Toro Hot Oil Shuttle Kit, 2226 Directional Drill Installation guide

Type
Installation guide

Toro Hot Oil Shuttle Kit, 2226 Directional Drill enables efficient transfer of hot oil between the 2226 Directional Drill and external hot oil source. Easily installed using detailed instructions, the kit includes hoses, fittings, and manifold to seamlessly integrate with your equipment. Enhance productivity and optimize performance with Toro Hot Oil Shuttle Kit.

Toro Hot Oil Shuttle Kit, 2226 Directional Drill enables efficient transfer of hot oil between the 2226 Directional Drill and external hot oil source. Easily installed using detailed instructions, the kit includes hoses, fittings, and manifold to seamlessly integrate with your equipment. Enhance productivity and optimize performance with Toro Hot Oil Shuttle Kit.

FormNo.3426-279RevB
HotOilShuttleKit
2226DirectionalDrill
ModelNo.139-2475
InstallationInstructions
PartsList
1x1x1x
1x1x1x2x
4x2x2x1x
3x43cm(17-1/2inch)1x
45cm(18-1/2inch)1x84cm(33inch)1x
©2019—TheToro®Company
8111LyndaleAvenueSouth
Bloomington,MN55420
Registeratwww.T oro.com.
OriginalInstructions(EN)
PrintedintheUSA
AllRightsReserved
*3426-279*B
InstallingtheManifold
1.Movethemachinetoalevelsurface,shutofftheengine,removethekey,turnthebatterydisconnect
switchtotheOFFposition,andwaitfortheenginetocool;refertotheOperator’sManual.
g269652
Figure1
2.Installandhandtightenthettingsontothemanifold(Figure2).
g269651
Figure2
3.Installtheplugontothemanifold(Figure2)andtorqueto46to57N∙m(34to42ft-lbs).
2
4.Removeanddiscardtheboltsonthechargeltermount(BoxAofFigure3).
g269650
Figure3
5.Installthebracketusing4bolts(3/8inch)asshowninBoxBofFigure3.
6.Installthemanifoldandttingsontothebracketusing2bolts(1/4x2-3/4inches)and2nuts(1/4inch)as
showninBoxCofFigure3).
3
InstallingtheHoses
Installingthe84cm(33inch)Hose
1.Cutthecabletiesonthehoseguardandsettheguardaside(BoxAofFigure4).
2.Disconnectthehosefromthettingonthecasedrainhardline(BoxBofFigure4).
g269658
Figure4
3.Installthelargeteebetweenthettinganddisconnectedhose(BoxBofFigure4).
4.Installthe84cm(33inchhose)inportCDonthemanifoldandthetopoftheteetting(BoxCandDof
Figure4).
4
5.Torquethettings(Figure5):
Important:Supporttheteettingwithacrowsfootonalongextensionorfromthesidewitha
boardorhammerhandle.
Fittingonthemanifold:78to98N∙m(58to72ft-lb)
84cm(33inch)hoseinportCD:50to64N∙m(37to47ft-lb)
84cm(33inch)hoseconnectingtotheteetting:81to100N∙m(60to74ft-lb)
T eetting:81to100N∙m(60to74ft-lb)
Existinghoseconnectingtotheteetting:81to100N∙m(60to74ft-lb)
g270999
Figure5
1.Fittingonthemanifold4.Teetting
2.84cm(33inch)hoseinportCD5.Existinghoseconnectingtotheteetting
3.84cm(33inch)hoseconnectingtotheteetting
g271002
Figure6
6.Installthehoseguardusingthe3cableties(Figure6).
5
Installingthe43cm(17-1/2inch)Hose
1.Disconnectthehosefromtheupperhardlinegoingtotherotaryhydrostat(BoxAofFigure7).
2.Installasmallteebetweenthehardlinettingandthedisconnectedhose(BoxBofFigure7).
3.Connectthe43cm(17-1/2inch)hosetotheP2ttingtotheteetting(BoxCofFigure7).
g269654
Figure7
6
4.Torquethettings(Figure8):
Fittingonthemanifold:78to98N∙m(58to72ft-lb)
43cm(17-1/2inch)hoseinportP2:37to45N∙m(27to33ft-lb)
43cm(17-1/2inch)hoseconnectingtotheteetting:37to45N∙m(27to33ft-lb)
T eetting:37to45N∙m(27to33ft-lb)
Existinghoseconnectingtotheteetting:37to45N∙m(27to33ft-lb)
g271000
Figure8
1.Fittingonthemanifold4.Teetting
2.43cm(17-1/2inch)hoseinportP25.Existinghoseconnectingtotheteetting
3.43cm(17-1/2inch)hoseconnectingtotheteetting
7
Installingthe45cm(18-1/2inch)Hose
1.Disconnectthehosefromthelowerhardlinegoingtotherotaryhydrostat(BoxAofFigure9).
2.Installasmallteebetweenthehardlinettingandthedisconnectedhose(BoxBofFigure9).
3.Connectthe45cm(18-1/2inch)hosetotheP1ttingtotheteetting(BoxCofFigure9).
g269653
Figure9
8
4.Torquethettings(Figure10):
Fittingonthemanifold:20to26N∙m(15to19ft-lb)
45cm(18-1/2inch)hoseinportP1:37to45N∙m(27to33ft-lb)
45cm(18-1/2inch)hoseconnectingtotheteetting:37to45N∙m(27to33ft-lb)
T eetting:37to45N∙m(27to33ft-lb)
Existinghoseconnectingtotheteetting:37to45N∙m(27to33ft-lb)
g270998
Figure10
1.Fittingonthemanifold4.Teetting
2.45cm(18-1/2inch)hoseinportP15.Existinghoseconnectingtotheteetting
3.45cm(18-1/2inch)hoseconnectingtotheteetting
9
Notes:
Notes:
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12

Toro Hot Oil Shuttle Kit, 2226 Directional Drill Installation guide

Type
Installation guide

Toro Hot Oil Shuttle Kit, 2226 Directional Drill enables efficient transfer of hot oil between the 2226 Directional Drill and external hot oil source. Easily installed using detailed instructions, the kit includes hoses, fittings, and manifold to seamlessly integrate with your equipment. Enhance productivity and optimize performance with Toro Hot Oil Shuttle Kit.

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI