Vortex 2011-2012 MUSTANG GT Installation Instructions Manual

Category
Toys & accessories
Type
Installation Instructions Manual

This manual is also suitable for

Vortex 2011-2012 MUSTANG GT

The Vortex 2011-2012 MUSTANG GT is a fuel pump voltage booster designed to support high-power applications on Ford Mustang GT vehicles equipped with turbochargers, superchargers, or nitrous oxide. It increases fuel flow to the engine, ensuring optimal performance and preventing lean conditions that can lead to engine damage.

The Vortex 2011-2012 MUSTANG GT is easy to install and comes with all necessary hardware and wiring. It features a compact design that allows for mounting in the rear passenger side spare tire well without interfering with the spare tire's placement.

Vortex 2011-2012 MUSTANG GT

The Vortex 2011-2012 MUSTANG GT is a fuel pump voltage booster designed to support high-power applications on Ford Mustang GT vehicles equipped with turbochargers, superchargers, or nitrous oxide. It increases fuel flow to the engine, ensuring optimal performance and preventing lean conditions that can lead to engine damage.

The Vortex 2011-2012 MUSTANG GT is easy to install and comes with all necessary hardware and wiring. It features a compact design that allows for mounting in the rear passenger side spare tire well without interfering with the spare tire's placement.

DP/N: 007127v1.1
02/21/2012
MAXFLOW
®
FUEL PUMP BOOSTER
Installation Instructions
®
1650 Pacific Avenue, Channel Islands, CA 93033-9901 Phone 805 247-0226
Fax: 805 247-0669 www.vortechsuperchargers.com • M-F 8:00 AM - 4:30 PM (PST)
ENGINEERING, INC.
2011-2012 MUSTANG GT
P/N: 5A102-029
DP/N: 007127v1.1, 2012-02-21
© 2012 Vortech Engineering, Inc.
All Rights Reserved, Intl. Copr. Secured.
iiii
FOREWORD
Take note of the following before proceeding:
1. Proper installation of this accessory requires general automotive
mechanic knowledge and experience. Please browse through each step
of this instruction manual prior to beginning the installation to determine if
you should refer the job to a professional installer/technician. Please con-
tact your dealer or Vortech Engineering for possible installers in your
area.
2. This product was designed for use on stock (un-modified, OEM)
vehicles. The PCM (computer), engine, transmission, drive axle
ratios and tire O.D. must be stock. If the vehicle or engine has been modi-
fied in any way, check with Vortech prior to installation and use of this product.
3. Use only premium grade fuel with a minimum of 91 octane (R+M/2).
4. Always listen for any sign of detonatlion (knocking/pinging) and discontinue hard
use (no boost) until the problem is resolved.
5. Vortech is not responsible for any clutch, transmission, drive-line or engine dam-
age.
Exclusions from Vortech warranty coverage considerations
include, but not limited to:
1. Neglect, abuse, lack of maintenance, abnormal operation or improper installation.
2. Continued operation with an impaired vehicle or sub-system.
3. The combined use of Vortech components with other modifications such as, but
not limited to, exhaust headers, aftermarket camshafts, nitrous oxide, third party
PCM programming or other such changes.
©2012 VORTECH ENGINEERING, INC
All rights reserved. No part of this publication may be reproduced, transmitted, transcribed, or translated into
another language in any form, by any means without written permission of Vortech Engineering, Inc.
All information, illustrations and specifications contained herein are based on the latest
product information available at the time of this publication. Changes to the manual may be
made at any time without notice. Contact Vortech Engineering for any additional informa-
tion regarding this kit and any of these modifications at (805) 247-0226 8:00am-4:30pm
PST.
STOP
DP/N: 007127v1.1, 2012-02-21
© 2012 Vortech Engineering, Inc.
All Rights Reserved, Intl. Copr. Secured.
iiiiii
TABLE OF CONTENTS
FORWORD ................................................................ii
TABLE OF CONTENTS ................................................... iii
TOOL & SUPPLY REQUIREMENTS ........................................ iv
PARTS LIST ..............................................................v
1. PREPARATION AND REMOVAL ...........................................4
2. FUEL PUMP VOLTAGE BOOSTER MOUNTING ...............................5
3. FUEL PUMP VOLTAGE BOOSTER WIRING .................................10
4. FINAL ASSEMBLY .....................................................11
5. FINAL CHECK.........................................................12
DP/N: 007127v1.1, 2012-02-21
© 2012 Vortech Engineering, Inc.
All Rights Reserved, Intl. Copr. Secured.
iviv
VORTECH FUEL PUMP VOLTAGE BOOSTER
Installation Instructions
2011-2012 MUSTANG GT
Before beginning this installation,
please read through this entire instruction booklet
The Vortech 2011-2012 Mustang GT Fuel Pump Booster (FPB) upgrade was designed
specifically for use on 2011-2012 Ford Mustang GT vehicles equipped with a turbocharg-
er, supercharger or nitrous oxide, to support applications with increased horsepower
over the basic kit. As with any power enhancing product, this unit is intended for use on
healthy, well-maintained engines. Vortech Engineering is not responsible for engine
damage. Installation on new vehicles will not harm or adversely affect the break-in peri-
od so long as factory break-in procedures are followed.
For best performance and continued durability, please take a note of the following key
points:
1. Use only premium grade fuel 91 octane or higher (R+M/2).
2. Always listen for any sign of detonation (pinging) and discontinue hard use (no
boost) until problem is resolved.
TOOL & SUPPLY REQUIREMENTS:
Open End Wrenches (5/16”, 10mm )
3/8” Ratchet
10mm, 13mm, and 5/16” Sockets
Flat #2 Screwdriver
Phillips #2 Screwdriver
Utility Knife
Heat Gun
Soldering Iron/Gun
Electrical Tape
Wire Cutters, Strippers and Crimpers
Drill Motor
1/8”, Drill Bit
DP/N: 007127v1.1, 2012-02-21
© 2012 Vortech Engineering, Inc.
All Rights Reserved, Intl. Copr. Secured.
v
PARTS LIST
2011-2012 MUSTANG GT
FUEL PUMP VOLTAGE BOOSTER UPGRADE
Part No. 5A102-029
PART NO. DESCRIPTION QTY
5W001-007 SHRINK SLEEVE 6"
5W001-038 SHRINK SLEEVE 6"
5W010-000 10 GA WIRE, RED 25FT
5W012-010 12 GA WIRE, BLK 8"
5W014-010 14 GA WIRE, RED 4FT
5W012-080 12 GA WIRE, ORANGE 4FT
5W001-043 10/12 GA RING TERM, 1/4" 2
5W001-019 10/12 GA BUTT CONNECTOR 2
5W001-041 10/12 GA MALE SLIDE INSULATED 3
5W001-040 10/12 GA FEMALE SLIDE INSULATED 3
5W001-010 14/16 GA FEMALE SLIDE INSULATED 1
008735 FINISHING PLUG 1
5W001-014 FUSE HOLDER 1
5W001-078 FUSE, BLADE, 40A 1
5A002-029 FPVB UNIT 1
5W001-005 3/8" WIRE LOOM 24FT
7U030-024 NYLON VAC TUBING 25FT
7U030-109 7/64 VAC HOSE 6"
7P250-188 VAC HOSE TEE CONNECTOR 1/4 X 3/16 1
7E010-048 SCREWS 4
7U100-055 TIE WRAPS LG 15
7U100-044 TIE WRAPS SM 12
IMPORTANT: Before beginning installation, verify that all parts are included in the kit.
Report any shortages or damaged parts immediately.
DP/N: 007127v1.1, 2012-02-21
© 2012 Vortech Engineering, Inc.
All Rights Reserved, Intl. Copr. Secured.
vi
This page intentionally left blank
DP/N: 007127v1.1, 2012-02-21
© 2012 Vortech Engineering, Inc.
All Rights Reserved, Intl. Copr. Secured.
1
1. PREPARATION AND REMOVAL
A. Remove the 10mm headed screw securing the
corrigated sound tube located under hood. (See
Fig 1-a)
B. Remove the corrugated sound tube from the fire-
wall and set aside, as it will not be reused.
C. Remove the spring clip, as it will no longer be
used. See (Fig 1-b)
D Set the assembly to the side, as it will not be
reused. (See Fig 1-c)
Fig. 1-a
Fig. 1-b
Fig. 1-c
DP/N: 007127v1.1, 2012-02-21
© 2012 Vortech Engineering, Inc.
All Rights Reserved, Intl. Copr. Secured.
2
1. PREPARATION AND REMOVAL, CONT’D
E. Remove the driver's side door sill. Lift up on the
door sill to release the double sided tape securing
the sill to the body. (See Fig 1-d)
F. Remove the electrical connector. (See Fig 1-e)
G. Remove the plastic clip securing the inside panel
and set the panel to the side to be reinstalled in a
later step. (See Fig 1-f)
Fig. 1-d
Fig. 1-e
Fig. 1-f
DP/N: 007127v1.1, 2012-02-21
© 2012 Vortech Engineering, Inc.
All Rights Reserved, Intl. Copr. Secured.
3
1. PREPARATION AND REMOVAL, CONT’D
H. Remove the plastic clip securing the lower portion
of the plastic planel just below the rear seat. (See
Fig 1-g)
I. Remove the rear seat. Locate the 2 clips that
secure the seat. Press the clips toward the rear of
the vehicle and lift up on the lower portion of the
seat to release the lower cushion. (See Fig 1-h)
J. Remove the rear trunk carpeting, exposing the
spare tire well. (See Fig 1-i)
Fig. 1-g
Fig. 1-h
Fig. 1-i
PLASTIC
FASTENER
PLASTIC RETAINING CLIP
DP/N: 007127v1.1, 2012-02-21
© 2012 Vortech Engineering, Inc.
All Rights Reserved, Intl. Copr. Secured.
4
K. Remove the four plastic fasteners securing the
plastic tail light cover. (See Fig 1-j)
L. Lift up on the panel and remove it. It will be rein-
stalled at a later time.
M. Remove the spare tire, if equipped. (See Fig 1-k)
1. PREPARATION AND REMOVAL, CONT’D
Fig. 1-j
Fig. 1-k
REMOVE
FASTENERS
DP/N: 007127v1.1, 2012-02-21
© 2012 Vortech Engineering, Inc.
All Rights Reserved, Intl. Copr. Secured.
5
2. FUEL PUMP VOLTAGE BOOSTER MOUNTING
Fig. 2-a
Fig. 2-b
DRILL WITH
1/8" DRILL
A. Locate the FPB (Fuel Pump Booster) in the rear
portion of the passenger side spare tire well as
shown. (See Fig 2-a)
B. If the vehicle is equipped with a spare tire, confirm
that the spare tire will fit back into its original loc
tion after the FPB is installed.
C. Using the FPB as a template, mark the four mount-
ing locations. (See Fig 2-b)
D. Using a 1/8 drill bit, drill 4 mounting holes andat-
tach the FPB using the provided mounting hard-
ware.
DP/N: 007127v1.1, 2012-02-21
© 2012 Vortech Engineering, Inc.
All Rights Reserved, Intl. Copr. Secured.
6
A. Locate the supplied body plug and install it into in
the existing hole in the firewall. (See Fig 3-a)
B. Loosely route the supplied 10 GA wire around the
front of the vehicle to the Power Distribution box.
Attach the supplied fuse holder assembly to the
end of the 10 GA wire.
C. Using the supplied tee and length of rubber vacu-
um hose, splice the tee into the supercharger
bypass valve signal hose (will see boost and vac-
uum).
D. Route the supplied 10 GA wire and 1/8" nylon tub-
ing through the previously installed body plug.
Using a sharp blade, slice a small "x" in the center
of the plug to allow the wire to pass through.
E. From the inside of the vehicle, route the supplied
wire and 1/8" vacuum tubing along the floor
board. Use the supplied wire loom to cover the
wire and vacuum tubing as they are routed to the
rear of the car. Secure the wire to the existing
wires. (See Fig 3-b)
F. Lift up on the plastic carpet cover and route the
wire toward the rear of the vehicle. (See Fig 3-c)
3. FUEL PUMP VOLTAGE BOOSTER WIRING
Fig. 3-a
Fig. 3-b
Fig. 3-c
SUPPLIED
BODY PLUG
Route Supplied wire
and vaccum hose
DP/N: 007127v1.1, 2012-02-21
© 2012 Vortech Engineering, Inc.
All Rights Reserved, Intl. Copr. Secured.
7
3. FPVB WIRING , CONT’D
G. Route the wire and vacuum tubing under the rear
seat and along the existing wiring harness.
Secure the wires to the existing harness. (See Fig
3-d)
H. On the driver's side of the vehicle, locate the OEM
Fuel Pump Control Module.
I. Strip back the split loom and the tape, exposing
the wires.
J. Locate the violet with a green/blue tracer wire.
(See Fig 3-f 3-e)
K. See wiring schematic Fig 3-g
Fig. 3-d
Fig. 3-e
Fig. 3-f
NOTE: Automatic vehicles may have an orange
with a red tracer.
DP/N: 007127v1.1, 2012-02-21
© 2012 Vortech Engineering, Inc.
All Rights Reserved, Intl. Copr. Secured.
8































Fig. 3-g
DP/N: 007127v1.1, 2012-02-21
© 2012 Vortech Engineering, Inc.
All Rights Reserved, Intl. Copr. Secured.
9
3. FPVB WIRING, CONT’D
L. Using one of the supplied ring terminals, solder
or crimp onto the black ground wire of the FPB
unit and attach to one of the existing factory
ground points. (See Fig 3-h)
M. Connect the orange 12 GA wire to the OEM vio-
let with green/blue tracer (previously cut) wire
going to the fuel pump driver module. (See Fig
3-i)
N. Connect the small red 14GA wire from the FPB
to the other portion of the violet with green/blue
tracer. (See Fig 3-k and 3-j)
O. Attach the 10 GA wire previously routed from the
front of the vehicle to the 40 Amp fused wire on
the FPB.
Fig. 3-h
Fig. 3-i
Fig. 3-j
Fig. 3-k
NOTE: Do NOT re-attach to battery at this time.
ORANGE 10GA
WIRE FROM
FPB
RED 14 GA
TRIGGER WIRE
FROM FPB
RED 14 GA
TRIGGER WIRE
FROM FPB
DP/N: 007127v1.1, 2012-02-21
© 2012 Vortech Engineering, Inc.
All Rights Reserved, Intl. Copr. Secured.
10
3. FPVB WIRING , CONT’D
P. Moving to the front of the vehicle, route the pre-
viously routed FPB power wire near the existing
hood latch cable. (See Fig 3-l).
Q. Continue to route the power wire around the
radiator core support securing the wire with the
supplied nylon ties. (See Fig 3-m)
R. Solder or crimp the supplied ring terminal and
fuse holder to the end of the FPB power wire.
S. Secure the power wire to the power distribution
box using a 10mm wrench and secure the cover.
(See Fig 3-n).
T. Install the supplied 40A fuse into the fuse holder.
Fig. 3-l
Fig. 3-m
Fig. 3-n
Fig. 3-o
HOOD LATCH
CABLE
DP/N: 007127v1.1, 2012-02-21
© 2012 Vortech Engineering, Inc.
All Rights Reserved, Intl. Copr. Secured.
11
4. FINAL ASSEMBLY
Fig. 4-a
Fig. 4-b
Fig. 4-c
A. Reinstall the spare tire if equipped. (See Fig 4-a)
B. Reinstall the rear tail light panel along with it's fas-
teners that were removed in an earlier step. (See
Fig 4-b)
C. Install the factory spare tire cover. ( See Fig 4-c)
D. Reinstall the front core support cover. (See Fig
4-d)
Fig. 4-d
DP/N: 007127v1.1, 2012-02-21
© 2012 Vortech Engineering, Inc.
All Rights Reserved, Intl. Copr. Secured.
12
5. FINAL CHECK
A. Confirm that all connections are properly insulated
and secure from creating any shorts. Make sure
all wires are properly secure with clamps or tie-
wraps.
B. Make sure all wires are routed away from hot,
moving or sharp objects.
C. Test drive the vehicle.
D. Always listen carefully for engine detonation.
Discontinue heavy throttle usage if detonation is
heard.
WARNING: Do not attempt to operate the vehicle
until ALL components are installed and ALL
operations are completed including the final
check.
DP/N: 007127v1.1
02/21/2012
®
ENGINEERING, INC.
1650 Pacific Avenue, Channel Islands, CA 93033-9901 Phone 805 247-0226
Fax: 805 247-0669 www.vortechsuperchargers.com M-F 8:00 AM - 4:30 PM (PST)
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16
  • Page 17 17
  • Page 18 18
  • Page 19 19

Vortex 2011-2012 MUSTANG GT Installation Instructions Manual

Category
Toys & accessories
Type
Installation Instructions Manual
This manual is also suitable for

Vortex 2011-2012 MUSTANG GT

The Vortex 2011-2012 MUSTANG GT is a fuel pump voltage booster designed to support high-power applications on Ford Mustang GT vehicles equipped with turbochargers, superchargers, or nitrous oxide. It increases fuel flow to the engine, ensuring optimal performance and preventing lean conditions that can lead to engine damage.

The Vortex 2011-2012 MUSTANG GT is easy to install and comes with all necessary hardware and wiring. It features a compact design that allows for mounting in the rear passenger side spare tire well without interfering with the spare tire's placement.

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI