SODEX S18152GCW Assembly Instructions Manual

  • Hello! I am an AI chatbot trained to assist you with the SODEX S18152GCW Assembly Instructions Manual. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
DETAILS
SODEX INTERNATIONAL
18 rue de lavenir – Bât. 224
14650 CARPIQUET
Phone: + 33 (0) 2.31.53.78.70
DESCRIPTION
Structure in steel 80x80
White powder coated
3,05 m - 2,60 m
CONFORM
European norm
ASSEMBLY INSTRUCTIONS
MULTI-FUNCTION GOAL
3.05m - 2.60m
PRODUCT REF :
S18152GCW UNIT
TEST AFTER INSTALLATION
According to the decree above, for the first installation the goal must be tested like below :
Put a vertical and static charge of 320 kg, at the jonction of the pannel and the basket , at 0.20m of the ground,
during one minute.
During the first installation, this stability and solidity test is compulsory.
Every time that the equipment is assembled, a visual check of the stability and solidity must be realized.
The owner must regularly check the condition of the product.
MAINTENANCE
The equipment has to be regularly maintained by the owner. It is advised to:
- Check every week that all the screws are correctly tightened
- Fix paint defects if the module has been damaged, using the adapted paint, specified by the manufacturer.
- Replace all damaged or missing parts with a spare part recommended by the manufacturer.
- Clean the product by using dishwasher soap, clean water, and soft cloth.
It is advised to carry out this cleaning once or twice a year, or even more regularly according to the environmental
conditions (saline environment, …)
WARRANTY
One full year parts and labor guarantee. Every claim regarding the condition of the delivered equipment has to be
done within the legal period,of the reception of the material.
The warranty will not apply to:
- All degradation during the transport.
- All degradation due to poor maintenance.
- All degradation due to use differing from which was intended
- Any defect claimed after the end of the legal period.
- Any damage due to a faulty installation or assembly of the module.
2
IMPLANTATION
- Dig a hole for the sealin according to the dimensions written.
- Fill the sealings with CPJ 45 concrete dosed at 350 kg/m³ . Pour the concrete and let it set for a minimum of 72h.
PENETRATION OF THE FRONT POST IN THE SOCKET : 350 mm
NB: All the dimension are in millimeters
Front sealing
Rear sealing
Socket : 80x80mm
Socket :50x50mm
3
Always drill the panel from the front side.
Drill a first hole with a bit of 6mm of diametre then do it again with a bit
of 12mm of diametre. Start by drill the two holes on the top.
For outside using, its necessary to put some silicone around the hole
to protect them from water.
Put the panel on it support, check the height and then put a mark for the
drill of the last holes.
NECESSARY TOOLS (NOT INCLUDED)
Drill
Silicone
DRILLING OF THE PANEL
4
ASSEMBLY
1 ASSEMBLE 2 CROSSBARS TO TUBE HOLDING BACKBOARD SUPPORT(x1)
NECESSARY
ITEMS
NECESSARY TOOLS (NOT INCLUDED)
INCLUDED ITEMS
X2
Screws round
-tipped BC M10x40
Wrench 17mm
x34
Washers BC M10
X4
Nuts BC M12
X10
Nuts BC M10
Vis BC M10x20
+ Washers BC M10
x4
Washers BC M10
Plates 10x60x80
X2
x4
Screws BC M12x120
x28
Screws BC M10x20
x8
Washers BC M12
x4
Screws BC M10x20
X4
Screws BC M10x50
Wrench 17mm
Wrench 19mm
5
ASSEMBLY
2 ASSEMBLE THE CROSSBARS TO POSTS(x1)
NECESSARY
ITEMS
Screws BC M10x20
+Washers BC M10
x8
Screws BC M10x20
x4
Washers BC M10
Wrench 17mm
6
ASSEMBLY
3 ASSEMBLE THE CROSSBARS TO POSTS (x1)
NECESSARY
ITEMS
NECESSARY
ITEMS
4-ASSEMBLE THE BACK CONNECTING BAR TO REAR FRAMES (x1)
x12
Screws BC M10x20
x12
Washers BC M10
Wrench 17mm
Wrench 17mm
x4
Screws BC M10x20
x4
Washers BC M10
7
ASSEMBLY
5 ASSEMBLE BACKBOARD SUPPORT TO GOAL (x1)
NECESSARY
ITEMS
NECESSARY
ITEMS
5 ASSEMBLE BACKBOARD AND RING
Wrench 19mm
x4
Screws BC M12x120
X8
Nuts BC M12
x8
Washers BC M12
Plates 10x60x80
X2
X2
Screws round
-tipped BC M10x40
Nuts BC M10
X6
X4
Screws BC M10x50
x12
Washers BC M10
You can chose the height of the ring
(2.60m or 3.05m).
Use the cap to fill the unused hole.
X4
Cap D16
Wrench 17mm
NOMENCLATURE
Package
Ref Index Designation Description Quantity Packing Method
Weight
(kg)
Dim.
(mm)
A1
S18152GCW-01
A
Upper crossbar
Under crossbar
1+1
Plastic bubbles
+cardboard
5 layers
35
3020x250x230
A2
S18152GCW-02
A
Right post
Left post
1 +1
Plastic bubbles
+cardboard
5 layers
43
3680x250x250
A3
S18152GCW-03
A
Right rear frame
Left rear frame
1+1
Plastic bubbles
+cardboard
5 layers
30
670x1070x130
A4
S18152GCW-04
A Backboard support 1
Plastic bubbles
+cardboard
5 layers
17
710x630x270
A5
S18152GCW-05
A
Tube holding backboard
support
1
Plastic bubbles
+cardboard
5 layers
8
1150x90x90
A6
S18152GCW-06
A Back connecting bar 1
Plastic bubbles
+cardboard
5 layers
9
3060x170x80
A7
S18142GCW-08
A Connecting bars 2
Plastic bubbles
+cardboard
5 layers
7
1020x220x150
A8
S14310O +
S18152GCW-09
C
Ring + accessories
package
1
Plastic bubbles
+cardboard
5 layers
6.2
610x465x150
A9
S14520
H Backboard 1.2m x 0.9m 1
Plastic bubbles
+cardboard
5 layers
22
1205x905x30
PRE-ASSEMBLED ACCESORIES
Package
Designation Description Qty Note
A1 Conformity sticker 1
VISA PACKING DEPARTMENT DATE :
PACKING LIST
MULTI-FUNCTION
MULTI-FUNCTION GOAL
3.05m - 2.60m
PRODUCT REF S18152GCW Index C UNIT
PRE-ASSEMBLED ACCESORIES
Package
Designation Description Qty Note
A8
Screws BC M10x20
+ Washers BC M12
28+28
Fix the panel and the
basket to the
attachment plates
A8
Screws BC M12x120
+ Washers BC M12
+Nuts BC M12
4 + 8 + 4
Fix the arm to the
main tube
A8
Screws BC M10x50
+ Washers BC M10
+Nuts BC M10
4+8+4
Fix the panel to the
attachment plate
A8
Screws round-
tipped M10x40
+ Washer BC M10
+ Nuts M10
2+2+2 Fix the arm
A8 Plates 10x60x80 2
Assemble the
backboard support
A8 Caps D16 4
To fill the unused
holes
VISA PACKING DEPARTMENT DATE :
PACKING LIST
MULTI-FUNCTION
MULTI-FUNCTION GOAL
3.05m - 2.60m
PRODUCT REF S18152GCW Index C UNIT
/