Porter PRO-STRUT CONVERSION GLASS BACKBOARD, 72"X42" Operating instructions

Type
Operating instructions
A
BACKBOARD
>1/16" GAP
DETAIL A
POSITION SHIMS BETWEEN
BACKBOARD MOUNTING
PLATE/S AND THE MOUNTING
PLATE/S OF THE STRUCTURE
DURING INSTALLATION
BACKBOARD
Whenever installing a glass backboard to a new or
existing structure with three or four attachment
points, attachment locations must always be
coplanar. If any attachment point is more than 1/16"
out of plumb from the other attachment points it is
recommended to make adjustments to the structure
before proceding with installing the backboard. If
adjustments can't be made to the structure, shim the
attachment point/s with washers provided to ensure
all attachment points are coplanar. Failure to correct
the attachment points can lead to strain on the
backboard resulting in breakage of the glass bank.
NOTICE
WARNING
: Cancer and Reproductive Harm –
For more information go to www.p65warnings.ca.gov
!
F
www.porterathletic.com
Copyright
2023 by Porter Athletic.
All rights reserved.
888-277-7778
8/31/2023
INST2000
Page 1 of 1
GLASS BACKBOARD INSTALLATION NOTICE
ALL GLASS MODELS (204, 205A,206, 208)
  • Page 1 1

Porter PRO-STRUT CONVERSION GLASS BACKBOARD, 72"X42" Operating instructions

Type
Operating instructions

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI