.com/product/rto.html > "Software".
Rohde & Schwarz would like to thank the open source community for their valuable contribution to embedded computing.
© 2023 Rohde & Schwarz
Muehldorfstr. 15, 81671 Muenchen, Germany
Phone: +49 89 41 29 - 0
Internet: www.rohde-schwarz.com
Subject to change – data without tolerance limits is not binding.
R&S® is a registered trademark of Rohde & Schwarz GmbH & Co. KG.
MIPI® marks and logos are service marks owned by MIPI Alliance, Inc. and any use of such marks by Rohde & Schwarz is under
license.
All other trademarks are the properties of their respective owners.
1326.1010.02 | Version 09 | R&S®RTO-K26/-K27, R&S®RTO6-K26/-K27, R&S®RTP-K26/-K27
The following abbreviations are used throughout this manual: R&S®RTO is abbreviated as R&S RTO, R&S®RTP is abbreviated as
R&S RTP and R&S®ScopeSuite is abbreviated as R&S ScopeSuite.
Contents
R&S®RTO-K26/-K27, R&S®RTO6-K26/-K27, R&S®RTP-K26/-K27
3User Manual 1326.1010.02 ─ 09
Contents
1 R&S ScopeSuite overview.....................................................................5
2 Preparing the measurements................................................................7
2.1 Test equipment..............................................................................................................7
2.2 Installing software and license.................................................................................... 7
2.3 Setting up the network................................................................................................. 8
2.4 Starting the R&S ScopeSuite....................................................................................... 9
2.5 Connecting the R&S RTO/RTO6/RTP.......................................................................... 9
2.6 Report configuration...................................................................................................11
3 Performing tests...................................................................................12
3.1 Starting a test session................................................................................................12
3.2 Configuring the test.................................................................................................... 13
3.2.1 General test settings..................................................................................................... 14
3.3 Getting test results..................................................................................................... 16
4 D-PHY compliance tests......................................................................18
4.1 Starting D-PHY compliance tests.............................................................................. 20
4.2 Test configuration for D-PHY..................................................................................... 20
4.3 Data lane LP-TX signaling requirements (Group 1)................................................. 24
4.3.1 Test setup......................................................................................................................25
4.3.2 Performing Group 1 test cases..................................................................................... 26
4.3.3 Measurements.............................................................................................................. 27
4.4 Clock lane LP-TX signaling requirements (Group 2)............................................... 36
4.4.1 Test setup......................................................................................................................37
4.4.2 Performing Group 2 test cases..................................................................................... 38
4.4.3 Measurements.............................................................................................................. 39
4.5 Data lane HS-TX signaling requirements (Group 3).................................................46
4.5.1 Test setup......................................................................................................................46
4.5.2 Performing Group 3 test cases..................................................................................... 50
4.5.3 Measurements.............................................................................................................. 51
4.6 Clock lane HS-TX signaling requirements (Group 4)...............................................69
4.6.1 Test setup......................................................................................................................70
Contents
R&S®RTO-K26/-K27, R&S®RTO6-K26/-K27, R&S®RTP-K26/-K27
4User Manual 1326.1010.02 ─ 09
4.6.2 Performing Group 4 test cases..................................................................................... 73
4.6.3 Measurements.............................................................................................................. 74
4.7 HS-TX clock-to-data lane timing requirements (Group 5)....................................... 98
4.7.1 Test setup......................................................................................................................99
4.7.2 Performing Group 5 test cases................................................................................... 101
4.7.3 Measurements............................................................................................................ 102
4.8 Eye test.......................................................................................................................112
4.8.1 Test setup.................................................................................................................... 112
4.8.2 Performing Eye test cases...........................................................................................113
4.8.3 Measurements.............................................................................................................114
R&S ScopeSuite overview
R&S®RTO-K26/-K27, R&S®RTO6-K26/-K27, R&S®RTP-K26/-K27
5User Manual 1326.1010.02 ─ 09
1 R&S ScopeSuite overview
The R&S ScopeSuite software is used with R&S RTO/RTO6/RTP oscilloscopes. It can
be installed on a test computer or directly on the oscilloscope. For system require-
ments, refer to the Release Notes.
The R&S ScopeSuite main panel has several areas:
"Settings": connection settings to oscilloscope and other instruments also default
report settings
"Compliance Tests": selection of the compliance test
"Demo": accesses demo test cases that can be used for trying out the software
without having a connection to an oscilloscope
: shift sideways to change the transparency of the dialog box
"Help": opens the help file, containing information about the R&S ScopeSuite con-
figuration
"About": gives information about the R&S ScopeSuite software
"Tile View": allows a personalization of the compliance test selection
You can configure which tests are visible in the compliance test section and which
are hidden, so that only the ones you use are displayed.
To hide a test from the "Compliance Tests" view, do one of the following:
R&S ScopeSuite overview
R&S®RTO-K26/-K27, R&S®RTO6-K26/-K27, R&S®RTP-K26/-K27
6User Manual 1326.1010.02 ─ 09
a) Right-click on the compliance test that you want to hide.
The icon of the test changes, see Figure 1-1. Now with a left click you can hide
the test.
Figure 1-1: Unpin icon
b) Click on "Title View" to show a list of the available test cases. By clicking a test
case in the show list, you can pin/unpin it from the main panel.
Preparing the measurements
R&S®RTO-K26/-K27, R&S®RTO6-K26/-K27, R&S®RTP-K26/-K27
7User Manual 1326.1010.02 ─ 09
2 Preparing the measurements
2.1 Test equipment
For D-PHY compliance tests, the following test equipment is needed:
R&S RTO/RTO6/RTP oscilloscope with 4 channels and at least 4 GHz bandwidth
For measuring the clock signal (+ and -): either 1 differential probe or 2 single-
ended probes with at least 4 GHz bandwidth. However, note that D-PHY Group 2
and Group 4 tests require 2 probes for the clock signal.
For measuring the data signal (+ and -): 2 probes with at least 4 GHz bandwidth
Available probes: R&S RT-ZD40 or R&S RT-ZM with a different probe tip selection.
R&S RTO/ RTO6 / RTP-K26 D-PHY compliance test option (required option, instal-
led on the oscilloscope)
R&S RTO/ RTO6 / RTP-K27 D-PHY compliance test option (required option, instal-
led on the oscilloscope)
For Eye Tests, the following options are needed:
For R&S RTP:
Option R&S RTP-K136 or R&S RTP-K137 Advanced eye analysis
For R&S RTO/ R&S RTO6:
R&S RTO/R&S RTO6-K91 (DDR3) or R&S RTO/R&S RTO6-K93 (DDR4)
Recommended test fixture for LP-TX tests: MIPI D-PHY Capacitive Load (CLOAD)
fixture from The University of New Hampshire InterOperability Laboratory (UNH-
IOL)
Recommended termination board for HS-TX tests: MIPI D-PHY Reference Termi-
nation Board (RTB) from The University of New Hampshire InterOperability Labora-
tory (UNH-IOL)
The free-of-charge R&S ScopeSuite software, which can be installed on a com-
puter or directly on the oscilloscope.
2.2 Installing software and license
The preparation steps are performed only once for each computer and instrument that
are used for testing.
Uninstall older versions of the R&S ScopeSuite
If an older version of the R&S ScopeSuite is installed, make sure to uninstall the old
version before you install the new one. You can find the version number of the current
installation in "Help" menu > "About". To uninstall the R&S ScopeSuite, use the Win-
dows " Control Panel" > "Programs".
Installing software and license
Preparing the measurements
R&S®RTO-K26/-K27, R&S®RTO6-K26/-K27, R&S®RTP-K26/-K27
8User Manual 1326.1010.02 ─ 09
For best operation results, we recommend that the installed firmware versions of the
R&S ScopeSuite and the oscilloscope are the same.
To install the R&S ScopeSuite
1. Download the latest R&S ScopeSuite software from the "Software" section on the
Rohde & Schwarz R&S RTO/RTO6/RTP website:
www.rohde-schwarz.com/product/rtp.html
www.rohde-schwarz.com/product/rto.html
2. Install the R&S ScopeSuite software:
On the computer that is used for testing, or
On the R&S RTO/RTO6/RTP.
For system requirements, refer to the Release Notes.
To install the license key on the R&S RTO/RTO6/RTP
When you got the license key of the compliance test option, enable it on the oscil-
loscope using [Setup] > "SW Options".
For a detailed description, refer to the R&S RTO/RTO6/RTP user manual, chapter
"Installing Options", or to the online help on the instrument.
2.3 Setting up the network
If the R&S ScopeSuite software runs on a test computer, the computer and the testing
oscilloscope require a LAN connection.
For some test cases, you need an additional instrument: arbitrary waveform generator
(AWG), vector network analyzer (VNA), or spectrum analyzer. These instruments can
be used in automatic or manual mode. For automatic testing, a LAN connection to the
additional instrument is required.
There are two ways of connection:
LAN (local area network): It is recommended that you connect to a LAN with DHCP
server. This server uses the Dynamic Host Configuration Protocol (DHCP) to
assign all address information automatically.
Direct connection of the instruments and the computer or connection to a switch
using LAN cables: Assign fixed IP addresses to the computer and the instruments
and reboot all devices.
To set up and test the LAN connection
1. Connect the computer and the instruments to the same LAN.
2. Start all devices.
3. If no DHCP server is available, assign fixed IP addresses to all devices.
4. Ping the instruments to make sure that the connection is established.
Setting up the network
Preparing the measurements
R&S®RTO-K26/-K27, R&S®RTO6-K26/-K27, R&S®RTP-K26/-K27
9User Manual 1326.1010.02 ─ 09
5. If VISA is installed, check if VISA can access the instruments.
a) Start VISA on the test computer.
b) Validate the VISA address string of each device.
See also:
Chapter 2.5, "Connecting the R&S RTO/RTO6/RTP", on page 9
2.4 Starting the R&S ScopeSuite
To start the R&S ScopeSuite on the test computer or on the oscilloscope:
Double-click the R&S ScopeSuite program icon.
To start the R&S ScopeSuite on the instrument, in the R&S RTO/RTO6/RTP firmware:
In the "Apps" dialog, open the "Compliance" tab.
2.5 Connecting the R&S RTO/RTO6/RTP
If the R&S ScopeSuite is installed directly on the instrument, the software detects the
R&S RTO/RTO6/RTP firmware automatically, and the "Oscilloscope" button is not
available in the R&S ScopeSuite.
If the R&S ScopeSuite software runs on a test computer, the computer and the testing
oscilloscope require a LAN connection, see Chapter 2.3, "Setting up the network",
on page 8. The R&S ScopeSuite software needs the IP address of the oscilloscope to
establish connection.
1. Start the R&S RTO/RTO6/RTP.
2. Start the R&S ScopeSuite software.
3. Click "Settings" > "Oscilloscope".
Connecting the R&S RTO/RTO6/RTP
Preparing the measurements
R&S®RTO-K26/-K27, R&S®RTO6-K26/-K27, R&S®RTP-K26/-K27
10User Manual 1326.1010.02 ─ 09
4. Enter the IP address of the oscilloscope.
To obtain the IP address: press the Rohde & Schwarz logo at the top-right corner
of the oscilloscope's display.
5. Click "Get Instrument Information".
The computer connects with the instrument and gets the instrument data.
Connecting the R&S RTO/RTO6/RTP
Preparing the measurements
R&S®RTO-K26/-K27, R&S®RTO6-K26/-K27, R&S®RTP-K26/-K27
11User Manual 1326.1010.02 ─ 09
If the connection fails, an error message is shown.
2.6 Report configuration
In the "Report Configuration" menu, you can select the format of the report and the
details to be included in the report. You can also select an icon that is displayed in the
upper left corner of the report.
Also, you can enter common information on the test that is written in the "General Infor-
mation" section of the test report.
Report configuration
Performing tests
R&S®RTO-K26/-K27, R&S®RTO6-K26/-K27, R&S®RTP-K26/-K27
12User Manual 1326.1010.02 ─ 09
3 Performing tests
3.1 Starting a test session
After you open a compliance test, the "Session Selection" dialog appears. In this dia-
log, you can create new sessions, open or view existing report.
The following functions are available for handling test sessions:
Function Description
"Add" Adds a new session
"Open" Opens the selected session
"Remove" Removes the selected session
"Rename" Changes the "Session Name"
"Comment" Adds a comment
"Show report" Generates a report for the selected session
To add a test session
1. In the R&S ScopeSuite window, select the compliance test.
2. In the "Session Selection" dialog press "Add".
3. If necessary change the "Session Name"
Starting a test session
Performing tests
R&S®RTO-K26/-K27, R&S®RTO6-K26/-K27, R&S®RTP-K26/-K27
13User Manual 1326.1010.02 ─ 09
To open a test session
1. In the R&S ScopeSuite window, select the compliance test.
2. In the "Session Selection" dialog, select the session you want to open and double
click on it.
Alternatively, select the session and press "Open".
To show a report for a test session
1. In the R&S ScopeSuite window, select the compliance test.
2. In the "Session Selection" dialog, select the session you want the report for and
press "Show report".
3.2 Configuring the test
1. In the R&S ScopeSuite window, select the compliance test to be performed:
"MIPI D-PHY"
2. Open a test session, see Chapter 3.1, "Starting a test session", on page 12.
3. Adjust the "Properties" settings for the test cases you want to perform.
4. Click "Limit Manager" and edit the limit criteria, see Chapter 3.2.1.1, "Limit man-
ager", on page 15.
5. If you want to use special report settings the "Report Config" tab to define the for-
mat and contents of the report. Otherwise the settings defined in "RSScopeSuite" >
"Settings" > "Report" are used. See Chapter 2.6, "Report configuration",
on page 11.
6. Click "Test Checked"/"Test Single" and proceed as described in the relevant test
case chapter.
Configuring the test
Performing tests
R&S®RTO-K26/-K27, R&S®RTO6-K26/-K27, R&S®RTP-K26/-K27
14User Manual 1326.1010.02 ─ 09
3.2.1 General test settings
Each session dialog is divided into several sections:
"Properties": shows the settings that can be made for the test case selected on the
left side of the dialog. You can differentiate between the "All" and the sub test prop-
erties
In the "All" > "Properties" tab you can configure the settings for all test cases in the
current session. Once you change and save a setting in this tab, the changes will
be done for all test in the sessions. At the same time, there will be a special mark-
ing for the functions that have different settings for different sub tests.
"Limit Manager": sets the measurement limits that are used for compliance testing,
see Chapter 3.2.1.1, "Limit manager", on page 15.
"Results": shows an overview of the available test results for this session.
"Instruments": defines instruments settings for connecting to external devices, that
are specific for this test session.
Configuring the test
Performing tests
R&S®RTO-K26/-K27, R&S®RTO6-K26/-K27, R&S®RTP-K26/-K27
15User Manual 1326.1010.02 ─ 09
When a session is first created the global settings ("RSScopeSuite" > "Settings" >
"Instruments") are copied to the session. This "Instruments" tab can be used to
change those copied defaults.
"Report Config": defines the format and contents of the report for this session.
When a session is first created the global settings ("RSScopeSuite" > "Settings" >
"Report") are copied to the session. This "Report Config" tab can be used to
change those copied defaults.
"Test Checked"/ "Test Single": starts the selected test group.
3.2.1.1 Limit manager
The "Limit Manager" shows the measurement limits that are used for compliance test-
ing.
Each limit comprises the comparison criterion, the unit, the limit value A, and a second
limit value B if the criterion requires two limits.
You can set the values to defaults, change the values in the table, export the table in
xml format, or import xml files with limit settings.
You can also return the values to the original limits with "Reset to default".
1. Select the "Test Type".
2. Check and adjust the measurement limits.
Configuring the test
Performing tests
R&S®RTO-K26/-K27, R&S®RTO6-K26/-K27, R&S®RTP-K26/-K27
16User Manual 1326.1010.02 ─ 09
3.3 Getting test results
For each test, the test data - report, diagrams and waveform files - is saved in the fol-
lowing folder:
%ProgramData%\Rohde-Schwarz\RSScopeSuite2\Sessions\D-PHY\
<Session_Name>
If you resume an existing session, new measurements are appended to the report,
new diagrams and waveform files are added to the session folder. Existing files are not
deleted or replaced. Sessions data remain until you delete them in the "Results" tab of
the session.
The report format can be defined in "RSScopeSuite" > "Settings" > "Report" for all
compliance tests (see also Chapter 2.6, "Report configuration", on page 11). If you
want to use special report settings for a session, you can define the format and con-
tents of the report in the "Report Config" tab of the session.
All test results are listed in the "Results" tab. Reports can be provided in PDF,
MSWord, or HTML format. To view and print PDF reports, you need a PDF viewer, for
example, the Acrobat Reader.
The test report file can be created at the end of the test, or later in the "Session Selec-
tion" dialog.
Getting test results
Performing tests
R&S®RTO-K26/-K27, R&S®RTO6-K26/-K27, R&S®RTP-K26/-K27
17User Manual 1326.1010.02 ─ 09
To show a test report
1. In the R&S ScopeSuite window, select the compliance test to be performed.
2. Select the session name in the "Session Selection" dialog and click "Show report".
The report opens in a separate application window, depending on the file format.
You can check the test results and print the report.
To delete the results, diagrams and waveform files of a session
1. In the "Session Selection" dialog select the session and open it.
2. In the "Results" tab, select the result to be deleted.
3. Click "Remove".
Getting test results
D-PHY compliance tests
R&S®RTO-K26/-K27, R&S®RTO6-K26/-K27, R&S®RTP-K26/-K27
18User Manual 1326.1010.02 ─ 09
4 D-PHY compliance tests
D-PHY Ethernet compliance tests require option R&S RTO/RTO6/RTP-K26.
The software closely follows the MIPI Alliance's Conformance Test Suite for D-PHY
Physical Layer Version 1.1 Revision 03, dated June 5th, 2013. Should anything
remain unclear in this manual, please refer to that CTS document, which is available
for members of the MIPI Alliance at https://members.mipi.org/wg/All-Members/home/
approved-specs.
Table 4-1: Overview of D-PHY compliance tests
Test Groups and Tests see
Group 1 (7 tests): Data Lane LP-TX Signaling Requirements
1.1.1 – Data Lane LP-TX Thevenin Output High Level Voltage (VOH)
1.1.2 – Data Lane LP-TX Thevenin Output Low Level Voltage (VOL)
1.1.3 – Data Lane LP-TX 15%-85% Rise Time (TRLP)
1.1.4 – Data Lane LP-TX 85%-15% Fall Time (TFLP)
1.1.5 – Data Lane LP-TX Slew Rate vs. CLOAD (δV/δtSR)
1.1.6 – Data Lane LP-TX Pulse Width of Exclusive-OR Clock (TLP-PULSE-TX)
1.1.7 – Data Lane LP-TX Period of Exclusive-OR Clock (TLP-PER-TX)
page
24
Group 2 (5 tests): Clock Lane LP-TX Signaling Requirements
1.2.1 – Clock Lane LP-TX Thevenin Output High Level Voltage (VOH)
1.2.2 – Clock Lane LP-TX Thevenin Output Low Level Voltage (VOL)
1.2.3 – Clock Lane LP-TX 15%-85% Rise Time (TRLP)
1.2.4 – Clock Lane LP-TX 85%-15% Fall Time (TFLP)
1.2.5 – Clock Lane LP-TX Slew Rate vs. CLOAD (δV/δtSR)
page
36
Group 3 (16 tests): Data Lane HS-TX Signaling Requirements
1.3.1 – Data Lane HS Entry: Data Lane TLPX Value
1.3.2 – Data Lane HS Entry: Data Lane THS-PREPARE Value
1.3.3 – Data Lane HS Entry: Data Lane THS-PREPARE + THS-ZERO Value
1.3.4 – Data Lane HS-TX Differential Voltages VOD(0) and VOD(1)
1.3.5 – Data Lane HS-TX Differential Voltage Mismatch ΔVOD
1.3.6 – Data Lane HS-TX Single-Ended Output Voltages VOHHS(DP) and VOHHS(DN)
1.3.7 – Data Lane HS-TX Static Common-Mode Voltages VCMTX(1) and VCMTX(0)
1.3.8 – Data Lane HS-TX Static Common-Mode Voltage Mismatch ΔVCMTX(1,0)
1.3.9 – Data Lane HS-TX Dynamic Common-Level Variations Between 50-450 MHz ΔVCMTX(LF)
1.3.10 – Data Lane HS-TX Dynamic Common-Level Variations Above 450 MHz ΔVCMTX(HF)
1.3.11 – Data Lane HS-TX 20%-80% Rise Time tR
1.3.12 – Data Lane HS-TX 80%-20% Fall Time tF
1.3.13 – Data Lane HS Exit: THS-TRAIL Value
1.3.14 – Data Lane HS Exit: 30%-85% Post-EoT Rise Time TREOT
1.3.15 – Data Lane HS Exit: TEOT Value
1.3.16 – Data Lane HS Exit: THS-EXIT Value
page
46
D-PHY compliance tests
R&S®RTO-K26/-K27, R&S®RTO6-K26/-K27, R&S®RTP-K26/-K27
19User Manual 1326.1010.02 ─ 09
Test Groups and Tests see
Group 4 (18 tests): Clock Lane HS-TX Signaling Requirements
1.4.1 – Clock Lane HS Entry: TLPX Value
1.4.2 – Clock Lane HS Entry: TCLK-PREPARE Value
1.4.3 – Clock Lane HS Entry: TCLK-PREPARE + TCLK-ZERO Value
1.4.4 – Clock Lane HS-TX Differential Voltages VOD(0) and VOD(1)
1.4.5 – Clock Lane HS-TX Differential Voltage Mismatch ΔVOD
1.4.6 – Clock Lane HS-TX Single-Ended Output Voltages VOHHS(DP) and VOHHS(DN)
1.4.7 – Clock Lane HS-TX Static Common-Mode Voltages VCMTX(1) and VCMTX(0)
1.4.8 – Clock Lane HS-TX Static Common-Mode Voltage Mismatch ΔVCMTX(1,0)
1.4.9 – Clock Lane HS-TX Dynamic Common-Level Variations Between 50-450 MHz ΔVCMTX(LF)
1.4.10 – Clock Lane HS-TX Dynamic Common-Level Variations Above 450 MHz ΔVCMTX(HF)
1.4.11 – Clock Lane HS-TX 20%-80% Rise Time tR
1.4.12 – Clock Lane HS-TX 80%-20% Fall Time tF
1.4.13 – Clock Lane HS Exit: TCLK-TRAIL Value
1.4.14 – Clock Lane HS Exit: 30%-85% Post-EoT Rise Time TREOT
1.4.15 – Clock Lane HS Exit: TEOT Value
1.4.16 – Clock Lane HS Exit: THS-EXIT Value
1.4.17 – Clock Lane HS Clock Instantaneous: UIINST Value
1.4.18 – Clock Lane HS Clock Delta UI: (ΔUI) Value
1.4.19 – TX Spread Spectrum Clocking (SSC) requirements
1.4.20 – Clock Lane HS Clock Period Jitter
page
69
Group 5 (4 tests): HS-TX Clock-to-Data Lane Timing Requirements
1.5.1 – HS Entry: TCLK-PRE Value
1.5.2 – HS Exit: TCLK-POST Value
1.5.3 – HS Clock Rising Edge Alignment to First Payload Bit
1.5.4 – Data-to-Clock Skew (TSKEW[TX])
1.5.5 – Initial HS Skew Calibration Burst TSKEWCAL-SYNC and TSKEWCAL
1.5.6 – Periodic HS Skew Calibration Burst TSKEWCAL-SYNC and TSKEWCAL
1.5.8 – Alternate calibration sequence TPREAMBLE and TALTCAL
1.5.9 – Preamble sequence TPREAMBLE and TEXTSYNC
1.5.10 – Clock and data lane TXHS-Idle THS IDLE-POST, THS-IDLE-CLKHS0, THS-IDLE-PRE
page
98
Eye Test
1.4.18 – Clock Lane HS Clock Delta UI: (ΔUI) Value
1.4.20 – Clock Lane HS Clock Period Jitter
1.5.7 – HS Data and Clock Eye Diagram
Any D-PHY configuration consists of at least one clock lane module, and one or sev-
eral data lane modules. Each module provides a synchronized connection between
master and slave. During normal operation, a lane switches between the modes "low
power" (LP) and "high speed" (HS). High speed functions are used for HS data trans-
mission in bursts with an arbitrary number of payload data bytes. Low power functions
D-PHY compliance tests
R&S®RTO-K26/-K27, R&S®RTO6-K26/-K27, R&S®RTP-K26/-K27
20User Manual 1326.1010.02 ─ 09
are mainly used for control, but have other optional use cases, like LP escape mode.
The presence of HS and LP functions is correlated.
Starting D-PHY compliance tests............................................................................20
Test configuration for D-PHY...................................................................................20
Data lane LP-TX signaling requirements (Group 1)................................................24
Clock lane LP-TX signaling requirements (Group 2)...............................................36
Data lane HS-TX signaling requirements (Group 3)............................................... 46
Clock lane HS-TX signaling requirements (Group 4)..............................................69
HS-TX clock-to-data lane timing requirements (Group 5).......................................98
Eye test................................................................................................................. 112
4.1 Starting D-PHY compliance tests
Before you run the test, complete the following actions:
Initial setup of the equipment, see Chapter 2.2, "Installing software and license",
on page 7
LAN connection of the oscilloscope and the computer running the R&S Scope-
Suite, see Chapter 2.5, "Connecting the R&S RTO/RTO6/RTP", on page 9
1. Select "D-PHY" in the R&S ScopeSuite start window.
2. In the "Session Selection" dialog, choose the D-PHY standard version.
You can select one of the following : "1.1", "1.2", "2.0", "2.1", "2.5".
3. Add a new test session and name it. See Chapter 3.1, "Starting a test session",
on page 12.
4. Open the test session.
5. Adjust the test configuration settings if necessary. See:
Chapter 3.2.1.1, "Limit manager", on page 15
Chapter 4.2, "Test configuration for D-PHY", on page 20
6. Select/check the test cases that you want to run and click "Test Single"/"Test
checked".
7. A step-by step guide explains the following individual setup steps. When you have
finished all steps of the step-by-step guide, the compliance test runs automatically.
4.2 Test configuration for D-PHY
The test configuration consists of the general configuration settings as described in
Chapter 3.2, "Configuring the test", on page 13, and some additional test-specific con-
figuration settings, described below:
Low-power properties for DUT lanes in low power (LP) mode, groups 1 and 2.
High speed for DUT lanes in high speed (HS) mode, groups 3, 4 and 5.
Test configuration for D-PHY
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16
  • Page 17 17
  • Page 18 18
  • Page 19 19
  • Page 20 20
  • Page 21 21
  • Page 22 22
  • Page 23 23
  • Page 24 24
  • Page 25 25
  • Page 26 26
  • Page 27 27
  • Page 28 28
  • Page 29 29
  • Page 30 30
  • Page 31 31
  • Page 32 32
  • Page 33 33
  • Page 34 34
  • Page 35 35
  • Page 36 36
  • Page 37 37
  • Page 38 38
  • Page 39 39
  • Page 40 40
  • Page 41 41
  • Page 42 42
  • Page 43 43
  • Page 44 44
  • Page 45 45
  • Page 46 46
  • Page 47 47
  • Page 48 48
  • Page 49 49
  • Page 50 50
  • Page 51 51
  • Page 52 52
  • Page 53 53
  • Page 54 54
  • Page 55 55
  • Page 56 56
  • Page 57 57
  • Page 58 58
  • Page 59 59
  • Page 60 60
  • Page 61 61
  • Page 62 62
  • Page 63 63
  • Page 64 64
  • Page 65 65
  • Page 66 66
  • Page 67 67
  • Page 68 68
  • Page 69 69
  • Page 70 70
  • Page 71 71
  • Page 72 72
  • Page 73 73
  • Page 74 74
  • Page 75 75
  • Page 76 76
  • Page 77 77
  • Page 78 78
  • Page 79 79
  • Page 80 80
  • Page 81 81
  • Page 82 82
  • Page 83 83
  • Page 84 84
  • Page 85 85
  • Page 86 86
  • Page 87 87
  • Page 88 88
  • Page 89 89
  • Page 90 90
  • Page 91 91
  • Page 92 92
  • Page 93 93
  • Page 94 94
  • Page 95 95
  • Page 96 96
  • Page 97 97
  • Page 98 98
  • Page 99 99
  • Page 100 100
  • Page 101 101
  • Page 102 102
  • Page 103 103
  • Page 104 104
  • Page 105 105
  • Page 106 106
  • Page 107 107
  • Page 108 108
  • Page 109 109
  • Page 110 110
  • Page 111 111
  • Page 112 112
  • Page 113 113
  • Page 114 114
  • Page 115 115
  • Page 116 116
  • Page 117 117

Rohde&Schwarz RTP User manual

Type
User manual

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI