Hadco (P150) Round Straight Pole - Anchor Rod, P100 Series Poles (P120, P150, P195) Install Instructions

  • Hello! I am an AI chatbot trained to assist you with the Hadco (P150) Round Straight Pole - Anchor Rod Install Instructions. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
UNLESS OTHERWISE SPECIFIED:
*ALL DIMENSIONS ARE IN INCHES.
*ALL THREADS ARE UNC-2B OR UNF-2B
AFTER COATING.
*ALL THREADS ARE TO BE VERIFIED
WITH A THREAD GAGE.
*
WARNING
*
NOT TO SCALE
CONSULT FACTORY FOR
FULL SIZE TEMPLATE.
CONFIDENTIAL:
This drawing is confidential and proprietary
to Signify Holdings and may not be reproduced in whole or
in part without the express written consent of Signify
Holdings. © 2018 Signify Holdings.
All rights reserved.
SEE NOTE 1
X
15.50
HAND HOLE
SCALE 1:8
(3) LEVELING WASHERS
AND NUTS
(3) MOUNTING WASHERS
AND NUTS
FOOTER
(BY OTHERS)
GROUND LINE
(3) 1/2 DIAMETER
HOT DIPPED GALVANIZED
STEEL ANCHOR RODS
2 PIECE BASE COVER
(31000101)
FIXTUREFIXTURE
CAUTION ON (2) LIGHT MODEL ONLY
FIXTURES WILL BE MOUNTED OPPOSITE
EACH OTHER AND IN LINE WITH THE CENTERS
OF ONE ANCHOR ROD AND THE POST
AS SHOWN.
SCALE 1:4
ATTENTION:
9.625
3 HOLES EQUALLY SPACED
ON A
7" BOLT CIRCLE
01700041
HOUSE SIDE
HAND HOLE
STREET SIDE
VERIFY BOLD LINE
IS 7" LONG
NOTES:
1. STRONGLY RECOMMENDED TO USE LEVELING
NUTS TO MOUNT THE POST BASE. IF
FOUNDATION IS NOT LEVEL, INCREASE
"X" DIMENSION ACCORDINGLY WHEN USING
LEVELING NUTS WITH WASHERS.
X = 2 1/2" MINIMUM WITH LEVELING NUTS
X = 2 3/4" MINIMUM WITHOUT LEVELING NUTS
2. IF USING GROUTING TO CONCEAL GAP BETWEEN
BASE AND FOUNDATION, ALLOW FOR WATER
DRAINAGE.
APPR
REV
ISO DOC
BY
DATE
SDK
G 19-001
AMP
1/28/2019
T01700041
PART NO:
CHECKED BY:
DRAWN BY:
APPR BY:
DATE:
DATE:
DATE:
4/9/99
C. CARR
4/9/99
8/4/09
E. HADDAD
B. DORON
SHEET 1 OF 1
SCALE 1:1
EF-04-01-11 Rev.09
TITLE: TEMP,AR,150
PART NO:
T01700041
DRW SIZE:
C
MATERIAL: 17 X 22 WHITE BOND PAPER,
* DO NOT SCALE THIS DRAWING *
*THE ABOVE NOTE IS TO BE MOVED INTO THE DRAWING
ONLY WHEN CREATING A PDF FOR THE WEB. CHANGE
SCALE TO NTS. DO NOT SAVE CHANGES TO SLDDRW!
*THE "VERIFY BOLD LINE" NOTE IS USED FOR TEMPLATES AS
A WAY FOR THE END USER TO VERIFY THAT THE DRAWING
WAS PRINTED FULL SCALE. PICK A LINEAR ENTITY (I.E. A
LINE NOT AN ARC) ON THE DRAWING THAT WOULD BE
EASILY MEASURABLE BY THE END USER WITH A RULER OR
TAPE MEASURE. MOVE THE BOLD LINE OVER THAT ENTITY
SO IT STANDS OUT ON THE DRAWING.
/