Anova F1036VB Installation guide

Type
Installation guide

This manual is also suitable for

anovafurnishings.com
888.535.5005 tel
Installation Instructions
All Courtyard Benches Inground Installation
TOOLS AND SUPPLIES NEEDED:
Step-by-Step Installation Sequence
The posts need to be installed before assembling the Courtyard bench
Examine the footing or slab for damage or defects. The footing or slab should be reinforced concrete rated at a
3,000 psi minimum and be cured for at least 28 days prior to the installation of the benches.
CAUTION: Oversized holes and holes drilled too deep in the concrete will make it dicult to set the anchor.
!
Post Hole Digger Optional: Digging Iron Sledge Hammer Shovel 2" x 4"
Board
Level
Installation Instructions
Step-by-Step Installation Sequence
06/25/2019 Copyright 2019 ANOV Manufactured in the U.S.
Note: Please contact Customer Care at 1-866-797-1761 when ordering replacement parts.
2.
7. Check the concrete manufacturer's specications to see how long the
concrete needs to dry before proceeding to attach the remaining parts. Once
the concrete has properly set you may proceed with the assembly. Refer to
the Assembly Instructions at this point for further instructions.
3.
4.
5.
6.
Using a shovel place approximately six inches of gravel into the hole then
tamp it down with a 2"x4" board. Repeat this step one more time so there is a
total of 6" of gravel.
Place the post in the center of the hole. It should go down exactly 24.44". It
is necessary to set up a couple of braces to ensure the proper height and that
the post is level.
To do so hammer a couple of wood posts into the ground using a sledge
hammer and screw another post to each post using a drill. Then use clamps to
brace the posts together.
NOTE: When digging the hole it is recommended that it has a slight angle and
increases in size the farther down it goes. This helps prevent frost upheaval.
Mix the concrete in a wheel barrel to the manufacturer's specications.
NOTE: Check with a local contractor for the best option on how to pour
the concrete. Images 6.1 and 6.2 show two standard practices, but we still
recommend seeking out a local contractor.
Pour the concrete based on your local recommendation.
Dig out the holes for the posts using a post hole digger and a digging iron. The
minimum diameter of the hole should be 2.5". The depth of the hole should be
below the frost line to prevent shiing. 1 2
CAUTION: Call your local utility companies to mark where there are any
cables or pipelines before digging any holes.
!
Frost Line
6.1 6.2
1. Place the bench in its designated area and mark the spot with either string or
a post.
All Courtyard Benches Inground Installation
  • Page 1 1
  • Page 2 2

Anova F1036VB Installation guide

Type
Installation guide
This manual is also suitable for

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI