BOX INSTALLATION - STEP 1
LOCATE AND POSITION BOX IN ACCORDANCE WITH FLOOR
PLANS. TOP SURFACE OF TEMPORARY COVER MUST BE SET
RELATIVE TO THE HEIGHT OF THE FINISHED FLOOR - ie STONE,
WOOD OR CONCRETE - SEE TYPICAL INSTALLATION HEIGHTS.
LEVEL AND ANCHOR BOX AS REQUIRED. USE SCREWS, NAILS,
OR WIRE TO PREVENT BOX FROM FLOATING DURING POUR.
REMOVE AND RETAIN TEMPORARY COVER AND SCREWS.
ROUTE CONDUITS TO BOX AS REQUIRED. GANG BRACKET
SCREWS MUST BE IN PLACE AND BOTTOMED TO ENSURE
SCREW VOIDS AFTER POUR. PLACE THIS INSTALLATION GUIDE
BACK INTO BOX, ALONG WITH ALL SUPPLIED ITEMS, AND
REINSTALL TEMPORARY COVER.
BOX INSTALLATION - STEP 2
SCREED TO TOP OF BOX SURFACE FOR 3/16" THICK
CARPET/FLOORING OR SPECIFIC HEIGHT TO ALLOW
FOR THICKER FINISHED FLOOR MATERIAL. HAND
TROWELING RECOMMENDED NEAR BOX EDGES.
BOX HAS NO HEIGHT ADJUSTMENT AFTER
CONCRETE POUR.
FL-400 Floor Box Installation Instructions
INSTALLING ELECTRONIC COMPONENTS
PULL WIRES AND CABLES TO BOX AS NECCESSARY (REMOVAL OF
GANG MOUNTING BRACKETS MAY BE REQUIRED). TERMINATE
WIRES AND CABLES TO ELECTRONIC COMPONENTS, AND INSTALL
ELECTRONIC COMPONENTS ONTO GANG MOUNTING BRACKETS.
REINSTALL TEMPORARY COVER IF FINISHED COVER IS TO BE
INSTALLED AT A LATER DATE.
GANG DIVIDER ASSEMBLY
DIVIDER HOLDER MUST BE ORIENTED AS SHOWN WHEN ATTACHING
TO DIVIDERS, IN ORDER TO PROPERLY ASSEMBLE BOX INTERIOR.
POSITION DIVIDER ASSEMBLY IN BOX BEFORE INSTALLING
GANG PLATE ASSEMBLY. SECURE DIVIDER ASSEMBLY TO
GANG PLATE ASSEMBLY WITH SCREWS AS NOTED.
* GAP FILLERS ARE OPTIONAL, PER DESIRED
CONFIGURATION (SEE PREVIOUS PAGE),
AND ARE INSTALLED SIMILARLY TO
DIVIDER ASSEMBLIES.
(4) LEVELING BOLT
TEMPORARY
COVER
(8) #6-32 FLAT HEAD SCREW
CONCRETE SURFACE OR TOP
OF FINISHED FLOOR MATERIAL
FOR POURED CONCRETE:
SMALL DIVIDER HOLDER LARGE DIVIDER HOLDER
DIVIDER HOLDER DIVIDER HOLDER
(2) #8-32 x .25" LG
PAN HEAD SCREW
(2) #8-32 x .25" LG
PAN HEAD SCREW
DIVIDER DIVIDER
DIVIDER ASSEMBLY
(2) #8-32 x .25" LG
FLAT HEAD SCREW
GANG MOUNTING PLATE
SMALL GAP
FILLER*
LARGE GAP
FILLER* GANG PLATE
ASSEMBLY
(2) #8-32 x .25" LG
PAN HEAD SCREW
GANG
MOUNTING
BRACKET
INSTALLED
ELECTRONIC
COMPONENT
11" x 15" HOLE IN FLOOR
SIDE CLAMP
TIGHTENING
SCREW
SIDE CLAMP
TIGHTENING
SCREW
(8) #6-32 FLAT HEAD SCREW
TEMPORARY
COVER
FLOOR NOT SHOWN FOR CLARITY
OF CONDUIT INSTALLATION
BOX INSTALLATION
FOR RAISED-ACCESS FLOORS/WOOD FLOORS:
LOCATE AND POSITION BOX IN ACCORDANCE WITH FLOOR PLANS. HOLE TO
BE CUT IN FLOOR - 11" x 15". DROP FLOOR BOX THRU HOLE. REMOVE AND
RETAIN TEMPORARY COVER AND SCREWS. TURN (2) SIDE CLAMP
TIGHTENING SCREWS CLOCKWISE, UNTIL CLAMPS PRESS ON UNDERSIDE OF
FLOOR, AND BOX CANNOT MOVE OR SHIFT. ROUTE CONDUITS TO BOX AS
REQUIRED. PLACE THIS INSTALLATION GUIDE BACK INTO BOX, ALONG WITH
ALL SUPPLIED ITEMS, AND REINSTALL TEMPORARY COVER.
GANG MOUNTING BRACKET CONFIGURATION
PER CUSTOMER SPECIFICATIONS, CONFIGURE GANG MOUNTING BRACKETS AS
SHOWN BELOW AND REASSEMBLE INTO BOX.
SMALL GAP FILLER
LARGE GAP FILLER
SMALL DIVIDER HOLDER LARGE DIVIDER HOLDER
OPTIONAL DIVIDER
GANG MOUNTING BRACKET
1G 1G 1G 1G 1G 1G 2G
1G 1G 3G 1G 1G3G
1G 4G 2G 2G
2G 3G 4G 1G
5G
FLOOR BOX TEMPORARY COVER WILL EITHER BE INSTALLED DIRECTLY ON THE BOX OR SHIMMED
BASED ON THE COVER AND FLOORING SPECIFICATIONS. SHIM KITS SOLD SEPARATELY (FL-400-CSK).
THE TEMPORARY COVER MAY NOT BE FLUSH WITH THE FINISH FLOOR IN ALL INSTALLATIONS.
TYPICAL INSTALLATION HEIGHTS
FOR POURED CONCRETE
1/8" THICK
COVER
FLOOR
BOX
CONCRETE
SCREED
FLUSH
CARPET
CONCRETE FLUSH WITH BOX, COVER TYPES - B, BLP, BSQ, PTBLK, PTSLV, S, SLD, SLP, SSQ
TEMPORARY COVER
CONCRETE CONCRETE
CONCRETE
FLOOR BOX FLOOR BOX
FLOOR
BOX
1/8" THICK COVER
(B, BLP, S, SLP)
1/4" OR 1/2"
HIGH EDGING
CARPET FLOORING
1/4" OR 1/2"
HIGH EDGING
1/8" THICK COVER
(B, BSP, S, SSQ)
FINISHED
FLOOR
TILE OR LAMINATE FLOORING
STAINED OR VINYL FLOORING WOOD FLOORING
FINISHED
FLOOR
1/8" THICK COVER
(PTBLK, PTSLV)
SHIM AS
REQUIRED
BOX ABOVE CONCRETE, COVER TYPES - B, BSQ, PTBLK, PTSLV, S, SLD, SSQ
CALCULATE
TEMPORARY COVER
FLOOR
BOX
FLOOR
BOX FLOOR
BOX
CONCRETE CONCRETE CONCRETE
WOOD FLOORING WOOD FLOORING
FINISHED
FLOOR
SLEEPER
SYSTEM
(IF USED)
1/4" OR 1/2"
HIGH EDGING
1/8" THICK
COVER
1/8" THICK COVER
(B, BSQ, S, SSQ)
SLEEPER
SYSTEM
(IF USED)
FINISHED
FLOOR
1/8" THICK COVER
(PTBLK, PTSLV)
CALCULATE 1/8" THICK
COVER
TEMPORARY COVER
SHIM AS
REQUIRED
WOOD FLOORING
CONCRETE CONCRETE
FLOOR
BOX
FLOOR
BOX
3/8" THICK
COVER (SLD)
FINISHED
FLOOR
SLEEPER
SYSTEM
(IF USED)
SHIM AS
REQUIRED
BOX BELOW CONCRETE, COVER TYPES - SLD
SHIM AS
REQUIRED
1/8" THICK
COVER
TEMPORARY COVER VINYL FLOORING STAINED FLOORING
FLOOR
BOX FLOOR
BOX
FLOOR
BOX
CONCRETE CONCRETE CONCRETE
FINISHED
FLOOR
3/8" THICK
COVER (SLD)
3/8" THICK
COVER (SLD)
FINISHED
FLOOR
SHIM AS
REQUIRED
SHIM AS
REQUIRED
TYPICAL INSTALLATION HEIGHTS FOR
RAISED-ACCESS FLOORS
TEMPORARY COVER CARPET FLOORING VINYL FLOORING
FLASH PATCH
IF REQUIRED
FLOORING MATERIAL
1/2" MIN - 2-1/8" MAX
FLOOR
BOX
1/8" THICK
COVER
CARPET
FLOOR BOX
FLOOR
BOX
FINISHED
FLOOR
1/8" THICK COVER
(B, BLP, BSQ,
S, SLP, SSQ)
1/8" THICK COVER
(PTBLK, PTSLV)
1/4" OR 1/2"
HIGH EDGING
COVER TYPES - B, BLP, BSQ, PLP, PT, S, SLP, SSQ
FLOORING MATERIAL
1/2" MIN - 2-1/8" MAX
FLOORING MATERIAL
1/2" MIN - 2-1/8" MAX
SHIM AS
REQUIRED
FINISHED
FLOOR
FLOOR
BOX
CONCRETE
WOOD FLOORING
3/8" THICK
COVER (SLD)
FINISHED
FLOOR
SHIM AS
REQUIRED
1/4" OR 1/2"
HIGH EDGING
1/8" THICK
COVER
(B, BSQ, S, SSQ)
CONCRETE FLOOR
BOX
SCREED
FLUSH
  • Page 1 1
  • Page 2 2

FSR FL-400-SLD-ALU-C Installation guide

Type
Installation guide

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI