PERGO XP Install Instructions
Tools Required for Installation
Common Tools
Wood
Glue
Carbide
40T Blade
Other Tools and Supplies
M
A
D
E
I
N
T
H
E
U
S
A
1
F
L
O
Z
(
3
3
.
5
m
l
)
PREMIUM
SYSTEM
COMPONENT
S
P
E
C
I
A
L
L
Y
D
E
V
E
L
O
P
E
D
F
O
R
L
A
M
I
N
A
T
E
F
L
O
O
R
I
N
G
Finishing
Putty
PREMIUM
SYSTEM
COMPONENT
Finishing
Putty
SILICONE
CAULK
SILICONE
CAULK
SILICONE
CAULK
Mildew-resistant
silicone
Felt furniture
pads
Moisture
Meter
ON
Non Destructive Moisture
dlfwej dtra
djflsv
dlfwe vtra
alskdjf
vmwjc
Concrete
Encounter
Plus
0
1
2
3
4
5
6
0
50
100
150
200
250
Moisture
Meter
S
p
a
c
e
r
s
5
m
m
S
p
a
c
e
r
s
5
m
m
Laminate floor tapping
block and 5mm (
3
/16")
spacers
10' (3 m)
> 5" (130 mm)
6 mil (0.15 mm) virgin
polyethelene vapor barrier
ground
> 8" (200 mm)
Job Site
Site Requirements
Laminate is a durable oor covering, not intended as structural material.
Laminate requires a clean, dry, secure suboor that meets building codes.
The following requirements are not intended to supersede federal, state or
local building codes, but as with many other interior nish products, may
require modifying existing structural components for successful installation.
Owner assumes responsibility for compliance with all building codes.
Laminate oor is suitable for use in climate controlled (35-65% RH and 60-85°
F) indoor installations only and should not be installed in rooms with oor
drains or sump pumps. Laminate oor can be installed above, on or below
grade.
A moisture test is strongly recommended to determine if high moisture exists
in the suboor. When using a calcium chloride moisture test for concrete
suboors (ASTM F1869), values must be ≤ 5 lbs/1000ft²/24-hr or <80% RH
with an in-situ probe (ASTM F2170). Moisture readings of wood suboors
must be 12%.
Acceptable job site conditions, including relative humidity and suboor
moisture conditions, must be maintained throughout the lifetime of the ooring.
Laminate ooring is installed as a oating oor and requires the use of
T-moldings in doorways 4 ft (1.22m) or less and in rooms 40 feet (12.2 m) or
larger in length or width. Floor movement must not be constrained by glue,
nails, screws, hardware or other xed obstructions.
This product must be installed in accordance with these installation
instructions.
DO NOT tap the short side.
For more information, call 1-800-33-PERGO.
2019_03_XP_PFD
PERGO XP Install Instructions
Site and Material Preparation
A.) Remove carpet and padding. Also remove any wood ooring installed on concrete. Do not remove products unless
they are asbestos-free.
B.) Undercut door frame and wallbase. Slide the ooring at least 1/4” underneath the door frame and wallbase. Also
leave a concealed 3/8” minimum expansion space under each.
C.) Remove bumps or peaks in suboor and ll depressions with oor leveling compound to ensure no more than 3/16”
unevenness per 10-foot span.
D.) Acclimate unopened product before installation. If there is no time for acclimation, there should be no more than
a difference of 25° F and 20% relative humidity between the stocking/transportation environment of the
ooring and the nal installation environment of the ooring.
E.) Clean debris from suboor before installation.
F.) For concrete suboors, install vapor barrier with overlapped seams of 8” or more.
G.) For planks without attached underlayment, install over single layer of underlayment appropriate for laminate
oors. For planks with attached underlayment, it is acceptable to install Pergo FloorMate™ underlayment prior to
ooring installation if desired. Make sure to follow the Pergo FloorMate™ installation instructions, taking special care
to seal all foam edges with sealing tape and repair all rips and perforations in the underlayment vapor barrier prior to
ooring installation. A separate vapor barrier should not be used in conjunction with Pergo FloorMate™.
Site and Material Preparation
A
Door
Frame
Cutting
Line
Wallbase
Casing
1 inch
(2,5 cm)
B
%
48 hours
60° – 85° F
15° – 29° C
35% – 65% RH
C
D
G
subfloor
6 mil (0.15 mm) virgin
polyethelene vapor barrier
> 8" (200 mm)
E F
2019_03_XP_PFD
PERGO XP Install Instructions
2
3
1
15 16
17
18
21
22
13
12
14
10 11
5
4
7
1 3 5 5
2
4
6
5
6
6
> 12 in
> 30 cm
8
> 12 in
> 30 cm
9
6
WOOD
GLUE
19
20
glue
Note: Do not
locate end joint within
doorway, if possible.
glue
2019_03_XP_PFD
Flooring Installation
1. Inspect each plank. Floor should be installed blending planks from several cartons at the same time to ensure good
color and shade mixture throughout the installation.
2. For the rst row along straight walls, remove the tongue on all long side joints and on the short side of the 1st plank
only.
3. For uneven walls, trace contour on tongue-side of plank and cut.
4. SAFETY NOTE: For ooring with a plastic tongue, remove the plastic tongue before cutting the length of the plank.
5. Cut the plastic tongue 3/8" shorter than the width of the cut plank. Starting at the edge of the plank, re-insert the plastic
tongue rmly into the groove.
6. For assembly of rst row, align and slide plank end joints together.
7. Two spacers thick side to thick side = 3/8".
8-12. Provide a 3/8" space for expansion on all sides. First piece must be at least 8" long. Start new rows with pieces
trimmed from previous row. Ensure at least a 12" end joint offset.
13. For products with plastic inserts, be sure to fully lock the end joint.
14. Alternate Tap Method: Slide end joint together and align the long side joint. Then gently tap long side using a tapping
block, taking care to tap evenly from end to end. Note: Uneven tapping or use of excessive force may damage
the joint.
15. For the last row, align the plank to be used on top of the 2nd to last row. Using a full width plank as a spacer, trace wall
contour and cut plank.
16. For the last row, install the long side tongue into the groove with the end joint aligned. Using a pull bar and hammer,
work evenly along the length of the plank and lightly tap the joint closed.
Plank Disassembly
17. Lift row.
18. Slide end joint apart.
Installation Around Fixed Objects (such as Pipes)
19. Allow 3/8" expansion space around pipes or other xed objects.
Installation Under Doorway Frames
20. Remove lock on lower lip of the groove and apply a small bead of wood glue in its place.
21. Slide plank under pre-cut door frame.
22. Tap the long side joint closed rst. Then tap the end joint closed.
Care and Cleaning
Place felt oor protectors under legs of moveable furniture. Chair casters should be rubber not plastic or metal. Place
walk-off mats at entrances. Dust mop or damp mop only. NO wet mopping. If needed, use a solution of 1 cup of vinegar
per gallon of water OR 1/3 cup non-sudsing ammonia per gallon of water. Do not use abrasive cleaners, detergents,
soaps, waxes or polishes. Use correct hard surface vacuum tools. DO NOT use rotating beater bars, oor scrubbers,
steamers, jet mops or similar products. DO NOT allow liquids to stand on the oor. Wipe up spills immediately. DO NOT
allow moisture to be on the oor for longer than 30 minutes.
A
B
C
PERGO XP Install Instructions
2019_03_XP_PFD
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4

Pergo LF000314 Installation guide

Type
Installation guide

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI