Streamline K1803-161-48-512S Installation guide

Type
Installation guide
STREAMLINE INSTALLATION GUIDE
PAGE 1
SIDE CABINET INSTALLATION
PAGE 2
STREAMLINE INSTALLATION GUIDESTREAMLINE INSTALLATION GUIDE
11
11
22
44
Removal:
1. Unscrew both bolts
2. Lift the drawer and pull it out
Installation:
1. Place drawer on the rail glide
2. Push the drawer in and hook it
3. Push the drawer down and lock it via
a button
4. Screw both bolts to secure the drawer
Three drawer configurations, please follow instructions for
removal and installation for the applicable model below.
drawer
DRAWER TYPE 1
RemovalRemoval
InstallationInstallation
22
33
DRAWER TYPE 2
DRAWER TYPE 3
Removal:
1. Press the button under the drawer glide
2. Lift the drawer and pull it out
Installation:
1. Place drawer on the rail glide
2. Push the drawer down and in
Upper drawer: with refer to DRAWER TYPE 1
Bottom drawer: with refer to DRAWER TYPE 2
Removal
1
2
1
Installation
PAGE 3
Intergratded Top/Sink Installation
Top/Sink installation
PAGE 4
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4

Streamline K1803-161-48-512S Installation guide

Type
Installation guide

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI