Page 4 of 4
Field Installation
1.
Lay the bushing horizontally on a surface that will not damage
the porcelain. (
Ensure the air end of the bushing remains
above the oil end)
2.
Unscrew the top terminal and set aside (with o
To ensure a proper seal at t
terminal the o-
clean and dry.
3. Unscrew the nut from the Top-Link
rod that is under the top
terminal.
4. Remove the pin that holds the Top-
conductor.
5. Remove the Top-Link from the bushing.
6. Attach a wire or strong cord
that is longer than the bushing
the Top-Link rod, using the small hole on top.
or cord as fastened can pass through a Ø1.00 hole.
7.
Remove the fasteners holding the cover on the bushing
mounting hole.
8. Lift the cover plate about 2 inches, enough to
rod through the 0.44” hole in the brass Bottom
hole is 1.75
inches from the top of the Bottom
rod must be long enough to span the opening in the
transformer tank and hold the Quick-
of a split plate (B-331042)
at this point could ease inst
to help prevent the dropping o
f tools or fasteners into the
transformer.
9.
Remove the top cover, by unthreading, while insuring that
any possible connection to the Bottom-
tightly on the transformer connections.
Do not pull the assembly too hard,
you may damage the internal
10. Connect the Top-Link to the Bottom-
inch of threads visible between the two sections.
11.
Hoist the bushing over the mounting position and fish the
wire through the center conductor.
12. Attach a wire or strong cord to the rod
on the Top-Link.
This will function in the same manner
as the wire used in a draw
application.
13. Remove the rod and split plate
while pulling on the wire.
Instructions for Installation and Removal: B
Lay the bushing horizontally on a surface that will not damage
Ensure the air end of the bushing remains
Unscrew the top terminal and set aside (with o
-ring).
To ensure a proper seal at t
he top
rod that is under the top
that is longer than the bushing
to
rod, using the small hole on top.
Ensure this wire
or cord as fastened can pass through a Ø1.00 hole.
Remove the fasteners holding the cover on the bushing
insert a small
rod through the 0.44” hole in the brass Bottom
-Link rod. (The
inches from the top of the Bottom
-Link rod.) The
rod must be long enough to span the opening in the
. The use
at this point could ease inst
allation
f tools or fasteners into the
Remove the top cover, by unthreading, while insuring that
Do not pull the assembly too hard,
you may damage the internal
inch of threads visible between the two sections.
Hoist the bushing over the mounting position and fish the
This will function in the same manner
as the wire used in a draw
-lead
while pulling on the wire.
assembly does not fall into the
14.
Lower the bushing over the Quick
hold
ing the wire to keep the assembly from falling into the
transformer.
15.
Once the bushing is in place, the Quick
need a firm tug to pull it into place at the bottom. The fit is
very tight to ensure a proper
connection. Insert a screwdriver
through the 0.31” hole at the top of the Top
Make sure you pull the Quick
connector stops inside the socket
You should feel it stop. If the Quick
Link connector is not fully inserted,
you may run out of threads trying to
16. Once the Quick-
Link connector is seated, the top should look
just like a standard PCORE draw
extension
17. Rotate the Top-Link while
until the holes align, and insert the pin. The Quick
as
sembly is designed so the holes align when there is a gap
between the two rods. The Top
carry current. The gap will not affect the current capacity.
more than 90° in either direction
18.
Remove the wire and install the nut in the same manner you
would a draw-lead.
19.
Reinstall the top terminal (with the o
FT-LBS.
20.
The bushing is installed and can be energized.
Instructions for Installation and Removal: B
-331045 3/19/15
the wire is firmly held so the
assembly does not fall into the
Lower the bushing over the Quick
-Link assembly; continue
ing the wire to keep the assembly from falling into the
Once the bushing is in place, the Quick
-Link assembly will
need a firm tug to pull it into place at the bottom. The fit is
connection. Insert a screwdriver
through the 0.31” hole at the top of the Top
-Link and pull up.
Make sure you pull the Quick
-Link
way up until the
connector stops inside the socket
.
You should feel it stop. If the Quick
-
Link connector is not fully inserted,
you may run out of threads trying to
with the center
and drop the bottom rod
Link connector is seated, the top should look
just like a standard PCORE draw
-lead terminal with a longer
the screwdriver
until the holes align, and insert the pin. The Quick
-Link
sembly is designed so the holes align when there is a gap
Link and Bottom-Link do NOT
carry current. The gap will not affect the current capacity.
-Link connector
more than 90° in either direction
djusting the alignment.
Remove the wire and install the nut in the same manner you
-LBS.
Reinstall the top terminal (with the o
-ring), and tighten to 50
The bushing is installed and can be energized.