NICOR, Inc. 2200 Midtown Place NE, Albuquerque, NM 87107 P: 800.821.6283 F: 800.892.8393 www.nicorlighting.com July 7, 2017 3:03 PM rev 1.0
T5C LED TROFFER
INSTALLATION INSTRUCTIONS
Carefully unpack the xture from its packaging. Inspect product
for defects due to shipping.
Locate desired positioning for xture in ceiling grid. Remove ceiling
tiles if necessary.
1
2
4
Place xture into the T-grid
ceiling panel. Secure to
structure and/or grid per
state and local codes.
Turn o power to appropriate circuit at
the breaker panel.
3
The installation must only be performed by a licensed electrician.
To prevent death, injury or damage to property, this product must be installed in accordance to National Electrical Code (NFPA70) in the US
or Canadian Electrical Code (CSA 22.1) in Canada.
Disconnect power before installing the product or servicing it.
Wait until xture has cooled down before installing or servicing the xture.
MIN. 90°C SUPPLY CONDUCTORS
What’s In The Box
One (1) T5C
LED Troer Wire Nuts
Tools Needed
This LED Troer requires very few tools for installation.
A drill or a screwdriver and a pair of wirecutter.