Coats Kit 85000805, Carrier Operating instructions

Type
Operating instructions
Parts List
Part No. Description
8185679 Clamp Carrier
8182279 1/2-13 UNC, Hex Link Bolt
903174 5100-75 Ext. Retaining Ring
8185035 0.512 ID x 0.787 OD x 0.079 Washer
8185018 5100-46 Ext. Retaining Ring
85000803 Packet Loctite®
Loctite® is a trademark of Henkel Corporation
Tools Required: Screwdriver, 15mm Combination
Wrench, Snap Ring Pliers, 3/4-inch Socket, 1/2-inch
Drive Ratchet, Dead Blow Hammer, 9/16-inch
Combination Wrench, Allen Wrench, Torque Wrench
Installation Instructions
Always DISCONNECT THE ELECTRICAL
POWER before servicing equipment. This
prevents electrical shock or accidental
movement of the systems operated by the
electrical power.
Always DISCONNECT AIR SUPPLY before
servicing equipment. This prevents acciden-
tal movement of systems operated by com-
pressed air which may result in personal
injury. BLEED THE AIR SYSTEM by actuating
all the valves.
1. Before beginning any work, clear the area, position
clamps in outer position, and rotate table top for easy
access to the carriers. Disconnect all power sources,
both air and electricity inputs. Allow any stored air in the
reservoir to escape by depressing the inflate pedal.
2. Verify the stored air pressure is zero by observing
the air pressure gauge on top of the tower.
3. Disconnect
air line at carri-
er’s elbow fit-
ting. Repeat on
opposite side.
4. Loosen and then remove the four table top hose
holders. If necessary, remove air hose and use screw-
driver to provide leverage when loosening hose holder.
5. Remove outer retaining rings and washers from
both cylinder mounting shafts. Slide the cylinders off.
6. Next, remove the inner retaining ring that holds the
cylinder mounting shaft on the carrier and slide the
cylinder mounting shaft out.
7. Loosen and remove the table top link bolt to
remove the old carrier assembly.
CAUTION
CAUTION
85000804 00 07/07 1 of 2 © COPYRIGHT 2007 HENNESSY INDUSTRIES AND COATS ALL RIGHTS RESERVED PRINTED IN U.S.A.
Carrier Kit 85000805
For use with COATS Model
APX Series Tire Changers
Hennessy Industries • 1601 J.P. Hennessy Drive, LaVergne, TN 37086-3565 (800) 688-6359 • (615) 641-7533 • (615) 641-5104 FAX • www.ammcoats.com
Inner Retaining Ring
Outer Retaining
Ring & Washer
Outer
Retaining
Ring &
Washer
Table Top
Link Bolt
Cylinder Mounting Shaft
Air Line At
Elbow Fitting
Hose
Holder
8. Use slight force to pull carrier assembly off table
top. Remove slide stopper screws and lift off slide.
9. Remove clamp, clamp button and air fitting from
old carrier and install them on the new carrier. Press
large button in and move clamp to outer position. Press
and hold large button and with a small screwdriver,
press back of button through small hole in clamp; then
slide clamp off clamp carrier.
10. Next, install slide stopper onto new carrier
assembly. Position slide at an angle on carrier and,
using a dead blow hammer, drive slide onto carrier so
that it passes the carrier’s ridge stop.
11. Install new carrier assembly and the slide stop-
per screws on the table top.
12. Apply loctite to the table top link bolt and install
new carrier assembly to the tabletop.
Note: Using a torque wrench, tighten the bolt holding
the carrier to 25-35 ft. pounds torque.
13. Repeat steps 6 - 12 for opposite side carrier
assembly.
14. Reassemble remaining components in reverse
order.
15. Functional test machine.
85000804 00 07/07 2 of 2 © COPYRIGHT 2007 HENNESSY INDUSTRIES AND COATS ALL RIGHTS RESERVED PRINTED IN U.S.A.
Carrier’s
Ridge Stop
Angle Slide
On Carrier
PUSH
PUSH
Remove Clamp
Table Top
Link Bolt
  • Page 1 1
  • Page 2 2

Coats Kit 85000805, Carrier Operating instructions

Type
Operating instructions

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI